Prediction: even greater output at Boeing, Airbus

Airbus and the Boeing Co. have been boosting aircraft production, and Boeing has asked its supply chain to consider even higher rates for 737, 767 and 787 airliners than announced, said Scott Hamilton, an industry analyst with Leeham Co. in Issaquah.

“If some industry observers are concerned about the prospect of over-production now, the current state of affairs may be only the tip of the iceberg,” Hamilton wrote in a newsletter.

Besides Boeing and Airbus, Bombardier, Embraer, Mitsubishi and Russia’s Irkut all have new airplanes going into production.

China’s Comac has plans for a new C919, although those plans are less certain, Hamilton said.

The implications for the supply chain are obvious, he said. Many suppliers make parts for Airbus, Boeing, Bombardier and Embraer, and much of the work is on emerging programs.

Boeing has said it would boost production of its 737 single-aisle airliners in Renton from 38 a month to a record 42 per month next year. It’s increasing 787 Dreamliner production in Everett and North Charleston, S.C., to 10 per month. And Boeing CEO Jim McNerney has hinted on conference calls with analysts that the company is exploring raising rates again.

At the same time, Boeing is working to revamp the popular 737 with the 737 MAX. And Airbus is developing the A320 neo.

Eventually, suppliers will need capital to expand and hire more people to keep up, Hamilton said.

That’s good news and bad news.

“The rewards are enormous, but the risk could be enormous as well” if there is a geopolitical event, a terrorist attack or another economic downturn, he said.

That assessment may be a little alarmist, one supplier said.

Spirit AeroSystems of Wichita, which builds parts for all Boeing models, tells suppliers well in advance when there will be a production rate increase, said Jason Cox, Cox Machine’s chief technical officer.

That gives suppliers plenty of time to prepare.

“It’s not something that all of a sudden drops on you,” Cox said.

Most of the parts built at Cox Machine are for Boeing airplanes. Spirit AeroSystems is a major customer.

To keep up with rising production rates, Cox Machine expanded its factory space by 30,000 square feet. And it’s increased its work force by about 50 percent from the low end of the downturn, Jason Cox said.

During the downturn, Cox Machine employed 130. It now employs about 200.

If there are additional increases, “it should be in plenty of time for us to react,” Jason Cox said. “If there’s growth, it will be in specific areas in our shop. We will expand those areas if we need to.”

Spirit AeroSystems’ focus is on exploring higher, sustainable rates in cooperation with its customers, such as Boeing, said Spirit spokesman Ken Evans. “We do that almost on a daily basis.”

“We always work hand in hand with our customers and with our customers’ work statement,” Evans said.

To keep up with rising 737 rates, Spirit didn’t add buildings, but it did invest in more tooling and equipment and it reconfigured the factory.

If production rates increase further, “we would try to do whatever was necessary,” Evans said. That might require exploring the addition a larger building or a new facility.

The 787 is a younger program. Spirit added a building to take on the work, which can accommodate additional rate increases.

It also added an additional clean room and automated fiber placement machines.

When it comes to rate increases, it’s important that the rates are sustainable, Evans said.

“That’s what the supply chain needs,” he said.

Hamilton said he expects consolidation in the supply chain to continue.

Small and medium-size suppliers still have difficulty in the capital markets.

“If a key supplier is unable to raise the money to do the Cap X to expand, and there’s still a capital squeeze out there . merger to become larger may be the only way,” Hamilton said.

More in Herald Business Journal

Happy accident leads Edmonds couple to make Hunniwater drink

The latest line of energy drinks by Karin and Eric… Continue reading

Single payer is no panacea for our costly health care system

We must address the cost of health care before designing an insurance system.

Voters are on the sidelines as the port fills a vacant seat

Troy McClelland resigned from the Port of Everett commission too late for an election before 2019.

Career Fair planned next week at Tulalip Resort Casino

The Snohomish County Career Fair is planned from 10 a.m. to 2… Continue reading

American Farmland Trust president to speak in Mount Vernon

American Farmland Trust President John Piotti plans to give a talk about… Continue reading

In new setback, Uber to lose license to work in London

The company, beset by litany of scandals, was told it was not “fit and proper” to keep operating there.

Not home? Walmart wants to walk in and stock your fridge

The retailer is trying out the service with tech-savvy shoppers who have internet-connected locks.

Trade panel: Cheap imports hurt US solar industry

The ruling raises the possibility of tariffs that could double the price of solar panels.

Agent joins Re/Max in Smokey Point

Dennis Roland joined the Re/Max Elite Smokey Point office. The Navy veteran… Continue reading

Most Read