Highway 530 at mudslide could be cleared for use in June

OSO — As Gov. Jay Inslee scanned the stretch of Highway 530 where workers were clearing mudslide debris on Thursday, he marveled at the progress.

State transportation officials told Inslee they hope to re-open the former highway by mid- to late-June. Although it will still be in rough shape, it should be faster and safer than an unpaved utility road in use now as a detour.

They also aim to have a permanent, elevated highway built by October, before flood danger increases.

“I think we’ve seen the power of teamwork, the power of compassion and the power of volunteers,” Inslee said.

Uncertainty surrounding the river could still pose engineering challenges, the governor added.

Inslee was making his first trip to slide-affected areas in about three weeks. He’s visited the area more than a dozen times since disaster struck on March 22.

The slide ran across the valley, leaving 10 million cubic yards of dirt, trees and debris strewn over a square mile. It buried 40 homes.

Searchers recovered the remains of 41 people killed by the slide. They scaled back search operations in late April. Two people remain missing and are presumed dead.

With odds of recovering more remains diminishing, authorities have turned their focus to rebuilding Highway 530, a vital economic link for Darrington and surrounding communities.

The governor received an update Thursday from Bill Vlcek, a regional administrator for the state Department of Transportation.

Crews have hauled away about 23,000 cubic yards of mud, about 20 truckloads per hour, Vlcek said. The material is being dumped at a former county landfill in Oso after being screened for hazardous materials and personal belongings.

A contractor has cleared about 1,100 feet of the highway buried by the slide, he said. So far, most of the roadway is intact. Of what they’ve uncovered, only about 160 feet of roadway were destroyed.

There’s an estimated 800 feet to go before they’ve cleared the road surface.

“We’re hoping to get traffic on 530, off the utility road, by the middle to end of June,” Vlcek said.

Until the one-lane temporary access road opened late last month, reaching Darrington from Arlington by car entailed a two-hour trip via Highway 20 in Skagit County. That added huge fuel costs for commuters and for businesses such as Hampton Lumber, Darrington’s largest employer.

Inslee’s previous visit to the area, on April 25, was to announce $300,000 in assistance for Hampton to offset the added expense of bringing timber to market.

To use the access road, drivers line up and wait in what’s been likened to a ferry line. They follow a pilot car at a constant 10 mph over the two-mile route.

The state awarded Granite Construction Co. of Everett a $3.8 million contract to operate the road around the clock. Up to seven employees work in eight-hour shifts as flaggers or pilot-car drivers, company spokeswoman Jacque Fourchy said.

The state also inked a $5 million contract with IMCO Construction of Ferndale to remove slide debris from the highway.

By the end of the month, state officials expect to award a third contract to rebuild Highway 530, transportation department spokesman Travis Phelps said. They hope to start work in June and finish in October.

The contract will cover about two miles of roadway, Phelps said. The work extends beyond areas covered or ruined by debris because of the need to elevate the road above flood levels.

Noah Haglund: 425-339-3465, nhaglund@heraldnet.com.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Traffic idles while waiting for the lights to change along 33rd Avenue West on Tuesday, April 2, 2024 in Lynnwood, Washington. (Olivia Vanni / The Herald)
Lynnwood seeks solutions to Costco traffic boondoggle

Let’s take a look at the troublesome intersection of 33rd Avenue W and 30th Place W, as Lynnwood weighs options for better traffic flow.

A memorial with small gifts surrounded a utility pole with a photograph of Ariel Garcia at the corner of Alpine Drive and Vesper Drive ion Wednesday, April 10, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Death of Everett boy, 4, spurs questions over lack of Amber Alert

Local police and court authorities were reluctant to address some key questions, when asked by a Daily Herald reporter this week.

The new Amazon fulfillment center under construction along 172nd Street NE in Arlington, just south of Arlington Municipal Airport. (Chuck Taylor / The Herald) 20210708
Frito-Lay leases massive building at Marysville business park

The company will move next door to Tesla and occupy a 300,0000-square-foot building at the Marysville business park.

Bothell
Man gets 75 years for terrorizing exes in Bothell, Mukilteo

In 2021, Joseph Sims broke into his ex-girlfriend’s home in Bothell and assaulted her. He went on a crime spree from there.

Allan and Frances Peterson, a woodworker and artist respectively, stand in the door of the old horse stable they turned into Milkwood on Sunday, March 31, 2024, in Index, Washington. (Ryan Berry / The Herald)
Old horse stall in Index is mini art gallery in the boonies

Frances and Allan Peterson showcase their art. And where else you can buy a souvenir Index pillow or dish towel?

Dorothy Crossman rides up on her bike to turn in her ballot  on Tuesday, Aug. 1, 2023 in Everett, Washington. (Olivia Vanni / The Herald)
Voters to decide on levies for Arlington fire, Lakewood schools

On Tuesday, a fire district tries for the fourth time to pass a levy and a school district makes a change two months after failing.

Everett
Red Robin to pay $600K for harassment at Everett location

A consent decree approved Friday settles sexual harassment and retaliation claims by four victims against the restaurant chain.

A Tesla electric vehicle is seen at a Tesla electric vehicle charging station at Willow Festival shopping plaza parking lot in Northbrook, Ill., Saturday, Dec. 3, 2022. A Tesla driver who had set his car on Autopilot was “distracted” by his phone before reportedly hitting and killing a motorcyclist Friday on Highway 522, according to a new police report. (AP Photo/Nam Y. Huh)
Tesla driver on Autopilot caused fatal Highway 522 crash, police say

The driver was reportedly on his phone with his Tesla on Autopilot on Friday when he crashed into Jeffrey Nissen, killing him.

Janet Garcia walks into the courtroom for her arraignment at the Snohomish County Courthouse on Monday, April 22, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Everett mother pleads not guilty in stabbing death of Ariel Garcia, 4

Janet Garcia, 27, appeared in court Monday unrestrained, in civilian clothes. A judge reduced her bail to $3 million.

magniX employees and staff have moved into the company's new 40,000 square foot office on Seaway Boulevard on Monday, Jan. 18, 2020 in Everett, Washington. magniX consolidated all of its Australia and Redmond operations under one roof to be home to the global headquarters, engineering, manufacturing and testing of its electric propulsion systems.  (Andy Bronson / The Herald)
Harbour Air plans to buy 50 electric motors from Everett company magniX

One of the largest seaplane airlines in the world plans to retrofit its fleet with the Everett-built electric propulsion system.

Logo for news use featuring the municipality of Snohomish in Snohomish County, Washington. 220118
Driver arrested in fatal crash on Highway 522 in Maltby

The driver reportedly rear-ended Jeffrey Nissen as he slowed down for traffic. Nissen, 28, was ejected and died at the scene.

Logo for news use featuring the municipality of Mountlake Terrace in Snohomish County, Washington. 220118
3 charged with armed home invasion in Mountlake Terrace

Elan Lockett, Rodney Smith and Tyler Taylor were accused of holding a family at gunpoint and stealing their valuables in January.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.