How to read your road report: Road restrictions may be near, but not necessarily in, the cities under which they are listed. Most restrictions are from 7 a.m. to 6 p.m. weekdays. Any lane on the road could be closed between the two cross streets found in most listings. Weather conditions may change work plans.
Freeway work through Everett
Multiple lanes of I-5 may be closed Monday through Thursday nights and some Friday nights. Closures will be in both directions in various areas between Highway 526 (the Boeing Freeway) and Marine View Drive. Southbound closures begin at 7 p.m. and end between 4 and 6 a.m. Northbound closures begin between 7 and 10 p.m. and end at 6 a.m. Friday night closures end at 8 a.m. Saturdays.
On dry nights this week, I-5 and U.S. 2 onramps and offramps may be closed in Everett. Paving and striping continue. Watch for traffic signs.
I-5 overpass work continues between Highway 526 and Marine View Drive in Everett. Everett streets that could have extra congestion because of the work include the 41st Street overpass for Broadway, Everett Avenue, Hewitt and Lowell Road-52nd Street. Street closures could cause ramp and city street backups.
New or updated roadwork
For information on emergency county road closures and maintenance projects, call Snohomish County road maintenance at 360-862-7500 or go to www.snoco.org and use the keyword search.
Bothell
Barker and Atlas Roads east of Atlas Road and south of Barker. Lane closure through Sept. 1. Utility installation.
Cathcart
Broadway Avenue between 192nd Street SE and 196th Street SE. Lane closure through Friday. Gas service installation.
Lynnwood
Manor Way at 153rd Street SW. Lane closure through Friday. Underground utility installation.
Marysville
Smokey Point Boulevard and State Avenue north of 106th Place NE. Lane closure through Friday. Gas service installation.
Stanwood
76th Avenue NW on the 30900 block. Lane closure through Wednesday. Frontage improvements.
Snohomish
Home Acres Road north of 60th Street SE. Lane closure through Sept. 5. Transmission line rebuilding project.
S. Machias Road, south of the Old Machias Road. Full road closure through Sept. 12. Installation of a fish passage culvert.
Ongoing roadwork
Arlington
Jim Creek Road between Ebey Mountain Road and Lake Riley Road. Lane closure through Aug. 22. Culvert replacement.
Bothell
202nd Street SE and 11th Drive SE. Lane closure through Aug. 29. Drainage improvement project.
Darrington
Crawford Loop Road, 31700 block to the 32700 block. Lane closure through Friday. Power pole replacement.
Everett
120th Place SE east of 35th Avenue SE. Lane closure through Aug. 22. Utility installation and frontage improvements.
E. Gibson Road north of 122nd Place SW. Lane closure through Aug. 22. Utility installation.
104th Place SE, 3600 and 3800 block and 105th Place SE. Lane closures through Aug. 29. Underground cable replacement.
Gold Bar
419th Avenue SE at May Creek Bridge No. 572. Lane closure through Sept. 30. Bridge repair.
Reiter Road at milepost 3.3 east of May Creek Road. Full road closure through Friday.
Lake Stevens
79th Avenue SE at Eighth Street SE. Lane closure through Aug. 31. Water and sewer line installation.
Lynnwood
Beverly Park Road from 148th Street SW to Picnic Point Road. Lane closure through Sept. 2. Relocation of sewer and water mains.
Beverly Park Road between 52nd Avenue W. and Picnic Point Road. Full road closure through Sept. 3. Snohomish County road improvement project.
Marysville
122nd Place NE and 51st Avenue NE. Full road closure through Sept. 2. Intersection improvements.
Mill Creek
192nd Street SE west of Bothell-Everett Highway. Lane closure through Aug. 29. Frontage work.
164th Street SE west of Third Avenue SE. Lane closure through Aug. 29. Telecommunications installation.
Monroe
High Bridge Road east of Crescent Bridge. Intermittent lane closures through Aug. 29. Culvert replacement.
Woods Creek Road between Wagner and Yeager Roads. Road closure through Friday. Shoulder repair.
Silver Lake
Silver Lake Road south of Andrew Sater Road. Lane closure through Aug. 29. Sewer installation and frontage improvements.
Snohomish
South Lake Roesiger and Monroe Camp Grounds. Lane closure through Aug. 29.
Fales Road between Downes Road and Elliot Road. Road closure through Sept. 5. Fish passage culvert replacement.
Tulalip
Tulare Way west of View Place. Lane closed through Oct. 31. Road repair.
Talk to us
> Give us your news tips.
> Send us a letter to the editor.
> More Herald contact information.
