The Herald of Everett, Washington
HeraldNet on Facebook HeraldNet on Twitter HeraldNet RSS feeds HeraldNet Pinterest HeraldNet Google Plus HeraldNet Youtube
HeraldNet Newsletters  Newsletters: Sign up | Manage  Green editions icon Green editions

Calendar

Splash! Summer guide

Weekly business news
HeraldNet Newsletter Delivered to your inbox each week.
Published: Monday, March 25, 2013, 2:19 p.m.

Boeing 787 completes test flight to check battery system

  • A Boeing 787, with LOT Polish Airlines livery, lands Monday at Paine Field in Everett after a test flight.

    Dan Bates / The Herald

    A Boeing 787, with LOT Polish Airlines livery, lands Monday at Paine Field in Everett after a test flight.

EVERETT -- A Boeing 787 flew from Paine Field on a two-hour test flight on Monday to see if a redesigned battery system works properly while the plane is in the air. Boeing was to analyze data after the flight but there appeared to be no problems.
The test flight was an important step in Boeing's plan to convince safety regulators to allow airlines to resume using the plane. Boeing used a 787 that it built for LOT Polish Airlines.
After takeoff at 12:11 p.m., the plane headed west to Neah Bay, then south along the Washington and Oregon coastline to Newport, Ore., where it reversed course. The Dreamliner crossed the Olympic Peninsula diagonally, then veered west again to the Pacific Ocean, returning to Paine Field at about 2:20 p.m.
Boeing Co. 787s have been grounded since January, when a lithium-ion battery on one plane caught fire after it landed in Boston and the battery on another began smoking during a flight in Japan, forcing an emergency landing.
In redesigning the system, Boeing added insulation around battery cells and a steel casing on the outside to prevent fires. Company officials have said that they might never know the cause of the smoldering batteries, but they hope to get the planes back in the air within weeks.
The National Transportation Safety Board and Japanese authorities are investigating the incidents.
In announcing the test flight, Boeing said in a statement that it would be "a normal Boeing production check flight intended to validate that all systems function as designed. During a functional check flight, crews cycle the landing gear and operate all the backup systems, in addition to performing electrical system checks from the flight profile. Across airplane programs, more than 600 functional check flights were completed in 2012.
"Following the completion of the functional check flight, we will analyze the data from the flight and prepare for certification ground and flight demonstration in the coming days," Boeing said.
The NTSB plans to hold a forum next month in Washington on the use of lithium-ion batteries in transportation. The agency said Monday that the event April 11-12 will focus on design and performance of the batteries and regulation of their manufacturing and use.
Story tags » 787

Share your comments: Log in using your HeraldNet account or your Facebook, Twitter or Disqus profile. Comments that violate the rules are subject to removal. Please see our terms of use. Please note that you must verify your email address for your comments to appear.

You are logged in using your HeraldNet ID. Click here to update your profile. | Log out.

Our new comment system is not supported in IE 7. Please upgrade your browser here.

comments powered by Disqus
digital subscription promo

Subscribe now

Unlimited digital access starting at 99 cents, or included with any print subscription.

HeraldNet highlights

For love of the game
For love of the game: ‘There’s no such thing as enough baseball’ for...
Critters zap selves, your lights
Critters zap selves, your lights: Animals blamed for 17% of PUD outages
Eyes on their screens
Eyes on their screens: Advice for parents of constantly connected teenagers
A perfect picnic
A perfect picnic: What you need for a romantic date or a family trip