‘Sno-Co squeeze’ commuters find ways to cope; relief in sight

MARYSVILLE — Friday was bad.

Monday was a doozy.

Tuesday was no breeze.

These are the dog days of the so-called “Snohomish County squeeze” as construction workers replace I-5 expansion joints between Everett and Marysville.

The maintenance project slowed traffic in previous weeks, but Friday afternoon devolved into a 12-mile backup and Monday and Tuesday reduced traffic to a 10-mile trickle.

Gridlock has spilled into alleys and side streets in north Everett for those zigzagging their way to I-5 or taking Highway 529 across the flats.

“Getting home is pretty miserable,” said Heidi Thoreson, a contract employee for pathology services at Providence Regional Medical Center Everett. “It’s taking at least twice as long to get home.”

On Tuesday, her commute to her home on the north end of the Tulalip Indian Reservation took one hour and six minutes.

“I listen to music and tell myself ‘I’m not going to get there any faster if I get upset,’ ” she said.

A couple of key factors are contributing to the snail’s pace.

The far right lane of I-5 leading off of Highway 529 northbound merges into traffic, and a sign tells drivers to yield to vehicles on I-5.

You also can blame Seattle — at least a bit.

Snohomish County is feeling a ripple from the closure of the Alaskan Way Viaduct in Seattle.

“The viaduct isn’t causing this, but it is shifting our traffic patterns,” said Lisa Van Cise, a state Department of Transportation spokeswoman.

Commuters are changing habits, including the times they leave work, hoping to beat the traffic crunch.

“We start to get a backup much earlier than before,” Van Cise said. “You have almost a trickle-down effect.”

Backups lasted until 9 p.m. Friday. By Tuesday, lanes were cleared by 7:45 p.m.

Some level of relief is in sight if the weather cooperates.

By the end of next week, after more re-striping, the merging mess from Highway 529 to I-5 should be improved.

The work on the northbound lanes is expected to be finished by June 16.

Road crews have been replacing 41 expansion joints over I-5 bridges between Everett and Marysville as part of a two-year, $5.3 million project. Weekend lane closures for southbound work already have taken place.

On weekdays, three narrower lanes are available with a 45 mph speed limit.

Most weekends are reserved for replacing the expansion joints, with jackhammers and other preparation work occurring behind concrete barriers during the week. On those weekends, only two narrower lanes are available. No closures are planned during Memorial Day weekend.

Expansion joints allow concrete sections of bridges to expand and contract as temperatures go up and down and traffic loads vary. As the joints deteriorate, they become safety hazards to drivers. They can bend, crack or collapse. The expansion joints being replaced range from 20 to 30 years old.

Tim Vaughan doesn’t get too worked up over the I-5 gridlock.

The Mount Vernon man, who spent much of his childhood in Lynnwood, commutes to his job south of Seattle during the week. He previously worked in downtown Seattle, a big reason for the 494,000 miles he put on a 1996 Toyota pickup truck.

He’s accustomed to slowdowns in north King County through Lynnwood and Everett.

“You just exercise patience,” he said. “You find some entertainment on the radio, stay off the cellphone and you’ll get through it.”

During the recent construction on the Steamboat Slough and Ebey Slough bridges, he has noticed the frustration among drivers not using turn signals and desperately looking for ways to weave through the congestion. Thoreson on Tuesday saw similar impatience on the streets leading onto Broadway in Everett.

Vaughan well remembers 2001. For longtime commuters, that was the summer of the snarl. Northbound Highway 529 was closed several weeks for construction.

“It was brutal,” he said.

On his way home Monday, he stopped in Everett to carpool with a friend. They left around 5:40 p.m. and pulled into Mount Vernon around 7:10 p.m. Tuesday he left a little earlier and the commute was a bit better, taking roughly 70 minutes from Everett.

The late arrival didn’t change dinner plans. He had pork chops and vegetables Monday and spaghetti Tuesday.

He said he accepts the slow commute for what it is: a necessary inconvenience for an important maintenance project that must be done.

Dealing with bottlenecks just makes him appreciate his destination all that much more.

“Getting home has been a delight, quite frankly, because you are home,” he said.

Eric Stevick: 425-339-3446; stevick@heraldnet.com.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Ariel Garcia, 4, was last seen Wednesday morning in an apartment in the 4800 block of Vesper Dr. (Photo provided by Everett Police)
How to donate to the family of Ariel Garcia

Everett police believe the boy’s mother, Janet Garcia, stabbed him repeatedly and left his body in Pierce County.

