Broadway Bridge makeover to bring year-long traffic delays

EVERETT — A likely year-long detour around the Broadway Bridge project begins in mid-January, adding nearly a mile of driving for northbound vehicles and nearly a half-mile for southbound travelers.

The 102-year-old bridge over BNSF Railway tracks — the hump in Broadway just north of Hewitt Avenue — will be demolished, and a new, wider bridge with no weight restrictions will be built in its place. Last refurbished in 1931, the present bridge carries 40,000 vehicles per day.

Northbound traffic will be detoured east on Hewitt, north on Cedar Street, then west on Everett Avenue to rejoin Broadway. That’s about a mile longer than the 500 feet of Broadway it avoids.

Southbound Broadway traffic will have a shorter detour, turning east on California Avenue, south on Virginia Street and west on Hewitt, back to Broadway. That’s an additional half-mile of driving.

Burlington-based contractor Interwest Construction has been setting up signs and signals for the detour routes.

In mid-January, the bridge will be closed to traffic and be taken down. The city was unable to provide a more specific date.

It will take more than a year to build a new bridge with wider lanes and no weight restrictions, to open in January or February 2016.

The city has installed several Web cameras around the bridge area so people can monitor traffic conditions.

To view the cameras online, go to everettwa.org/default.aspx?ID=2080.

There are two existing cameras on Broadway that are part of the traffic signal system. A third camera near Cedar and Hewitt will be used to keep an eye on traffic on the detour route, said City Engineer Ryan Sass.

An additional camera, pointed at the bridge, will enable viewers to monitor construction.

The aging bridge spans the main line of the BNSF Railway, just east of the rail tunnel under the city.

In June, the city imposed an 11-ton weight limit on all vehicles as a precaution. The shoulder has long been closed to street parking.

The bridge is owned by the railroad, but when the new span is completed, ownership will be transferred to the city. This is typical for projects involving federal funding, Sass said.

The federal government is the source of about $7.6 million of the project’s $13.6 million price tag. BNSF contributed $824,000.

Chris Winters: 425-374-4165; cwinters@heraldnet.com. Twitter: @Chris_At_Herald.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Police Cmdr. Scott King answers questions about the Flock Safety license plate camera system on Thursday, June 5, 2025 in Mountlake Terrace, Washington. (Olivia Vanni / The Herald)
Mountlake Terrace approves Flock camera system after public pushback

The council approved the $54,000 license plate camera system agreement by a vote of 5-2.

Cascadia College Earth and Environmental Sciences Professor Midori Sakura looks in the surrounding trees for wildlife at the North Creek Wetlands on Wednesday, June 4, 2025 in Bothell, Washington. (Olivia Vanni / The Herald)
Cascadia College ecology students teach about the importance of wetlands

To wrap up the term, students took family and friends on a guided tour of the North Creek wetlands.

Community members gather for the dedication of the Oso Landslide Memorial following the ten-year remembrance of the slide on Friday, March 22, 2024, at the Oso Landslide Memorial in Oso, Washington. (Ryan Berry / The Herald)
The Daily Herald garners 6 awards from regional journalism competition

The awards recognize the best in journalism from media outlets across Alaska, Idaho, Montana, Oregon and Washington.

Edmonds Mayor Mike Rosen goes through an informational slideshow about the current budget situation in Edmonds during a roundtable event at the Edmonds Waterfront Center on Monday, April 7, 2025 in Edmonds, Washington. (Olivia Vanni / The Herald)
Edmonds mayor recommends $19M levy lid lift for November

The city’s biennial budget assumed a $6 million levy lid lift. The final levy amount is up to the City Council.

A firefighting helicopter carries a bucket of water from a nearby river to the Bolt Creek Fire on Saturday, Sep. 10, 2022, on U.S. 2 near Index, Washington. (Ryan Berry / The Herald)
How Snohomish County property owners can prepare for wildfire season

Clean your roofs, gutters and flammable material while completing a 5-foot-buffer around your house.

(City of Everett)
Everett’s possible new stadium has a possible price tag

City staff said a stadium could be built for $82 million, lower than previous estimates. Bonds and private investment would pay for most of it.

Jennifer Humelo, right, hugs Art Cass outside of Full Life Care Snohomish County on Wednesday, May 28, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
‘I’ll lose everything’: Snohomish County’s only adult day health center to close

Full Life Care in Everett, which supports adults with disabilities, will shut its doors July 19 due to state funding challenges.

Stolen car crashes into Everett Mexican restaurant

Contrary to social media rumors, unmarked police units had nothing to do with a raid by ICE agents.

Providence Regional Medical Center Everett. (Olivia Vanni/The Herald)
Providence Everett issues layoff notices to over 100 nursing assistants

The layoffs are part of a larger restructuring by Providence, affecting 600 positions across seven states, Providence announced Thursday.

Junelle Lewis, right, daughter Tamara Grigsby and son Jayden Hill sing “Lift Every Voice and Sing” during Monroe’s Juneteenth celebration on Saturday, June 18, 2022. (Olivia Vanni / The Herald)
Where to celebrate Juneteenth in Snohomish County this year

Celebrations last from Saturday to Thursday, and span Lynnwood, Edmonds, Monroe and Mountlake Terrace.

Logo for news use featuring the municipality of Lake Stevens in Snohomish County, Washington. 220118
Judge rules in favor of sewer district in Lake Stevens dispute

The city cannot assume the district earlier than agreed to in 2005, a Snohomish County Superior Court judge ruled Tuesday.

Herald staff photo by Michael O'Leary 070807
DREAMLINER - The first Boeing 787 is swarmed by the crowd attending the roll out of the plane in on July 8, 2007 at the Boeing assembly facility in Everett.
Plane in Air India crash tragedy was built in Everett

The Boeing 787 Dreamliner in the crash that killed more than 200 people was shipped from Everett to Air India in 2014.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.