A closure of southbound Highway 529 at the Snohomish River Bridge previously scheduled for tonight has been canceled.
The bridge was closed nights earlier this week as crews did preparatory work to replace the machinery that opens and closes the drawspan.
The work is part of a $3.2 million replacement of the drawspan scheduled for this summer.
Talk to us
> Give us your news tips.
> Send us a letter to the editor.
> More Herald contact information.