THE HERALD   EVERETT, WASHINGTON
HeraldNet on Facebook HeraldNet on Twitter HeraldNet RSS feeds HeraldNet Pinterest HeraldNet Google Plus
Welcome, Guest | Register | Sign In
 Home    Blogs   Aerospace blog        Follow HeraldNetBoeing on Twitter @HeraldNetBoeing   RSS feed RSS
Michelle Dunlop | mdunlop@heraldnet.com

Report: Boeing delays 787 delivery to July

French newspaper cites talks between Boeing, Air France




A French newspaper is reporting that the Boeing Co. will delay deliveries of its new 787 until July.

Boeing halted flight tests of its 787 after a Nov. 9 electrical fire onboard a test plane. Although the company says it has determined the cause of that fire, Boeing has not announced a revised delivery schedule for the Dreamliner, which already is nearly three years behind schedule.

Boeing could begin deliveries next summer, Les Echos reported, based on talks between Boeing and Air France.

Boeing has been working on what it describes as minor design changes to the power panel affected by the fire as well as software changes to the 787.

Air France is not the first customer scheduled to receive a 787. Boeing plans to deliver the first Dreamliner to Japan's All Nippon Airways.


Comments


NORTHSOUND ClassifiedsNORTHSOUND Classifieds
Top Jobs
Homes
Autos

HeraldNet highlights

Blooming nuisance
Blooming nuisance: Scotch broom is bursting along roadways again
Off-beat in New York
Off-beat in New York: What to see to get a real feel for the fascinating city
Cougar goes grudgingly
Cougar goes grudgingly: Found near Arlington, cougar is caught and released (gallery)
Student returns to cheers
Student returns to cheers: Nic Trout makes first visit to M-P since he was paralyzed