The Herald of Everett, Washington
HeraldNet on Facebook HeraldNet on Twitter HeraldNet RSS feeds HeraldNet Pinterest HeraldNet Google Plus HeraldNet Youtube
HeraldNet Newsletters  Newsletters: Sign up | Manage  Green editions icon Green editions

Calendar


HeraldNet Headlines
HeraldNet Newsletter Delivered to your inbox each week.
Published: Thursday, August 29, 2013, 12:01 a.m.

Bay Bridge and its comedy of errors

As mayor of Oakland, Calif., Jerry Brown wanted an "icon" to replace the seismically challenged eastern span of the Bay Bridge and to highlight the "splendor" of the East Bay. "It's unfortunate that pencil pushers, bureaucrats and political yahoos don't understand quality and try to block quality to save a few bucks," observed the Oracle of Oakland.
Influential civil engineer Tung-Yen Lin had a different take when a panel approved the signature design favored by local pols. Lin predicted it would become "a monument to stupidity."
On Labor Day weekend, transportation officials will open the self-anchored suspension span, 24 years after a chunk of the old span collapsed during the Loma Prieta earthquake, six years after the signature span was supposed to be completed and more than $5 billion over budget.
Brown, now California's governor, will be conspicuously absent, attending his wife's family reunion in Michigan. I am sure his absence has nothing to do with the fact that the replacement span isn't open for traffic yet -- and already it needs a retrofit.
In March, 32 of 96 key galvanized steel rods cracked after they were tightened. They cannot be replaced because they've been encased in concrete for years. Engineers have come up with a plan to put steel "saddles" around the bad bolts at an expected cost of $23 million.
University of California, Berkeley structural engineering professor Abolhassan Astaneh-Asl thinks the new span is not safe. The single-anchor design is flawed, he warned, and the brittle bolts cannot withstand an earthquake.
Steve Heminger, executive director of the Metropolitan Transportation Commission, has assured me that he wouldn't approve opening the new span if he didn't think it to be safe. God help me, I believe him. When the transit wonks talk about redundancies in the system that can accommodate the saddles doing the work of the cracked rods, I want to believe.
I make the leap of faith even though I know that Heminger didn't know about the potential "brittle failure" until the rods snapped. Worse, his experts didn't see the problem coming.
I want to believe because it's too painful to think that after spending $6.4 billion and squandering 24 years, the Bay Area is going to get a shiny new toy that could fold like a cheap lawn chair during the next big temblor.
Will anyone pay for these costly, potentially fatal mistakes? "I don't know the answer to that," MTC spokesman Randy Rentschler told me. It hasn't happened yet.
The bad design was decided 15 years ago and by committee. The bad bolt decisions were made a decade ago. So what can the bridge suits do -- yank some retired bureaucrat out of mothballs and frog-march him into the drink?
If there is going to be any accountability, it has to come from the top. Good luck with that. When a reporter asked Brown about the bridge in May, Dao Gov answered, "S--- happens."
Brown expects Californians to trust him to launch the construction of a 350-mile, $68 billion high-speed rail project. And he put a former head of Caltrans, Jeffrey Morales, in charge of the California High-Speed Rail Authority.
He doesn't have to rethink his infrastructure plans just because Caltrans demonstrated it can't build a 2.2-mile bridge with no (one hopes) moving parts on budget, on time and with intact bolts. So trust Brown with high-speed rail, but don't blame him if stuff happens.
Email Debra J. Saunders at dsaunders@sfchronicle.com.

Share your comments: Log in using your HeraldNet account or your Facebook, Twitter or Disqus profile. Comments that violate the rules are subject to removal. Please see our terms of use. Please note that you must verify your email address for your comments to appear.

You are logged in using your HeraldNet ID. Click here to update your profile. | Log out.

Our new comment system is not supported in IE 7. Please upgrade your browser here.

comments powered by Disqus
digital subscription promo

Subscribe now

Unlimited digital access starting at 99 cents, or included with any print subscription.

loading...

Herald Editorial Board

Jon Bauer, Opinion Editor: jbauer@heraldnet.com

Carol MacPherson, Editorial Writer: cmacpherson@heraldnet.com

Neal Pattison, Executive Editor: npattison@heraldnet.com

Josh O'Connor, Publisher: joconnor@heraldnet.com

Have your say

Feel strongly about something? Share it with the community by writing a letter to the editor. Send letters by e-mail to letters@heraldnet.com, by fax to 425-339-3458 or mail to The Herald - Letters, P.O. Box 930, Everett, WA 98206. Include your name, address and daytime phone number. (We'll only publish your name and hometown.) We reserve the right to edit letters, but if you keep yours to 250 words or less, we won’t ask you to shorten it. If your letter is published, please wait 30 days before submitting another. Have a question about letters? Contact Carol MacPherson at cmacpherson@heraldnet.com or 425-339-3472.

HeraldNet highlights

Making noise in Everett
Making noise in Everett: Duo has big dreams for the city's music scene
Looking for a friend?
Looking for a friend?: Animals up for adoption at the Everett shelter (10 new photos)
First stop for tourists
First stop for tourists: County tourism volunteers inform, point the way
Remembering Jerry
Remembering Jerry: EvCC groundskeeper Gerald Olmstead was always happy
SnoCoSocial