Everett plan aims to prevent repeat sewer backups

EVERETT — As the anniversary of last summer’s torrential rainstorms approaches, the city has unveiled a plan to prevent future flooding in 1,800 homes and businesses that are especially vulnerable.

The city wants to install backwater valves in those buildings, and is offering to pick up most of the cost, while at the same time putting a cap on future insurance claims stemming from flood damage.

A backwater valve, installed on a side sewer line between a house and a sewer main, prevents a backed-up main from flooding into a building’s drains.

A public hearing on the proposed ordinance will be held Wednesday before the City Council votes on the plan during its meeting.

The need for a solution became clear on Aug. 29, 2013, when a violent squall dumped rain on the city at a rate of 2.8 inches per hour. It was the most intense storm recorded in the city since it started keeping records in the 1940s.

Another storm hit Sept. 6, and over the course of those several days, scores of homes and businesses were flooded from backed up stormwater and sewage.

A big part of the problem lies in Everett’s combined sewer-stormwater system, which covers about 6,500 acres of north Everett. Most of the flooding in 2013 took place in areas served by the combined system.

Separating the two systems’ 145 miles of pipe, however, is a gargantuan undertaking the city estimates would take 30 years and cost up to $1 billion.

By contrast, installing backwater valves at the most vulnerable properties is a comparatively quick and cheap project that might prevent significant sewage backups while a more long-term plan for the city sewer and stormwater system is developed.

“It’s one of the few things we can do quickly,” Public Works Director Dave Davis said.

The city estimates that the valve installation would take three years and cost about $4.5 million to do all 1,800 buildings.

Those buildings were identified by mathematically modeling a large “400-year” storm — larger than last year’s storms — and measuring its estimated impact over the entire city sewer system to figure out which buildings would likely experience basement flooding.

The city will also offer a rebate program, in which home or business owners can undertake the work themselves and be reimbursed by the city up to $2,500, the approximate cost of the installation. Part of that will involve disconnecting downspouts that drain into the sewer system and redirecting stormwater runoff onto the property’s lawn.

The rebate program is intended to encourage property owners to undertake the installation themselves and not wait for the city to do the work. Owners of those 1,800 designated properties will receive a notice in the mail.

If a property owner does not install a valve, the city will eventually install one in the public right-of-way on the sewer line leading to that property.

If the rebate program is the carrot to get residents to take the initiative to install the valves, the stick is the cap on settlements.

The city estimates it will pay out about $4.3 million in claims from the 2013 floods. It’s paid out about $2.5 million already, with only larger claims from commercial properties awaiting settlement.

Effective immediately after the ordinance is signed, all claims related to sewer system backups will be capped at $25,000 per structure, or, for tenants, $5,000 per unit to cover personal property losses.

In addition, the city will not settle claims related to those 1,800 properties that do not have an installed backwater valve and disconnected downspout, unless those claims come in prior to the deadline date, the owner wasn’t given a deadline or the backup was caused by the city’s own negligence.

The public works department can extend the deadlines, if needed.

What do about the larger issue of the city’s combined sewer and stormwater system is still being studied.

The combined system was constructed between 1897 and 1963, entirely in the north end of the city. Sewers installed after that period were separated from stormwater pipes.

The city’s Public Works Department is considering a few long-term plans that would separate the two systems, ranging up to the full $1 billion and 30-year complete overhaul.

The least expensive option would cost $283 million and take a decade to complete. All three options would result in higher sewer rates.

The department is expected to make a proposal to the City Council this fall.

Chris Winters: 425-374-4165; cwinters@heraldnet.com. Twitter: @Chris_At_Herald.

Public hearing

A public hearing will be held on the new sewer flooding prevention ordinance during the City Council meeting Wednesday. The meeting starts at 6:30 p.m. in the Council Chambers, located at 3002 Wetmore Ave.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Traffic idles while waiting for the lights to change along 33rd Avenue West on Tuesday, April 2, 2024 in Lynnwood, Washington. (Olivia Vanni / The Herald)
Lynnwood seeks solutions to Costco traffic boondoggle

Let’s take a look at the troublesome intersection of 33rd Avenue W and 30th Place W, as Lynnwood weighs options for better traffic flow.

