A Boeing Co. 777 airplane is shown on the assembly line in 2017 in Everett. (AP Photo/Ted S. Warren, file)

A Boeing Co. 777 airplane is shown on the assembly line in 2017 in Everett. (AP Photo/Ted S. Warren, file)

Boeing’s humans step in after robots fumble 777 jet assembly

There are no plans for any changes in staffing for the jetliners, which are manufactured in Everett.

By Julie Johnsson and Paul Shukovsky / Bloomberg

Score one for the humans. After four years of trial and error, Boeing is dumping one of its most ambitious forays into automation: the robots that build two main fuselage sections for its 777 jetliners and an upgraded version known as 777X.

Instead, the Chicago-based planemaker will rely on skilled mechanics to manually insert fasteners into holes drilled along the circumference of the airplane by an automated system known as “flex tracks,” which it has honed over years of use on the 787 Dreamliner.

The shift to the new human-plus-machine system began during the second quarter and should be complete by year’s end, Boeing spokesman Paul Bergman said in a statement. Boeing doesn’t plan any change in total staffing for its 777 jetliners, which are manufactured in Everett.

“The flex track solution has proven more reliable, requiring less work by hand and less rework, than what the robots were capable of,” he said.

As tempting as automation can be — with its promise of a mechanized workforce that never gets sick, tired or hungry — manufacturers are finding many cases where the technology can’t match the dexterity, creativity and precision of human hands and eyes. Tesla famously tried to build a fully automated car factory in Fremont, California, before adding a tent outside of the facility to allow more work to be done by hand.

Boeing’s fully automated initiative — known as FAUB, for fuselage automated upright build — relied on robots working in tandem to drill holes precisely and fasten together metal panels held upright to create the outer frame of the hulking twin-engine jets.

The technology was the handiwork of KUKA Systems, a company with deep automobile manufacturing roots. It was intended to replace the human mechanics who used handheld tools to insert 60,000 rivets into each plane. The robots were showcased as part of the advanced manufacturing that Boeing is pioneering on the 777X, and that it plans to expand to future jetliner programs next decade.

But the planemaker struggled to keep the robots moving in sync on the outside and inside of the fuselage panels, creating production snarls when it first introduced the FAUB technology to the legacy 777 line. A Seattle Times report from 2016 described a swell of worker overtime and incomplete jobs that were finished after jets rolled out of the factory.

“It was hard. It took years off my life,” Jason Clark, a Boeing vice president overseeing 777X production, said during an interview earlier this year.

The robot flub isn’t a complete loss. Boeing learned some valuable lessons from its “first very deep dive into that type of technology,” Clark said. “It’s taught us how to design for automation.”

The new method creates less wear-and-tear on workers since machines created by Electroimpact Inc. handle one of the the most physically demanding tasks of the fuselage assembly: drilling holes through metal.

Also, “We redesigned portions of the build to replace rivets with less difficult forms of fasteners, further improving the ergonomics,” Bergman said. The combination should bring improvements in safety, quality and factory flow, he said.

The 777X will be Boeing’s largest-ever jetliner, but the plane isn’t expected to take its first flight until next year after General Electric unearthed a durability issue with its GE9X engines. The company relies heavily on robots to manufacture the aircraft, from wings spun from resin-infused tape to self-guided vehicles used to transport large components within the factory.

Talk to us

More in Herald Business Journal

Members of Gravitics' team and U.S. Rep. Rick Larsen stand in front of a mockup of a space module interior on Thursday, August 17, 2023 at Gravitics' Marysville facility. Left to right: Mark Tiner, government affairs representative; Jiral Shah, business development; U.S. Rep. Rick Larsen; Mike DeRosa, marketing; Scott Macklin, lead engineer. (Gravitics.)
Marysville startup prepares for space — the financial frontier

Gravitics is building space station module prototypes to one day house space travelers and researchers.

Orca Mobility designer Mike Lowell, left, and CEO Bill Messing at their office on Wednesday, Aug. 16, 2023 in Granite Falls, Washington. (Olivia Vanni / The Herald)
Could a Granite Falls startup’s three-wheeler revolutionize delivery?

Orca Mobility’s battery-powered, three-wheel truck is built on a motorcycle frame. Now, they aim to make it self-driving.

Catherine Robinweiler leads the class during a lab session at Edmonds College on April 29, 2021. (Kevin Clark / The Herald)
Grant aids apprenticeship program in Mukilteo and elsewhere

A $5.6 million U.S. Department of Labor grant will boost apprenticeships for special education teachers and nurses.

Peoples Bank is placing piggy banks with $30 around Washington starting Aug. 1.
(Peoples Bank)
Peoples Bank grant program seeks proposals from nonprofits

Peoples Bank offers up to $35,000 in Impact Grants aimed at helping communities. Applications due Sept. 15.

Workers build the first all-electric commuter plane, the Eviation Alice, at Eviation's plant on Wednesday, Sept. 8, 2021 in Arlington, Washington.  (Andy Bronson / The Herald)
Arlington’s Eviation selects Seattle firm to configure production plane

TLG Aerospace chosen to configure Eviation Aircraft’s all-electric commuter plane for mass production.

Jim Simpson leans on Blue Ray III, one of his designs, in his shop on Friday, August 25, 2023, in Clinton, Washington. (Ryan Berry / The Herald)
Whidbey Island master mechanic building dream car from “Speed Racer”

Jim Simpson, 68, of Clinton, is using his knowledge of sports cars to assemble his own Mach Five.

Inside the new Boeing 737 simulator at Simulation Flight in Mukilteo, Washington on Wednesday, Sept. 20, 2023. (Annie Barker / The Herald)
New Boeing 737 simulator takes ‘flight’ in Mukilteo

Pilots can test their flying skills or up their game at Simulation Flight in Mukilteo.

An Amazon worker transfers and organizes items at the new PAE2 Amazon Fulfillment Center on Thursday, Sept. 14, 2023, in Arlington, Washington. (Ryan Berry / The Herald)
Amazon cuts ribbon on colossal $355M fulfillment center in Arlington

At 2.8 million square feet, the facility is the largest of its kind in Washington. It can hold 40 million “units” of inventory.

A computer rendering of the North Creek Commerce Center industrial park in development at 18712 Bothell-Everett Highway. (Kidder Mathews)
Developer breaks ground on new Bothell industrial park

The North Creek Commerce Center on Bothell Everett Highway will provide warehouse and office space in three buildings.

Dan Bates / The Herald
Funko president, Brian Mariotti is excited about the growth that has led his company to need a 62,000 square foot facility in Lynnwood.
Photo Taken: 102312
Former Funko CEO resigns from the Everett company

Brian Mariotti resigned Sept. 1, six weeks after announcing he was taking a six-month sabbatical from the company.

Cash is used for a purchase at Molly Moon's Ice Cream in Edmonds, Washington on Wednesday, Aug. 30, 2023. (Annie Barker / The Herald)
Paper or plastic? Snohomish County may require businesses to take cash

County Council member Nate Nehring proposed an ordinance to ban cashless sales under $200. He hopes cities will follow suit.

A crowd begins to form before a large reception for the opening of Fisherman Jack’s at the Port of Everett on Wednesday, August 30, 2023, in Everett, Washington. (Ryan Berry / The Herald)
Seafood with a view: Fisherman Jack’s opens at Port of Everett

“The port is booming!” The new restaurant is the first to open on “restaurant row” at the port’s Waterfront Place.