The Jackson Project Tunnel Pipeline

October 3, 2013
next
A PUD employee tests the resistance of the meters on the switching station at the PUD power house near Sultan. About once every 10 years, the Snohomish County PUD drains and inspects the tunnel which transports water from the Spada Lake to the powerhouse. (Genna Martin / The Herald)

heraldnet logo