THE HERALD   EVERETT, WASHINGTON
HeraldNet on Facebook HeraldNet on Twitter HeraldNet RSS feeds
Welcome, Guest | Register | Sign In
 Home   Work        Follow Business_Herald on Twitter @Business_Herald   RSS feed RSS
Published: Saturday, November 15, 2008

Boeing completes destructive testing on 787 Dreamliner wing box

SEATTLE -- Boeing said today it has completed destructive testing on a full-scale composite wing box of the 787 Dreamliner, the first all-composite wing box ever built for a Boeing commercial airplane.

The test is part of the certification process for the new jetliner.

"Successful completion of the wing box destruction test marks a major step forward in highlighting the innovation on the 787," Mark Jenks, vice president of 787 Development said in a statement. "In addition to determining the strength of the structure, the test helps us verify the analytical methods we have used to calculate the loads the structure will have to carry."

To meet certification requirements, the wings must withstand loads up 150 percent of the highest load that the jet could ever be expected to see in the lifetime of the 787 fleet.

The test wing box was designed and built by a joint team of Boeing, Mitsubishi Heavy Industries and Fuji Heavy Industries.

Structural testing will continue on two full-scale 787 airframes as part of the certification process for the airplane, Boeing said.
Comments
NORTHSOUND ClassifiedsNORTHSOUND Classifieds
Top Jobs
Homes
Autos

HeraldNet highlights

A newbie dives in
A newbie dives in: Cascade High team teaches a sportswriter to swim (video)
Arson death haunts survivors
Arson death haunts survivors: 25 years later, family and comrades remember firefighter
Start thinking taxes now
Start thinking taxes now: Tips to pay what you must -- and no more
No more Mr. Nice Guy
No more Mr. Nice Guy: Mariners' Wedge plans to raise the bar