Headlines from Rosehill’s past

The burning of the original Rose Hill School and the construction of the existing building was chronicled in the pages of The Everett Daily Herald.

Below are headlines and summaries of the stories and briefs from March 1928, when the original building burned down, to September 1928, when the new school was finished.

March 19, 1928

New School to Rise at Mukilteo;

Blaze Razes Old Property

Rose Hill School made front-page news when it burned down on St. Patrick’s Day. A boy discovered the flames in the early evening and firefighters thought they were able to save part of the building. About an hour later, the flames kicked back up, destroying the remaining classrooms.

The building, a total loss, was insured by $40,000. Firefighters believed the fire was caused by a short circuit. Classes for the school’s 260 students were moved to churches and the Royal Neighbors Hall. District officials began talking about getting a new, fire-resistant building.

March 20, 1928

Securing Text Books For Mukilteo Pupils

Rose Hill School principal Erwin Black and Snohomish County Superintendant of Schools W.F. Martin went to Arlington and Pilchuck to get textbooks for students. District officials expected to begin planning for a new school as soon as insurance issues were settled.

March 24, 1928

Mukilteo Board Considers Plan For New School

The Mukilteo School Board approved plans to spend $65,000 for a two-story building with 10 rooms, a basement and a combination gym and auditorium. The building would be made largely from fire-resistant materials such as concrete. “We are planning a building that will meet the needs of the future,” Black and Martin said.

April 14, 1928

Architect’s Sketch Of What School Will Look Like

The newspaper printed architect Earl Morrison’s rendition of what the new Rose Hill would look like. The estimated cost of the building was $60,000, plus $20,000 for furnishings and equipment.

Sept. 13, 1928

Mukilteo District Will Dedicate Its New School Friday

The new school was finished and students were already using it when the Mukilteo School District planned a dedication ceremony at the building. Gov. Roland Hartley, who lived in Everett, was scheduled to speak at the ceremony.

Sept. 15, 1928

Handsome Mukilteo Grade Building is Dedicated Friday

More than 500 people attended the dedication of the new school.

More in Local News

A customer walks away after buying a hot dog from a vendor on 33rd St and Smith Street near the Everett Station on Friday. The Everett Station District Alliance pictures the area east of Broadway and south of Hewitt Avenue as a future neighborhood and transit hub that could absorb expected population growth. (Andy Bronson / The Herald)
How can Everett Station become a vibrant part of city?

A neighborhood alliance focused on long-term revitalization will update the public Tuesday.

Man arrested after police find van full of drugs, cash and guns

An officer on patrol noticed a vehicle by itself in the middle of a WinCo parking lot at 2 a.m.

After work to address issues, Lynnwood gets clean audit

The city has benefited from increased revenues from sales tax.

Bolshevik replaces BS in Eyman’s voters pamphlet statement

The initiative promoter also lost a bid to include a hyperlink to online coverage of the battle.

Man with shotgun confronts man on toilet about missing phone

Police say the victim was doing his business when the suspect barged in and threatened him.

Detectives seek suspect in woman’s homicide

Alisha Michelle Canales-McGuire was shot to death Wednesday at a home south of Paine Field.

Car crashes near Everett after State Patrol pursuit

The driver and a second person in the car suffered injuries.

Voter registration deadline looms

Oct. 30 is the deadline for new voter registrations prior to the General Election.

This week’s Herald Super Kid is Nathan Nicholson of Snohomish High School. (Dan Bates / The Herald)
One driven Panther

Snohomish senior Nathan Nicholson a student leader, social media master.

Most Read