Heraldnet.com
WEDNESDAY, JULY 23, 2008 10:20 pm
LocalNorthwestNation & WorldPoliticsSpecial ReportsPhotosColumnistsMultimedia 
RECENT POSTS:
Emirates steams up the skies with A380  July 23

Boeing sees minimal jet deferrals, 'concerned' about oil prices   July 23

Boeing vs. Northrop: Tanker ad wars, ad nauseam  July 22

Boeing 767 with blended winglets takes flight  July 22

Lawmakers to Bush: 'Reject European pressure on tanker'  July 21

Archives:
LINKS:

Airbus
Airbus
EADS
Orders and Deliveries

Analysts
Richard Aboulafia
Scott Hamilton

Blogroll
FleetBuzz
IAG Blog
Randy Tinseth's blog

Flight museum
Future of Flight
Museum of Flight

Labor Group
International Association of Machinists
Local 751 Machinists
RELATED ARTICLES:
Acting Air Force secretary seeks confidence in tanker process  July 23
Profits slip, loans grow for Cascade Financial Corp.  July 23
Global trade key for Puget Sound region, officials say  July 22
Boeing buying unmanned aircraft builder  July 22
Boeing workers gauge prospects as union talks near  July 21
Airbus dominates Boeing at Farnborough air show  July 18
Breakthroughs led to airliner fuel-tank safety device  July 17
Boeing Machinists say they're willing to strike  July 17
Lynnwood OKs fiber-optic TV from Verizon  July 17
FAA orders retrofits of airliner fuel tanks  July 17
Interactive
Special report
 

ADVERTISEMENT

Aerospace Blog


The Boeing Co. (click to enlarge)
Boeing begins work on third flight test 787.
 
 

Final assembly begins for Dreamliner No. 5 -- picture


Posted at 11:48 am by Michelle Dunlop

After moving its 787 static test aircraft last week, the Boeing Co. has started final assembly on the fifth Dreamliner in Everett.

This will be the third flight test 787 jet. Two Dreamliners -- the static test and fatigue aircraft -- will not be delivered to customers. Boeing still plans to turn the power on to the first 787 in June and put that aircraft into flight in the fourth quarter of 2008.

In the press release, Boeing also announced it has named a new vice president of 787 Final Assembly and Change Incorporation. Jack Jones, 53, replaces Steve Westby, who retired yesterday. Jones has been with Boeing more than 25 years and most recently served as the director of field operations and delivery.

"'Traveled work' on this airplane is 65 percent less than on the first," Jones said, in the press statement.

During its 787 update call last month, Boeing officials had said this aircraft was 75 percent more complete than Dreamliner number one. However, after receiving all of the major components late last week, Boeing revised down its original estimate, said Mary Hanson, a spokeswoman for Boeing.
READER COMMENTS
Be the first to comment.
You must be a registered user and verify your e-mail address to post comments to blogs or articles on HeraldNet.

To register, click here. To read other terms and conditions, click here.
Log in or register to post new commentLog out
  Return to Aerospace Blog
TODAY'S TOP JOBS
 View All Top Jobs 
Top Cars
Top Homes


ADVERTISEMENT