Grant to fund full intersection at Highway 99 trouble spot

EDMONDS — For drivers who have to dart across Highway 99 to make a left turn onto 76th Avenue W., help is on the way.

The city of Edmonds has been awarded a grant to build a new road to connect Highway 99 to a current dead end on 228th Street SW. On the west side of Highway 99, 228th connects. But on the east side it stops short of the highway at 76th.

A vacant, unused stretch of city right-of-way about 300 feet long sits between 76th and Highway 99. The project will involve building a road across this section to a full intersection, with stoplights on 228th Street SW at Highway 99 and at 76th, city engineer Rob English said.

The new intersections will enable the city to close the left-turn lane from southbound Highway 99 to 76th, where drivers now have to wait for an opening without the aid of a signal. It also will make for an easier connection for many drivers headed to I-5 and the Mountlake Terrace park-and-ride center. East of Highway 99, 228th curves and becomes Lakeview Drive and 236th Street SW, connecting to I-5 and the park-and-ride.

The area to be altered now has a high accident rate, English said. When the new road is built, southbound Highway 99 drivers wishing to reach that portion of 76th will go to the controlled intersection at 228th, and then turn left.

Northbound highway drivers may turn right onto 228th rather than having to turn earlier or later. Drivers on 228th headed toward Highway 99 from the east may proceed directly to the highway rather than having to skirt around the dead-end. Those headed toward the highway from the west may go straight across if they wish rather than having to turn left or right.

Construction is expected to begin next summer and conclude in the second half of 2015, English said.

The $6.7 million project is financed in large part by state and federal grants, he said. The latest piece is $1.7 million from the state Transportation Improvement Board, part of a recent $111 million allocation to 103 cities and counties.

The city of Edmonds is on the hook for only about $191,000 of the $6.7 million total, English said.

Bike lanes and sidewalks will be part of the new section of 228th Street SW.

Bill Sheets: 425-339-3439; sheets@heraldnet.com.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Traffic idles while waiting for the lights to change along 33rd Avenue West on Tuesday, April 2, 2024 in Lynnwood, Washington. (Olivia Vanni / The Herald)
Lynnwood seeks solutions to Costco traffic boondoggle

Let’s take a look at the troublesome intersection of 33rd Avenue W and 30th Place W, as Lynnwood weighs options for better traffic flow.

A memorial with small gifts surrounded a utility pole with a photograph of Ariel Garcia at the corner of Alpine Drive and Vesper Drive ion Wednesday, April 10, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Death of Everett boy, 4, spurs questions over lack of Amber Alert

Local police and court authorities were reluctant to address some key questions, when asked by a Daily Herald reporter this week.

The new Amazon fulfillment center under construction along 172nd Street NE in Arlington, just south of Arlington Municipal Airport. (Chuck Taylor / The Herald) 20210708
Frito-Lay leases massive building at Marysville business park

The company will move next door to Tesla and occupy a 300,0000-square-foot building at the Marysville business park.

Everett
Red Robin to pay $600K for harassment at Everett location

A consent decree approved Friday settles sexual harassment and retaliation claims by four victims against the restaurant chain.

A Tesla electric vehicle is seen at a Tesla electric vehicle charging station at Willow Festival shopping plaza parking lot in Northbrook, Ill., Saturday, Dec. 3, 2022. A Tesla driver who had set his car on Autopilot was “distracted” by his phone before reportedly hitting and killing a motorcyclist Friday on Highway 522, according to a new police report. (AP Photo/Nam Y. Huh)
Tesla driver on Autopilot caused fatal Highway 522 crash, police say

The driver was reportedly on his phone with his Tesla on Autopilot on Friday when he crashed into Jeffrey Nissen, killing him.

Janet Garcia walks into the courtroom for her arraignment at the Snohomish County Courthouse on Monday, April 22, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Everett mother pleads not guilty in stabbing death of Ariel Garcia, 4

Janet Garcia, 27, appeared in court Monday unrestrained, in civilian clothes. A judge reduced her bail to $3 million.

magniX employees and staff have moved into the company's new 40,000 square foot office on Seaway Boulevard on Monday, Jan. 18, 2020 in Everett, Washington. magniX consolidated all of its Australia and Redmond operations under one roof to be home to the global headquarters, engineering, manufacturing and testing of its electric propulsion systems.  (Andy Bronson / The Herald)
Harbour Air plans to buy 50 electric motors from Everett company magniX

One of the largest seaplane airlines in the world plans to retrofit its fleet with the Everett-built electric propulsion system.

Logo for news use featuring the municipality of Snohomish in Snohomish County, Washington. 220118
Driver arrested in fatal crash on Highway 522 in Maltby

The driver reportedly rear-ended Jeffrey Nissen as he slowed down for traffic. Nissen, 28, was ejected and died at the scene.

Logo for news use featuring the municipality of Mountlake Terrace in Snohomish County, Washington. 220118
3 charged with armed home invasion in Mountlake Terrace

Elan Lockett, Rodney Smith and Tyler Taylor were accused of holding a family at gunpoint and stealing their valuables in January.

PAWS Veterinarian Bethany Groves in the new surgery room at the newest PAWS location on Saturday, April 20, 2024 in Snohomish, Washington. (Olivia Vanni / The Herald)
New Snohomish hospital makes ‘massive difference’ for wild animals

Lynnwood’s Progressive Animal Welfare Society will soon move animals to its state of the art, 25-acre facility.

Traffic builds up at the intersection of 152nd St NE and 51st Ave S on Tuesday, April 16, 2024, in Marysville, Washington. (Ryan Berry / The Herald)
Here’s your chance to weigh in on how Marysville will look in 20 years

Marysville is updating its comprehensive plan and wants the public to weigh in on road project priorities.

Mountlake Terrace Mayor Kyko Matsumoto-Wright on Wednesday, April 10, 2024 in Mountlake Terrace, Washington. (Olivia Vanni / The Herald)
With light rail coming soon, Mountlake Terrace’s moment is nearly here

The anticipated arrival of the northern Link expansion is another sign of a rapidly changing city.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.