Headlines from Rosehill’s past

The burning of the original Rose Hill School and the construction of the existing building was chronicled in the pages of The Everett Daily Herald.

Below are headlines and summaries of the stories and briefs from March 1928, when the original building burned down, to September 1928, when the new school was finished.

March 19, 1928

New School to Rise at Mukilteo;

Blaze Razes Old Property

Rose Hill School made front-page news when it burned down on St. Patrick’s Day. A boy discovered the flames in the early evening and firefighters thought they were able to save part of the building. About an hour later, the flames kicked back up, destroying the remaining classrooms.

The building, a total loss, was insured by $40,000. Firefighters believed the fire was caused by a short circuit. Classes for the school’s 260 students were moved to churches and the Royal Neighbors Hall. District officials began talking about getting a new, fire-resistant building.

March 20, 1928

Securing Text Books For Mukilteo Pupils

Rose Hill School principal Erwin Black and Snohomish County Superintendant of Schools W.F. Martin went to Arlington and Pilchuck to get textbooks for students. District officials expected to begin planning for a new school as soon as insurance issues were settled.

March 24, 1928

Mukilteo Board Considers Plan For New School

The Mukilteo School Board approved plans to spend $65,000 for a two-story building with 10 rooms, a basement and a combination gym and auditorium. The building would be made largely from fire-resistant materials such as concrete. “We are planning a building that will meet the needs of the future,” Black and Martin said.

April 14, 1928

Architect’s Sketch Of What School Will Look Like

The newspaper printed architect Earl Morrison’s rendition of what the new Rose Hill would look like. The estimated cost of the building was $60,000, plus $20,000 for furnishings and equipment.

Sept. 13, 1928

Mukilteo District Will Dedicate Its New School Friday

The new school was finished and students were already using it when the Mukilteo School District planned a dedication ceremony at the building. Gov. Roland Hartley, who lived in Everett, was scheduled to speak at the ceremony.

Sept. 15, 1928

Handsome Mukilteo Grade Building is Dedicated Friday

More than 500 people attended the dedication of the new school.

More in Local News

Mom and brother turn in suspect in Stanwood robberies

The man is suspected of robbing the same gas station twice, and apologizing to the clerk afterward.

Nichols Brothers Boat Builders apprentice Janette Alhanati (left) and journeyman Kurt Warwick construct wall panels for an upcoming boat project with Linblad Expedition Holdings. A federal grant from the Northwest Workforce Council will allow Nichols Brothers to add more apprentices to its workforce starting in January 2018.
Whidbey Island boatbuilder gets hiring boost

The grant from the Northwest Workforce Council will help expand the company’s apprenticeship program.

Derrick “Wiz” Crawford, 22, is a suspect in the homicide of his roommate. (Edmonds Police Department)
Roommate suspected in Edmonds killing found hiding in closet

Police had been searching for him for 10 days before locating him at a house in Everett.

Young woman missing from Mukilteo found safe

She called her parents and told them she was at a museum in Seattle.

Camano Island man gets 18 years for role in drug ring

He was convicted of helping lead a drug distribution network in four Washington counties.

Lake Stevens man missing since beginning of January

Jason Michael Knox White hasn’t used his credit card or withdrawn money from his bank since then.

Navy to put filter in Coupeville’s contaminated water system

Chemicals from firefighting foam was found in the town’s drinking water.

Video shows man suspected of attacking a woman in Edmonds

The man allegedly threw her on the ground, then ran away after the she began kicking and screaming.

Everett district relents on eminent domain moving expenses

Homeowners near Bothell still must be out by April to make way for a planned new high school.

Most Read