How to read your road report: Road restrictions may be near, but not necessarily in, the cities under which they are listed. Most restrictions are from 7 a.m. to 6 p.m. weekdays. Any lane on the road could be closed between the two cross streets found in most listings. Weather conditions may change work plans.
Freeway work through Everett
Multiple lanes of I-5 may be closed Monday through Thursday nights and some Friday nights. Closures will be in both directions in various areas between Highway 526 (the Boeing Freeway) and Marine View Drive. Southbound closures begin at 7 p.m. and end between 4 and 6 a.m. Northbound closures begin between 7 and 10 p.m. and end at 6 a.m. Friday night closures end at 8 a.m. Saturdays.
On dry nights this week, I-5 and U.S. 2 onramps and offramps may be closed in Everett. Paving, barrier and drainage work, sign installation, electrical work and striping continues. Watch for traffic signs.
I-5 overpass work continues between Highway 526 (the Boeing Freeway) and Marine View Drive in Everett. The state will close lanes and reroute drivers onto several downtown Everett streets, including Pacific and Hewitt avenues and Lowell Road-52nd Street. Street closures could cause ramp and city street backups.
New or updated roadwork
For information on emergency county road closures and maintenance projects, call SnohoÂmish County road maintenance at 360-862-7500 or go to www.snoco.org and use the keyword search.
Bothell
228th Street SE between 35th Avenue SE. Lane closure through June 20. Fiber optic aerial cabling.
Monroe
Echo Lake Road at the 22900 block. Lane closure through July 4. Pipe repair.
High Bridge Road east of Crescent Bridge. Lane closure through Aug. 29. Culvert replacement.
Snohomish
Elliott Road at the intersection of Elliott Road and 102nd Avenue SE. Lane closure through July 10. Emergency repair.
Ongoing roadwork
Bothell
212th Street SE and 42nd Avenue SE. Lane closures through July 3. Sewer line extension.
Lake Stevens
S. Davies Road between 10th Place SE and 12th Place SE. Lane closure through June 20. Gas service installation.
Lynnwood
20th Place W. between Jefferson Way and S. Lake Stickney Drive. Lane closure through June 25. Water line installation and frontage improvements.
Beverly Park Road between Picnic Point Road and 148th Street SW. Lane closure through June 27. PUD will relocate overhead facilities.
Beverly Park Road from 148th Street SW to Picnic Point Road. Lane closure through Sept. 2. Relocation of sewer main.
Marysville
122nd Place NE and 51st Avenue NE. Full road closure through Sept. 2. Intersection improvements.
Snohomish
60th Street SE between 70th Drive SE and 83rd Avenue SE. Full road closure through July 2. Road subgrade repair.
Tulalip
Tulare Way west of View Place. Lane closure through Oct. 31. Road subgrade repair.
Talk to us
> Give us your news tips.
> Send us a letter to the editor.
> More Herald contact information.