Heraldnet.com
THURSDAY, NOVEMBER 26, 2009 4:15 am
LocalNorthwestNation & WorldPoliticsSpecial ReportsPhotosColumnistsMultimedia 
RECENT POSTS:
Air Force steps up pace on tanker Q&A  November 25

Pan Am 747 honored in man's garage  November 25

State gives $250k to SnoCo. aerospace center  November 24

Northrop: Boeing's 767 ‘no longer commercially viable'  November 24

US Airways pushes out Airbus deliveries  November 24

Archives:
LINKS:

Airbus
Airbus
EADS
Orders and Deliveries

Analysts
Richard Aboulafia
Scott Hamilton

Blogroll
FleetBuzz
IAG Blog
Randy Tinseth's blog

Flight museum
Future of Flight
Museum of Flight

Labor Group
International Association of Machinists
Local 751 Machinists
SPEEA

Tanker competition
Air Force
Boeing's KC-767 tanker
Boeing's tanker blog
Government Accountability Office
Northrop's America's New Tanker
Northrop-EADS' KC-30

The Boeing Co.
Boeing Commercial Airplanes
Employment
New Airplane
Orders and Deliveries
RELATED ARTICLES:
Community Extra: Applause  November 26
Laid-off Boeing workers could qualify for more benefits  November 26
Biz week  November 22
Boeing begins work on new 787 plant   November 21
First 747-8 Freighter sports new paint job  November 19
Northwest Briefly: Win trips during campaign to boost state’s tourism  November 19
Kent police investigating Boeing plant death  November 18
Ice, likely from airliner, crashes into home  November 18
Boeing sued over 787 delays  November 18
Boeing takes orders at Dubai show for 11 737s  November 18
Interactive
Special report
 

ADVERTISEMENT

Aerospace Blog


Michael O'Leary/The Herald (click to enlarge)
The Boeing Co.'s newest plane taxied on the runway in early July, performing low speed tests and brake tests. Boeing plans to put the 787 in the air by year's end.
 
 

Boeing again says 787 to fly this year, notes progress


Posted at 1:15 pm by Michelle Dunlop
Herald Writer


The Boeing Co. has finished installing the fix on its new 787 jet, which it plans to fly by year's end.

“Completing this work is a significant step toward first flight,” said Scott Fancher, vice president and general manager of the 787 program. “We continue to be pleased with the progress of the team and remain confident the first flight of the 787 Dreamliner will occur before the end of the year.”

Boeing postponed the first flight of its mostly composite 787 jet in June, after finding a structural weakness in the airplane's side-of-body area. Workers at the company's Everett factory have been modifying the first 787 aircraft to strengthen the side. The modification entails installing new fittings at 34 stringer locations within the joint where the wing is attached to the fuselage.

The modifications were completed yesterday, Boeing said. The company expects to complete the installations on the static test airframe and the second flight-test airplane in the coming days.

"We will test the modification on the full-scale static test airframe later this month,” Fancher said. “As soon as we confirm the loads are being handled appropriately in the joint we will complete preflight activities on the airplane.”

After modifications are complete on the static test airframe, it will be refitted with strain gauges and instrumentation required for testing.

Boeing also is restoring access doors, systems, seals and fasteners that were removed from the first 787. When that task is finished, the flight-test team will perform another set of gauntlet and taxi tests to ensure that all systems are ready for flight. Fancher noted that with the exception of a single high-speed taxi test, all remaining flight-test activities have been successfully completed on the first flight-test airplane.

Overall, the work on modifying airplanes is progressing well, Fancher said.

Boeing has won 850 orders for its 787 Dreamliner and expects to deliver the first aircraft in the fourth quarter of 2010, more than two years late.
READER COMMENTS
Be the first to comment.
You must be a registered user and verify your e-mail address to post comments to blogs or articles on HeraldNet.

To register, click here. To read other terms and conditions, click here.
Log in or register to post new commentLog out
  Return to Aerospace Blog

Always Free
Transmission Diagnostic

FREE 6 lb. Pad w/
30yd Carpet Purchase

Holiday Getaway
$99 dbl Occupancy

Buy 1 Dinner Entree
Get 2nd 50% Off

15% Off
All Repairs!

$2 OFF
at Box Office

$1 off French Dip
$4.99 Burger Basket

Oil - Snohomish County
Low Prices - Fill Now!

$5 OFF
Lunch or Dinner

Lube, Oil & Filter
Buy 1 - Get 1 FREE

$5 Off
Stylecut

Nutcracker
Family Packs Available

Holiday Specials
up to 25% off!

Over 1 Million Lights
Lights of Christmas

Buy 1 Get 1 FREE
Lube Oil Filter

20% Off Dinner
Up to $75 Value!

75% OFF
Many Items. Hurry!

25% off Bath & Groom
New Customers
TODAY'S TOP JOBS
 View All Top Jobs 
Top Cars
Top Homes

ADVERTISEMENT