Southbound Snohomish River bridge closed nights this week

Southbound Highway 529 at the Snohomish River Bridge is scheduled to be closed each night this week as crews do preparatory work for replacing the machinery that opens and closes the drawspan.

The bridge is scheduled to close at 8 p.m. each night through Thursday and to reopen at 4 a.m. each day Tuesday through Friday.

Detour signs will be placed in Marysville. Roads north of the bridge on the Snohomish River flats will remain open.

The $3.2 million replacement of the drawspan is scheduled for this summer.

More in Local News

Turkey talk: Kindergartners explain the Thanksgiving holiday

Our annual pilgrimage led us this year to Pathfinder Kindergarten Center in Everett.

Police locate suspect in Snohomish River after he fled

They used a thermal-imaging camera to locate the man in the water near Dagmars Marina.

Electrical fire on roof of Marysville school extinguished

There was no apparent structural damage to Cascade Elementary School.

As police closed in, 2 heavily armed pot-shop robbers fled

Cops surrounded the place in Mountlake Terrace. The suspects were tracked by dogs and apprehended nearby.

Hiker rescued on Boulder River trail after 15-foot fall

She was reported to have possible leg and rib fractures.

Alleged philanderer attacked with hammer near Everett

His girlfriend had accused him of cheating and allegedly called on another man to confront him.

Snohomish County Council passes a no-new-taxes budget

The spending plan still funds the hiring of five new sheriff’s deputies and a code enforcement officer.

In Sultan, there was a seat at the table for everyone

Every year, the town’s community dinner ensures no one has to dine alone on Thanksgiving.

Most Read