SEATTLE — Bertha’s bed is ready.
Seattle Tunnel Partners finished building a pit — 80 feet deep and 400 feet long — that will serve as the launch pad for a huge boring machine called Bertha.
The Seattle Daily Journal of Commerce reported the 7,000-ton machine that arrived in pieces aboard a ship from Japan is being reassembled in the pit.
Drilling on a two-mile Highway 99 tunnel under downtown Seattle starts this summer. The tunnel is expected to open in 2015, allowing the removal of the Alaskan Way Viaduct.
———
Information from: Seattle Daily Journal of Commerce, www.djc.com/
Talk to us
- You can tell us about news and ask us about our journalism by emailing newstips@heraldnet.com or by calling 425-339-3428.
- If you have an opinion you wish to share for publication, send a letter to the editor to letters@heraldnet.com or by regular mail to The Daily Herald, Letters, P.O. Box 930, Everett, WA 98206.
- More contact information is here.