Stealthy destroyer’s delivery to Navy delayed for more tests

  • By David Sharp Associated Press
  • Tuesday, March 10, 2015 1:08pm
  • Business

PORTLAND, Maine — Delays in installation, testing and activation of electrical systems will push back delivery of the largest destroyer ever built for the U.S. Navy from this summer to November, officials said Tuesday.

While the future USS Zumwalt is 94 percent complete, the complexity of the project requires more time for tests and activation aboard the 610-foot, electric-drive warship, said Cmdr. Thurraya Kent, a Navy spokeswoman.

The more than $3 billion warship, under construction at General Dynamics’ Bath Iron Works shipyard, will sport advanced automation to reduce crew size and a stealthy shape designed to minimize its visibility on enemy radar.

“General Dynamics Bath Iron Works and the other Navy contractors continue to work hard on test and activation of the lead ship, as well as construction on the two follow-on ships,” said shipyard spokesman Matt Wickenheiser. The shipyard deferred questions on schedule and cost to the Navy.

Delivery of the second warship in the class, the Michael A. Monsoor, will be delayed by a few months to November 2016, while the third and final ship remains on schedule for delivery in December 2018, the Navy said.

Such delays aren’t unusual on a first-in-class military system. And the General Accounting Office previously expressed concerns that the Navy was trying to incorporate too much new technology into the ship, which is the first electric-drive surface combatant built for the Navy since a line of destroyer escorts in the 1940s.

The Zumwalt utilizes a pair of turbines similar to units from the Boeing 777 to provide the muscle for two main generators, which along with two auxiliary units produce enough electricity to light up about 10,000 homes.

The warship features plenty of additional innovations beyond the stealthy shape and electric propulsion: A new gun with rocket-propelled projectiles; new radar and sonar systems; and a new hull shape.

Work on the electrical systems is part of the reason for the delay, Kent said. “The shipyard performance in electrical trade work is behind plan due to complexity of the … all-electric ship and the particular demand it has created for skilled electricians shipyard-wide,” she said Tuesday in a statement.

Jay Wadleigh, president of Machinists Local S-6, disagreed that there’s a shortage of skilled electricians, noting that electricians met their targets despite a projected shortfall of 40 electricians last winter.

Instead, the delays result from the complexity of the ship and design additions and alterations during construction, Wadleigh said. “The Navy would love to have it in the fleet, but they’d love to have it built correctly first. With as much as they’ve invested in it, I’m sure they want it right and not rushed,” he said.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Business

Everett
Red Robin to pay $600K for harassment at Everett location

A consent decree approved Friday settles sexual harassment and retaliation claims by four victims against the restaurant chain.

magniX employees and staff have moved into the company's new 40,000 square foot office on Seaway Boulevard on Monday, Jan. 18, 2020 in Everett, Washington. magniX consolidated all of its Australia and Redmond operations under one roof to be home to the global headquarters, engineering, manufacturing and testing of its electric propulsion systems.  (Andy Bronson / The Herald)
Harbour Air plans to buy 50 electric motors from Everett company magniX

One of the largest seaplane airlines in the world plans to retrofit its fleet with the Everett-built electric propulsion system.

Simreet Dhaliwal speaks after winning during the 2024 Snohomish County Emerging Leaders Awards Presentation on Wednesday, April 17, 2024, in Everett, Washington. (Ryan Berry / The Herald)
Simreet Dhaliwal wins The Herald’s 2024 Emerging Leaders Award

Dhaliwal, an economic development and tourism specialist, was one of 12 finalists for the award celebrating young leaders in Snohomish County.

Lynnwood
New Jersey company acquires Lynnwood Land Rover dealership

Land Rover Seattle, now Land Rover Lynnwood, has been purchased by Holman, a 100-year-old company.

Szabella Psaztor is an Emerging Leader. (Olivia Vanni / The Herald)
Szabella Pasztor: Change begins at a grassroots level

As development director at Farmer Frog, Pasztor supports social justice, equity and community empowerment.

Simreet Dhaliwal is an Emerging Leader. (Olivia Vanni / The Herald)
Simreet Dhaliwal: A deep-seated commitment to justice

The Snohomish County tourism and economic specialist is determined to steer change and make a meaningful impact.

Nathanael Engen, founder of Black Forest Mushrooms, an Everett gourmet mushroom growing operation is an Emerging Leader. (Olivia Vanni / The Herald)
Nathanael Engen: Growing and sharing gourmet mushrooms

More than just providing nutritious food, the owner of Black Forest Mushrooms aims to uplift and educate the community.

Owner and founder of Moe's Coffee in Arlington Kaitlyn Davis poses for a photo at the Everett Herald on March 22, 2024 in Everett, Washington. (Annie Barker / The Herald)
Kaitlyn Davis: Bringing economic vitality to Arlington

More than just coffee, Davis has created community gathering spaces where all can feel welcome.

Emerging Leader John Michael Graves. (Ryan Berry / The Herald)
John Michael Graves: Champion for diversity and inclusion

Graves leads training sessions on Israel, Jewish history and the Holocaust and identifying antisemitic hate crimes.

Gracelynn Shibayama, the events coordinator at the Edmonds Center for the Arts, is an Emerging Leader. (Olivia Vanni / The Herald)
Gracelynn Shibayama: Connecting people through the arts and culture

The Edmonds Center for the Arts coordinator strives to create a more connected and empathetic community.

Eric Jimenez, a supervisor at Cocoon House, is an Emerging Leader. (Olivia Vanni / The Herald)
Eric Jimenez: Team player and advocate for youth

As an advocate for the Latino community, sharing and preserving its traditions is central to Jimenez’ identity.

Molbak's Garden + Home in Woodinville, Washington closed on Jan. 28 2024. (Photo courtesy of Molbak's)
Molbak’s, former Woodinville garden store, hopes for a comeback

Molbak’s wants to create a “hub” for retailers and community groups at its former Woodinville store. But first it must raise $2.5 million.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.