A ribbon is cut during the Orange Line kick off event at the Lynnwood Transit Center on Saturday, March 30, 2024 in Lynnwood, Washington. (Annie Barker / The Herald)
‘A huge year for transit’: Swift Orange Line begins in Lynnwood

Elected officials, community members celebrate Snohomish County’s newest bus rapid transit line.

Bethany Teed, a certified peer counselor with Sunrise Services and experienced hairstylist, cuts the hair of Eli LeFevre during a resource fair at the Carnegie Resource Center on Wednesday, March 6, 2024, in downtown Everett, Washington. (Ryan Berry / The Herald)
Carnegie center is a one-stop shop for housing, work, health — and hope

The resource center in downtown Everett connects people to more than 50 social service programs.

Everett mall renderings from Brixton Capital. (Photo provided by the City of Everett)
Topgolf at the Everett Mall? Mayor’s hint still unconfirmed

After Cassie Franklin’s annual address, rumors circled about what “top” entertainment tenant could be landing at Everett Mall.

Snohomish City Hall on Friday, April 12, 2024 in Snohomish, Washington. (Olivia Vanni / The Herald)
Snohomish may sell off old City Hall, water treatment plant, more

That’s because, as soon as 2027, Snohomish City Hall and the police and public works departments could move to a brand-new campus.

Lewis the cat weaves his way through a row of participants during Kitten Yoga at the Everett Animal Shelter on Saturday, April 13, 2024, in Everett, Washington. (Ryan Berry / The Herald)
Downward cat? At kitten yoga in Everett, it’s all paw-sitive vibes

It wasn’t a stretch for furry felines to distract participants. Some cats left with new families — including a reporter.

FILE - In this Friday, March 31, 2017, file photo, Boeing employees walk the new Boeing 787-10 Dreamliner down towards the delivery ramp area at the company's facility in South Carolina after conducting its first test flight at Charleston International Airport in North Charleston, S.C. Federal safety officials aren't ready to give back authority for approving new planes to Boeing when it comes to the large 787 jet, which Boeing calls the Dreamliner, Tuesday, Feb. 15, 2022. The plane has been plagued by production flaws for more than a year.(AP Photo/Mic Smith, File)
Boeing pushes back on Everett whistleblower’s allegations

Two Boeing engineering executives on Monday described in detail how panels are fitted together, particularly on the 787 Dreamliner.

Ferry workers wait for cars to start loading onto the M/V Kitsap on Friday, Dec. 1, 2023 in Mukilteo, Washington. (Olivia Vanni / The Herald)
Struggling state ferry system finds its way into WA governor’s race

Bob Ferguson backs new diesel ferries if it means getting boats sooner. Dave Reichert said he took the idea from Republicans.

Traffic camera footage shows a crash on northbound I-5 near Arlington that closed all lanes of the highway Monday afternoon. (Washington State Department of Transportation)
Woman dies almost 2 weeks after wrong-way I-5 crash near Arlington

On April 1, Jason Lee was driving south on northbound I-5 near the Stillaguamish River bridge when he crashed into a car. Sharon Heeringa later died.

Owner Fatou Dibba prepares food at the African Heritage Restaurant on Saturday, April 6, 2024 in Everett, Washington. (Annie Barker / The Herald)
Oxtail stew and fufu: Heritage African Restaurant in Everett dishes it up

“Most of the people who walk in through the door don’t know our food,” said Fatou Dibba, co-owner of the new restaurant at Hewitt and Broadway.

A pig and her piglets munch on some leftover food from the Darrington School District’s cafeteria at the Guerzan homestead on Friday, March 15, 2024, in Darrington, Washington. Eileen Guerzan, a special education teacher with the district, frequently brings home food scraps from the cafeteria to feed to her pigs, chickens and goats. (Ryan Berry / The Herald)
‘A slopportunity’: Darrington school calls in pigs to reduce food waste

Washingtonians waste over 1 million tons of food every year. Darrington found a win-win way to divert scraps from landfills.

Foamy brown water, emanating a smell similar to sewage, runs along the property line of Lisa Jansson’s home after spilling off from the DTG Enterprises property on Tuesday, March 5, 2024, in Snohomish, Washington. Jansson said the water in the small stream had been flowing clean and clear only a few weeks earlier. (Ryan Berry / The Herald)
Neighbors of Maltby recycling facility assert polluted runoff, noise

For years, the DTG facility has operated without proper permits. Residents feel a heavy burden as “watchdogs” holding the company accountable.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.