Gulf rig fire leaves 4 hurt, 2 missing; no leak

VENICE, La. — An explosion and fire ripped through a Gulf oil platform Friday as workers used a cutting torch, sending four people to a hospital with burns and leaving two missing in waters off Louisiana.

Coast Guard Capt. Ed Cubanski told a news conference in New Orleans the well was not producing at the time and no oil was leaking. A small amount of oil spilled from the rig when workers using a torch cut into a 75-foot-long, 3-inch-wide line on the platform. Cubanski said a sheen one-half mile long and 200 yards wide was reported in the area.

“It’s not going to be an uncontrolled discharge from everything we’re getting right now,” Cubanski said.

The fire had since been extinguished, said Coast Guard spokesman Drake Fore. He said Coast Guard aircraft and boats were searching for two missing people. Nobody was believed killed in the fire.

Taslin Alfonzo, spokeswoman for West Jefferson Medical Center in suburban New Orleans, said four injured workers were brought to the hospital in critical condition with second- and third-degree burns over much of their bodies. Three arrived by helicopter at 9:55 a.m. and one by helicopter at 10:10 CST.

Two were sent by ambulance to the Baton Rouge Burn Center. Two others were to be sent later. She could not release identities or any other information.

The production platform owned by Black Elk Energy is about 25 miles southeast of Grand Isle, La. The Coast Guard said 26 people were aboard the platform at the time of the explosion.

The platform is for oil production from an established well, unlike the Deepwater Horizon rig, which was drilling an exploratory well for oil giant BP in mile-deep water when it blew up and triggered a massive oil spill in 2010. That site is well to the east of Friday’s explosion.

Cubanski said the platform appeared to be structurally sound. After the April 2010 explosion on the Deepwater Horizon, that rig burned for about 36 hours before suffering structural collapse and sinking to the Gulf floor.

The Black Elk platform is in 56 feet of water. Cubanski said 28 gallons of oil were in the broken line.

The Coast Guard got the call about the fire at 8:42 a.m. CST.

A federal official in Washington said a team of environmental enforcement inspectors was flying to the scene.

David Smith, a spokesman for the Interior Department’s Bureau of Safety and Environmental Enforcement, said the team was dispatched from a Gulf Coast base by helicopter soon after the Coast Guard was notified of the emergency. Smith said the team would scan for any evidence of oil spilling and investigate the cause of the explosion.

Black Elk is an independent oil and gas company headquartered in Houston, Texas.

The company’s website says it holds interests in properties in Texas and Louisiana waters, including 854 wells on 155 platforms.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Everett Historic Theater owner Curtis Shriner inside the theater on Tuesday, May 13, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Historic Everett Theatre sale on horizon, future uncertain

With expected new ownership, events for July and August will be canceled. The schedule for the fall and beyond is unclear.

Contributed photo from Snohomish County Public Works
Snohomish County Public Works contractor crews have begun their summer 2016 paving work on 13 miles of roadway, primarily in the Monroe and Stanwood areas. This photo is an example of paving work from a previous summer. A new layer of asphalt is put down over the old.
Snohomish County plans to resurface about 76 miles of roads this summer

EVERETT – As part of its annual road maintenance and preservation program,… Continue reading

City of Everett Engineer Tom Hood, left, and City of Everett Engineer and Project Manager Dan Enrico, right, talks about the current Edgewater Bridge demolition on Friday, May 9, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
How do you get rid of a bridge? Everett engineers can explain.

Workers began dismantling the old Edgewater Bridge on May 2. The process could take one to two months, city engineers said.

Smoke from the Bolt Creek fire silhouettes a mountain ridge and trees just outside of Index on Sept. 12, 2022. (Olivia Vanni / The Herald)
County will host two wildfire-preparedness meetings in May

Meetings will allow community members to learn wildfire mitigation strategies and connect with a variety of local and state agencies.

Helion's 6th fusion prototype, Trenta, on display on Tuesday, July 9, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Helion celebrates smoother path to fusion energy site approval

Helion CEO applauds legislation signed by Gov. Bob Ferguson expected to streamline site selection process.

Vehicles travel along Mukilteo Speedway on Sunday, April 21, 2024, in Mukilteo, Washington. (Ryan Berry / The Herald)
Mukilteo cameras go live to curb speeding on Speedway

Starting Friday, an automated traffic camera system will cover four blocks of Mukilteo Speedway. A 30-day warning period is in place.

Carli Brockman lets her daughter Carli, 2, help push her ballot into the ballot drop box on the Snohomish County Campus on Tuesday, Nov. 5, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Here’s who filed for the primary election in Snohomish County

Positions with three or more candidates will go to voters Aug. 5 to determine final contenders for the Nov. 4 general election.

Sound Transit approves contract to build Bothell bus facility

The 365,000-square-foot facility will be the heart of the agency’s new Stride bus rapid transit system, set to open in 2028.

One dead in Everett crash involving motorcycle and two vehicles

Police shut down the 10300 block of Evergreen Way in both directions during the multi-vehicle collision investigation.

Katie Wallace, left, checks people into the first flight from Paine Field to Honolulu on Friday, Nov. 17, 2023 in Everett, Washington. (Olivia Vanni / The Herald)
Executive order makes way for Paine Field expansion planning

Expansion would be a long-range project estimated to cost around $300 million.

A person pauses to look at an art piece during the Schack Art Center’s 50th anniversary celebration on Thursday, Oct. 10, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Everett to seek Creative District designation

The city hopes to grow jobs in the creative sector and access new grant funds through the state label.

Former Herald writer Melissa Slager’s new book was 14-year project

The 520-page historical novel “Contests of Strength” covers the 1700 earthquake and tsunami on Makah lands.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.