Poland’s 787s grounded through October

WARSAW, Poland — Polish airline LOT said Thursday it is keeping its Boeing 787 Dreamliners grounded through October while the U.S. company tries to solve a potential safety threat. The late date suggests some airlines are growing skeptical about the plane’s chances of resuming flight soon.

The world’s total fleet of 50 787s has been grounded since Jan. 16 as Boeing and investigators try to figure out why one aircraft battery caught fire and another smoldered, forced an emergency landing. Each 787 has two lithium ion batteries.

Recent test flights performed in search of the root cause of battery ignition were carried out with no incidents.

LOT president Sebastian Mikosz said he could not schedule his airline’s two 787s for summer season flights as long as the cause of the technical problems has not been determined and the U.S. aviation authorities’ order to keep them grounded remains in force.

The decision is “the result of uncertainty,” said LOT spokesman Marek Klucinski said. “We want to carry our passengers in a foreseeable and safe way.”

The decision is a blow to Poland’s national carrier, which is cutting costs and planning mass layoffs in an effort to survive. LOT is Europe’s first airline to have Dreamliners, which it had hoped would improve its financial results and position.

It also shows carriers are preparing for their 787s to be grounded for an extended period of time.

Japan Airlines, which had one of its 787 suffer a battery fire while parked at Boston’s Logan International Airport last month, has said its fleet of six Dreamliners will remain idled through March. The other troubled 787, which was forced to make an emergency landing on Jan.16 in Japan due to a smoldering battery, belongs to All Nippon Airways, which is not flying its Dreamliners either.

In Europe, Norwegian Air Shuttle has been warned by Boeing of possible delays in the deliveries of its first 787 aircraft scheduled for April and June. Boeing also suspended delivery of three more 787s planned for LOT this year.

For Poland’s LOT, the grounding means it will need to extend a lease on three Boeings 767s it currently uses and lease another two for the summer season, Klucinski said. He added LOT is also talking to Boeing about the costs generated by the idling.

One of LOT’s Dreamliners remains in Chicago, the other in Warsaw. Both are safe to fly, Klucinski said.

The 787, dubbed the Dreamliner by Boeing, is the first airliner to make extensive use of lithium ion batteries, which are lighter weight, charge faster and contain more energy than conventional batteries similar in size.

More in Herald Business Journal

Snohomish inventor makes changing beds magical

Making your bed and lying in it just got a… Continue reading

Happy accident leads Edmonds couple to make Hunniwater drink

The latest line of energy drinks by Karin and Eric… Continue reading

Single payer is no panacea for our costly health care system

We must address the cost of health care before designing an insurance system.

Voters are on the sidelines as the port fills a vacant seat

Troy McClelland resigned from the Port of Everett commission too late for an election before 2019.

Career Fair planned next week at Tulalip Resort Casino

The Snohomish County Career Fair is planned from 10 a.m. to 2… Continue reading

American Farmland Trust president to speak in Mount Vernon

American Farmland Trust President John Piotti plans to give a talk about… Continue reading

In new setback, Uber to lose license to work in London

The company, beset by litany of scandals, was told it was not “fit and proper” to keep operating there.

Not home? Walmart wants to walk in and stock your fridge

The retailer is trying out the service with tech-savvy shoppers who have internet-connected locks.

Trade panel: Cheap imports hurt US solar industry

The ruling raises the possibility of tariffs that could double the price of solar panels.

Most Read