A memorial with small gifts surrounded a utility pole with a photograph of Ariel Garcia at the corner of Alpine Drive and Vesper Drive ion Wednesday, April 10, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Death of Everett boy, 4, spurs questions over lack of Amber Alert

Local police and court authorities were reluctant to address some key questions, when asked by a Daily Herald reporter this week.

The new Amazon fulfillment center under construction along 172nd Street NE in Arlington, just south of Arlington Municipal Airport. (Chuck Taylor / The Herald) 20210708
Frito-Lay leases massive building at Marysville business park

The company will move next door to Tesla and occupy a 300,0000-square-foot building at the Marysville business park.

Everett police officers on the scene of a single-vehicle collision on Evergreen Way and Olivia Park Road Wednesday, July 5, 2023 in Everett, Washington. (Photo provided by Everett Police Department)
Everett man gets 3 years for driving high on fentanyl, killing passenger

In July, Hunter Gidney crashed into a traffic pole on Evergreen Way. A passenger, Drew Hallam, died at the scene.

FILE - Then-Rep. Dave Reichert, R-Wash., speaks on Nov. 6, 2018, at a Republican party election night gathering in Issaquah, Wash. Reichert filed campaign paperwork with the state Public Disclosure Commission on Friday, June 30, 2023, to run as a Republican candidate. (AP Photo/Ted S. Warren, File)
6 storylines to watch with Washington GOP convention this weekend

Purist or pragmatist? That may be the biggest question as Republicans decide who to endorse in the upcoming elections.

Keyshawn Whitehorse moves with the bull Tijuana Two-Step to stay on during PBR Everett at Angel of the Winds Arena on Wednesday, April 17, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
PBR bull riders kick up dirt in Everett Stampede headliner

Angel of the Winds Arena played host to the first night of the PBR’s two-day competition in Everett, part of a new weeklong event.

Simreet Dhaliwal speaks after winning during the 2024 Snohomish County Emerging Leaders Awards Presentation on Wednesday, April 17, 2024, in Everett, Washington. (Ryan Berry / The Herald)
Simreet Dhaliwal wins The Herald’s 2024 Emerging Leaders Award

Dhaliwal, an economic development and tourism specialist, was one of 12 finalists for the award celebrating young leaders in Snohomish County.

In this Jan. 12, 2018 photo, Ben Garrison, of Puyallup, Wash., wears his Kel-Tec RDB gun, and several magazines of ammunition, during a gun rights rally at the Capitol in Olympia, Wash. (AP Photo/Ted S. Warren)
With gun reform law in limbo, Edmonds rep is ‘confident’ it will prevail

Despite a two-hour legal period last week, the high-capacity ammunition magazine ban remains in place.

Everett Fire Department and Everett Police on scene of a multiple vehicle collision with injuries in the 1400 block of 41st Street. (Photo provided by Everett Fire Department)
1 in critical condition after crash with box truck, semi in Everett

Police closed 41st Street between Rucker and Colby avenues on Wednesday afternoon, right before rush hour.

The Arlington Public Schools Administration Building is pictured on Tuesday, April 16, 2024, in Arlington, Washington. (Ryan Berry / The Herald)
$2.5M deficit in Arlington schools could mean dozens of cut positions

The state funding model and inflation have led to Arlington’s money problems, school finance director Gina Zeutenhorst said Tuesday.

Lily Gladstone poses at the premiere of the Hulu miniseries "Under the Bridge" at the DGA Theatre, Monday, April 15, 2024, in Los Angeles. (AP Photo/Chris Pizzello)
Mountlake Terrace’s Lily Gladstone plays cop in Hulu’s ‘Under the Bridge’

The true-crime drama started streaming Wednesday. It’s Gladstone’s first part since her star turn in “Killers of the Flower Moon.”

Jesse L. Hartman (Photo provided by Everett Police Department)
Everett man who fled to Mexico given 22 years for fatal shooting

Jesse Hartman crashed into Wyatt Powell’s car and shot him to death. He fled but was arrested on the Mexican border.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.