The Herald of Everett, Washington
HeraldNet on Facebook HeraldNet on Twitter HeraldNet RSS feeds HeraldNet Pinterest HeraldNet Google Plus HeraldNet Youtube
HeraldNet Newsletters  Newsletters: Sign up | Manage  Green editions icon Green editions

Calendar

Splash! Summer guide

HeraldNet Headlines
HeraldNet Newsletter Delivered to your inbox each week.
Published: Friday, June 8, 2012, 12:01 a.m.

Interurban Trail link complete

A new section of the Seattle-to-Everett trail runs from Terrace to Shoreline

  • A bicyclist rides down a new section of the Interurban Trail on the 7400 block of McAleer Way in Edmonds on May 31.

    Chris Goodenow / For The Herald

    A bicyclist rides down a new section of the Interurban Trail on the 7400 block of McAleer Way in Edmonds on May 31.

  • Chris Goodenow / For The Herald 
Neighbors Susan Swartz (left) and Mark Burns, both of Edmonds, walk their dogs, Titan (from left), a 21-month-old mal...

    Chris Goodenow / For The Herald Neighbors Susan Swartz (left) and Mark Burns, both of Edmonds, walk their dogs, Titan (from left), a 21-month-old male golden retriever; Bella, a 3-year-old female golden retriever and English settler mix; and Reno, a 3-year-old female golden retriever, on a new section of the Interurban Trail, on May 31 in the 7400 block of McAleer Way in Edmonds.

EDMONDS -- The missing link of the Interurban Trail in the city has finally been completed, running for more than a mile and connecting previously completed trails in Shoreline and Mountlake Terrace.
A nearly half-mile portion of the Edmonds trail includes a 12-foot-wide paved path, with landscaping, benches, historical markers, a bicycle rack, a shelter and an informational kiosk, said Carrie Hite, parks and recreation director for the city of Edmonds.
Bike lanes were added to 76th Avenue W., along the residential part of Edmonds' 1.37-mile section.
Design elements give a tip of the hat to the trail's railroad roots. Simulated rails run through the trail's surface in the plaza area, Ballinger Station. That area is reminiscent of an old train station and serves as a rest stop with a drinking fountain, a shelter and a bench along with historical panels telling the story of the Interurban Trolley which ran from Seattle to Everett until 1939.
The total trail runs 30 miles from North Seattle to Everett.
Construction of the Edmonds segment began in September. The Edmonds project's budget is $1.8 million. More than $1 million came from state and federal grants.
A ribbon-cutting ceremony is set for June 19 to mark the segment's completion with final parts of the project still being completed.
Trail celebration
A ribbon-cutting ceremony is planned for 2 p.m. June 19 for the completion of the Edmonds Interurban Trail. The event is planned to be held at Ballinger Station rest plaza, at 76th Avenue W. and McAleer Way.
Story tags » EdmondsBikingRunningWalkingFitness

Share your comments: Log in using your HeraldNet account or your Facebook, Twitter or Disqus profile. Comments that violate the rules are subject to removal. Please see our terms of use. Please note that you must verify your email address for your comments to appear.

You are logged in using your HeraldNet ID. Click here to update your profile. | Log out.

Our new comment system is not supported in IE 7. Please upgrade your browser here.

comments powered by Disqus
digital subscription promo

Subscribe now

Unlimited digital access starting at 99 cents, or included with any print subscription.

HeraldNet highlights

Bad behavior
Bad behavior: Start of crab season brings out the worst in some
Longer, farther
Longer, farther: Air New Zealand gets first stretched 787
From seed to store
From seed to store: Photo essay: Follow marijuana from the grower to the seller
Summer spirits
Summer spirits: Four refreshing drinks for hot days, suggested by local experts