Headlines from Rosehill’s past

The burning of the original Rose Hill School and the construction of the existing building was chronicled in the pages of The Everett Daily Herald.

Below are headlines and summaries of the stories and briefs from March 1928, when the original building burned down, to September 1928, when the new school was finished.

March 19, 1928

New School to Rise at Mukilteo;

Blaze Razes Old Property

Rose Hill School made front-page news when it burned down on St. Patrick’s Day. A boy discovered the flames in the early evening and firefighters thought they were able to save part of the building. About an hour later, the flames kicked back up, destroying the remaining classrooms.

The building, a total loss, was insured by $40,000. Firefighters believed the fire was caused by a short circuit. Classes for the school’s 260 students were moved to churches and the Royal Neighbors Hall. District officials began talking about getting a new, fire-resistant building.

March 20, 1928

Securing Text Books For Mukilteo Pupils

Rose Hill School principal Erwin Black and Snohomish County Superintendant of Schools W.F. Martin went to Arlington and Pilchuck to get textbooks for students. District officials expected to begin planning for a new school as soon as insurance issues were settled.

March 24, 1928

Mukilteo Board Considers Plan For New School

The Mukilteo School Board approved plans to spend $65,000 for a two-story building with 10 rooms, a basement and a combination gym and auditorium. The building would be made largely from fire-resistant materials such as concrete. “We are planning a building that will meet the needs of the future,” Black and Martin said.

April 14, 1928

Architect’s Sketch Of What School Will Look Like

The newspaper printed architect Earl Morrison’s rendition of what the new Rose Hill would look like. The estimated cost of the building was $60,000, plus $20,000 for furnishings and equipment.

Sept. 13, 1928

Mukilteo District Will Dedicate Its New School Friday

The new school was finished and students were already using it when the Mukilteo School District planned a dedication ceremony at the building. Gov. Roland Hartley, who lived in Everett, was scheduled to speak at the ceremony.

Sept. 15, 1928

Handsome Mukilteo Grade Building is Dedicated Friday

More than 500 people attended the dedication of the new school.

More in Local News

Food stuffs for a local chapter of A Simple Gesture at Fitness Evolution, the communal pick-up point, in Arlington on Jan. 12. (Kevin Clark / The Herald)
There’s an easier way to donate to food banks

Grab a green bag, fill it gradually with grocery items — and someone will pick it up from your home.

Lake Stevens man shot by deputies reportedly was suicidal

The fatal shooting is the latest incident where someone apparently wanted police to fire.

Man suspected of robbing Rite Aids

Mill Creek police released a sketch Monday evening of the suspect.

Suspect: Marysville church fire ignited by burning shoelaces

The 21-year-old told police it was an accident, but he’s under investigation for second-degree arson.

Police seek witnesses to Marysville hit-and-run

A Seattle man suffered broken bones in the accident.

Tracking device leads police to bank robbery suspect

The man walked into a Wells Fargo around 3:15 Tuesday and told the teller he had a bomb.

Mayor, others break ground on low-barrier housing in Everett

Somers: The complex is expected to save lives and “really shows the heart of this community.”

Volunteers conduct annual count of homeless population

They worked througha standard set of questions to learn why people have ended up where they are.

Former Everett councilman also sued his employer, the county

Ron Gipson says he suffered racial discrimination related to an investigation into sexual harassment.

Most Read