New I-5 ramps at Marysville wait for funding

Bob DeNeui of Marysville writes: Now that the new Ebey Slough bridge on Highway 529 is nearly complete, are there any plans to build another northbound exit off I-5 directly alongside Highway 529 to the new bridge?

Given the growth of Marysville and the number of train crossings, it only makes sense to ease congestion into the city by being able to directly reach roads east of the tracks. This would reduce the Fourth Avenue backups that go all the way back onto northbound I-5 at exit 199.

Bronlea Mishler, a spokeswoman for the state Department of Transportation, responds: Bob’s idea is one that the city of Marysville has considered for some time — and one that’s included in their long-range downtown plan. (Read details of the plan with this column online at www.HeraldNet.com/section/BLOG17.)

Adding a new ramp from northbound I-5 to Highway 529 would reduce the amount of traffic using the Fourth Street-Highway 528 intersection and help reduce congestion in the area. The next step toward planning a new ramp involves creating and submitting a report to the Federal Highway Administration for approval, with the city taking the lead. That being said, there’s currently no funding to complete the research or final report.

John Tatum, Marysville traffic engineer, adds: The location is currently a half-interchange, with an onramp from Highway 529 to northbound I-5 and an offramp from southbound I-5 to the highway. Completing the interchange would involve an onramp from the highway to southbound I-5 in as well as the offramp from northbound I-5.

Completion of these ramps is probably the only project that could alleviate traffic in downtown Marysville from an increase in trains carrying coal to an export terminal in Bellingham, if that plan is approved.

It is the only project that could get traffic from I-5 into south Marysville without crossing a train track. None of the current crossings can be separated from the tracks by an overpass, because of space constraints and other factors.

Michael Day of Monroe writes: I read the recent item about the patches on U.S. 2 between Snohomish and Monroe and agree that there is nothing wrong with them. Other than being ugly they do not affect my car or motorcycle in any way. I think what really needs to be addressed is the lack of lighting and lane markers on U.S. 2 and Highway 522.

On a dark, rainy or foggy evening with a line of cars coming at you it is very difficult to see the lane markings.

Mishler responds: Visibility is an important part of every highway — and lane markings and streetlights are two ways we improve visibility.

On U.S. 2 near Monroe, we repaint the lanes every year. So far, we have completed striping on U.S. 2 and Highway 522 for this year, and have replaced the reflective pavement markers as far east as Sultan. This maintenance is done in stages and we’ll finish our work later this season.

Maintenance crews are working on three street lights at the Highway 522-U.S. 2 interchange and will turn them on in a few weeks.

We use specially designed paint for lane striping; the paint has glass beads mixed in to produce the reflective effect. Some reflectivity from these beads will be lost any time it rains. This is unavoidable. Since we live in a state where rain is almost a daily expectation, drivers must be aware of how rain can affect road conditions and visibility. We remind drivers to adjust speed and behaviors accordingly.

E-mail us at stsmarts@heraldnet.com. Please include your city of residence.

Look for updates on our Street Smarts blog at www.heraldnet.com/streetsmarts.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Bothell
Bothell man charged with the murder of his wife after Shoreline shooting

On Tuesday, the 43-year-old pleaded not guilty in King County Superior Court.

Five Snohomish County men named in drug and gun trafficking indictments

On Tuesday, federal and local law enforcement arrested 10 individuals in connection with three interrelated drug and gun trafficking conspiracies.

Snohomish County Sheriff Susanna Johnson speaks at a press conference outside of the new Snohomish County 911 building on Wednesday, April 30, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
County sheriff working to fix $15M in overspending

In a presentation to the County Council, Sheriff Johnson said she’s reducing overtime hours and working to boost revenue with a new 0.1% sales tax.

A Sound Transit bus at it's new stop in the shadow of the newly opened Northgate Lightrail Station in Seattle. (Kevin Clark / The Herald)
Sound Transit may add overnight bus service between Everett, Seattle

The regional transit agency is seeking feedback on the proposed service changes, set to go into effect in fall 2026.

The Edmonds School District building on Friday, Feb. 14, 2025 in Lynnwood, Washington. (Olivia Vanni / The Herald)
Mother sues Edmonds School District after her son’s fingertip was allegedly severed

The complaint alleges the boy’s special education teacher at Cedar Way Elementary closed the door on his finger in 2023.

Pedal-free electric bikes are considered motorcycles under Washington State law (Black Press Media file photo)
Stanwood Police: Pedal-free e-bikes are motorcycles

Unlike electric-assisted bikes, they need to be registered and operated by a properly endorsed driver.

The aftermath of a vandalism incident to the Irwin family's "skeleton army" display outside their Everett, Washington home. (Paul Irwin)
Despite vandalism spree, Everett light display owners vow to press on

Four attacks since September have taken a toll on Everett family’s Halloween and Christmas cheer.

Students, teachers, parents and first responders mill about during a pancake breakfast at Lowell Elementary School in 2023 in Everett. If approved, a proposed bond would pay for a complete replacement of Lowell Elementary as well as several other projects across the district. (Ryan Berry / The Herald)
Everett school board sends bond, levy measures to Feb. ballot

The $400 million bond would pay for a new school and building upgrades, while the levy would pay for locally funded expenses like extra-curriculars and athletics.

Edgewater Bridge construction workers talk as demolition continues on the bridge on Friday, May 9, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Edgewater Bridge construction may impact parking on Everett street

As construction crews bring in large concrete beams necessary for construction, trucks could impact parking and slow traffic along Glenwood Avenue.

Customers walk in and out of Fred Meyer along Evergreen Way on Monday, Oct. 31, 2022 in Everett, Washington. (Olivia Vanni / The Herald)
Closure of Fred Meyer leads Everett to consider solutions for vacant retail properties

One proposal would penalize landlords who don’t rent to new tenants after a store closes.

People leave notes on farmers market concept photos during an informational open house held at the Northwest Stream Center on Oct. 9, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Snohomish County presents plans for Food and Farming Center

The future center will reside in McCollum Park and provide instrumental resources for local farmers to process, package and sell products.

People walk through Explorer Middle School’s new gymnasium during an open house on Oct. 7, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Everett middle school celebrates opening of new gym

The celebration came as the Mukilteo School District seeks the approval of another bond measure to finish rebuilding Explorer Middle School.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.