How to read your road report: Road restrictions may be near, but not necessarily in, the cities under which they are listed. Most restrictions are from 7 a.m. to 6 p.m. weekdays. Any lane on the road could be closed between the two cross streets found in most listings. Weather conditions may change work plans.
Freeway work through Everett
Multiple lanes of I-5 may be closed Monday through Thursday nights and some Friday nights. Closures will be in both directions in various areas between Highway 526 (the Boeing Freeway) and Marine View Drive. Southbound closures begin at 7 p.m. and end between 4 and 6 a.m. Northbound closures begin between 7 and 10 p.m. and end at 6 a.m. Friday night closures end at 8 a.m. Saturdays.
On dry nights this week, I-5 and U.S. 2 onramps and offramps may be closed in Everett. Paving and striping continue. Watch for traffic signs.
I-5 overpass work continues between Highway 526 and Marine View Drive in Everett. Everett streets that could have extra congestion because of the work include the 41st Street overpass for Broadway, Everett Avenue, Hewitt and Lowell Road-52nd Street. Street closures could cause ramp and city street backups.
New or updated roadwork
For information on emergency county road closures and maintenance projects, call Snohomish County road maintenance at 360-862-7500 or go to www.snoco.org and use the keyword search.
Bothell
196th Street SE between 24th Drive and its intersection with 13th Drive SE. Lane closure through Oct. 14. Sewer and water main installation.
Cathcart
Broadway Avenue between 180th Street SE and 188th Street SE. Lane closure through Friday.
Everett
Beverly Park Road northeast of Gibson Road. Lane closure through Friday. Waterline installation.
Lake Stevens
79th Avenue SE at Eighth Street SE and Vernon Road. Lane closure through Oct. 10. Water and sewer line installation.
Snohomish
66th Avenue SE and Skipley Road intersection. Lane closure through Oct. 17. Transmission line project.
Stanwood
36th Avenue NW and 220th Street NW. Lane closure through Sept. 29. Power pole replacement.
Ongoing roadwork
Arlington
Rivershore Road in the 5000 block of Rivershore Road. Full road closure through Sept. 29.
Bothell
Locust Way from 228th to Lockwood Road. Lane closure through Friday. Aerial cable installation.
Everett
Fourth Drive SE south of 128th Street SE. Lane closure through Wednesday. Water main relocation and sewer extension.
55th Avenue SE north of 134th Street SE. Lane closure through Wednesday. Underground cable replacement.
35th Avenue SE and Seattle Hill Road. Lane closure through Oct. 3. Sewer installation, utility and frontage improvements.
148th Street SE west of Highway 99. Lane closure through Oct. 2. Utility installation and frontage improvements.
Gold Bar
419th Avenue SE at May Creek Bridge No. 572. Lane closure through Sept. 30. Bridge repair.
Lake Goodwin
Rose Road and 40th Avenue NW. Lane closure through Oct. 3. Frontage improvements.
Lake Stevens
S. Lake Stevens Road between Purple Pennant Road to Machias Cut-off Road. Lane closure through Oct. 3. Utility installation.
99th Avenue SE south of 20th Street SE. Full road closure through Dec. 31. Alleviating a sight distance issue.
Lynnwood
28th Avenue W. between 198th Place SW and Alderwood Mall Parkway. Lane closure through Friday. Paving and lane striping.
212th Street SW between 44th Avenue W. and Poplar Way. Lane closure through Friday. Paving and lane striping.
Alder Way between Ash Way and 172nd Street SW. Full road closure through Oct. 22. Sewer installation.
13th Avenue W. between 167th Place SW and 172nd Street SW. Lane closure through Oct. 10. Frontage improvements.
Marysville
51st Avenue SE between 121st Street NE and 123rd Street NE. Full road closure through Friday. Culvert restoration.
Mill Creek
180th Street SE eastbound off Highway 527. Lane closure through Oct. 3. Frontage improvements.
180th Street SE and 35th Avenue SE. Lane closure through Sept. 30.
2nd Avenue W. Full road closure through Feb. 15. Storage use.
Monroe
Tualco Road, Tualco Loop Road, and 203rd Street SE. Lane closure through Oct. 10. Dairy waste digester influent pipeline installation.
Snohomish
Newberg Road, 17300 block. Full road closure through Oct. 3. Culvert replacement.
Tulalip
Tulare Way west of View Place. Lane closed through Oct. 31.