Boeing adds new manager as 787 production increases

The Boeing Co. is adding another manager to the 787 program as the company boosts Dreamliner production.

Boeing named Kim Pastega as vice president and deputy general manager of the 787 program. Pastega’s role is a new one and was announced in a message to employees sent Wednesday from Pat Shanahan, senior vice president of airplane programs, and Larry Loftis, vice president and general manager of the 787 program.

Pastega soon will transition from her current role as general manager of the 767 program in Everett to the Dreamliner program. Her replacement on the 767 has yet to be named.

Having recently delivered a 787 to Air India, the fifth airline to receive one, the program is entering a new phase, Shanahan and Loftis wrote.

“This next phase encompasses improving in-service reliability and increasing our production capacity. Now is a critical time to focus our efforts on stabilizing the airplane design and the global production system,” they wrote.

Boeing’s goal is to increase 787 production to a rate of 10 Dreamliners monthly by the end of 2013.

Pastega brings lean manufacturing experience to the 787 program. She has overseen the 767 as the program’s footprint in the Boeing factory has shrunk but at the same time increased in rate. Pastega also played a role as Boeing prepared the 767 line to be ready to build 767-based refueling tankers for the U.S. Air Force after winning a $35 billion contract.

Both Pastega and Loftis were managers on the 777 as production on that Everett-built jet became more efficient.

Pastega “will ensure the 787 deploys lean principles across the extended global supply chain, improves efficiency, and drives greater profitability,” Loftis and Shanahan wrote.

Earlier this year, Boeing shifted management on its 777 and 787 programs, moving Loftis to the Dreamliner and putting Scott Fancher as general manager of the 777 as the company ponders an upgrade on that aircraft.

More in Herald Business Journal

Tulalips break ground on new Quil Ceda Creek Casino Hotel

A 150-room hotel was added to what is now a $140 million complex expected to open in spring 2019.

For modern women, 98-year-old rejection letters still sting

In a stark new video, female Boeing engineers break the silence about past inopportunity.

Angel of the Winds pays $3.4M for Everett arena naming rights

The casino replaces Xfinity as the lead sponsor for the publicly owned downtown Everett events center.

Teddy, an English bulldog, models Zentek Clothing’s heat regulating dog jacket. (Ian Terry / The Herald)
Everett clothing company keeps your dog cool and stylish

Zentek uses space-age fabrics to moderate the temperature of pets and now humans.

Providence Hospital in Everett at sunset Monday night. Officials Providence St. Joseph Health Ascension Health reportedly are discussing a merger that would create a chain of hospitals, including Providence Regional Medical Center Everett, plus clinics and medical care centers in 26 states spanning both coasts. (Kevin Clark / The Daily Herald)
Merger would make Providence part of health care behemoth

Providence St. Joseph Health and Ascension Health are said to be talking. Swedish would also be affected.

Bombardier promotes its C Series airliner as American made

It says more than half its all-new jet is made in US factories with final assembly near Montreal.

Everett engineers learn lessons from Mexico City catastrophe

Structural scientists went to help after the September earthquake there and studied the damage.

Airports want to nearly double passengers’ user fees

Delta says airports will rake in $3.6 billion in passenger facility charge taxes this year.

UPS delays mount as online shopping hobbles courier’s network

FedEx completed 97.1 percent of its ground deliveries on time in the same period.

Most Read