Heraldnet.com
THURSDAY, AUGUST 28, 2008 5:24 pm
LocalNorthwestNation & WorldPoliticsSpecial ReportsPhotosColumnistsMultimedia 
RECENT POSTS:
Boeing sweetens offer to Machinists, retiree medical benefits safe  August 28

Boeing to give Machinists final offer today  August 28

Boeing Machinists: Strike for early retiree medical benefits? Poll  August 26

Boeing backs down on pension in second offer to Machinists   August 26

Boeing gambles big   August 26

Archives:
LINKS:

Airbus
Airbus
EADS
Orders and Deliveries

Analysts
Richard Aboulafia
Scott Hamilton

Blogroll
FleetBuzz
IAG Blog
Randy Tinseth's blog

Flight museum
Future of Flight
Museum of Flight

Labor Group
International Association of Machinists
Local 751 Machinists
SPEEA

Tanker competition
Air Force
Boeing's KC-767 tanker
Boeing's tanker blog
Government Accountability Office
Northrop's America's New Tanker
Northrop-EADS' KC-30

The Boeing Co.
Boeing Commercial Airplanes
Employment
New Airplane
Orders and Deliveries
RELATED ARTICLES:
Boeing makes final offer to Machinists  August 28
EADS going after U.S. defense work  August 28
Factory orders are bright spot for economy  August 28
Business briefly: Machinists rally in Everett over talks  August 28
Crashed Boeing MD-82 had earlier issues  August 28
Hijackers of 737 surrender in Libya  August 27
Boeing sweetens contract offer for Machinists  August 27
Tanker bids face likely delay  August 27
Boeing: Getting 747-8 and 777 ready for production  August 25
Boeing Machinists stand firm  August 25
Interactive
Special report
 

ADVERTISEMENT

Aerospace Blog


 
 

Alenia wraps up 787 horizontal stabilizer testing


Posted at 10:20 am by Michelle Dunlop

Boeing’s 787 partner Alenia Aeronautica says it has finished destructive testing on the Dreamliner’s horizontal stabilizer.

After testing the stabilizer over the past seven months, Italy’s Alenia says the part meets its certification requirements of being able to withstand 150 percent of its maximum load.

“Successful completion of the 787 horizontal stabilizer failure test marks the culmination of an innovative design and development activity,” said Randy Harley, Boeing’s vice president and general manager, 787 engineering and technology, in a press statement. ”Working together, the 787 team has once again confirmed the power of an integrated partnership.”

Boeing confirmed yesterday that an Alenia employee working in South Carolina caused damage to a 787 center fuselage by not following procedures. The damage on section 44 means that Boeing missed its goal of having all the assemblies for aircraft four in Everett by the end of June.

As a result, Boeing is revisiting its already delayed 787 schedule. The company had hoped to begin flight testing on the Dreamliner in the fourth quarter of this year. Boeing plans to put six test aircraft, including Dreamliner four, into flight test.

Just last week, Boeing’s chief executive Jim McNerney paid Alenia’s Grottaglie site another visit – his second trip to the Italian supplier. Alenia has pictures from his visit on its Web site.
READER COMMENTS
Be the first to comment.
You must be a registered user and verify your e-mail address to post comments to blogs or articles on HeraldNet.

To register, click here. To read other terms and conditions, click here.
Log in or register to post new commentLog out
  Return to Aerospace Blog
TODAY'S TOP JOBS
 View All Top Jobs 
Top Cars
Top Homes


ADVERTISEMENT