New Boeing delivery center opens at Paine Field

EVERETT — A Chinese lion dance, the beat of African drums, a 747-8 cargo jet and a 787 passenger plane all helped set the scene for a the grand opening Wednesday of the Boeing Co.’s aircraft delivery center.

“Isn’t she a beauty?” said Pat Shanahan, vice president of airplane programs for Boeing Commercial Airplanes, pointing at the three-story building shining in the sun.

The 180,000-square-foot facility was built to help Boeing keep pace with jet deliveries over the coming years as the company increases airplane production.

The old delivery center was built in the late 1960s as Boeing was readying the first 747 jumbo jet. Updated in 2006, the center was the site of 3,600 Boeing widebody jet deliveries to customers all over the world.

The new center, which will accommodate about 600 workers, can deliver three aircraft simultaneously and has jet bridges like those at commercial airports. The sculpted, silvery-gray exterior also includes 27,098 square feet of glass.

“Last year we delivered a record 183 airplanes and this new facility will help us continue to increase deliveries,” said Tom Maxwell, vice president of the Boeing’s Everett Delivery Center.

When Boeing broke ground on the new delivery center in March 2012, Jeff Klemann, who was then the vice president of the delivery center, called the new facility a “symbol of Boeing’s long-term commitment to the Pacific Northwest.”

Boeing’s future in Washington was on the mind of Gov. Jay Inslee when he spoke at the grand opening event Wednesday.

“We know we’re going to be in a competition to make sure the 777X is delivered through these doors and nowhere else,” Inslee said.

Boeing officials are expected to ask the company’s board this month for permission to offer an updated 777 to customers. Inslee vowed to push transportation and workforce training initiatives through the Legislature, which could convince Boeing to build the 777X in Everett.

The company’s commitment to the region has been in question since Boeing moved the corporate headquarters to Chicago in 2001. The decision in 2009 to add a 787 final-assembly line in South Carolina, rather than Everett, fueled concerns about the company’s loyalty to the Puget Sound area.

Over the past year, Boeing has made overtures of willingness to stay here. Construction is under way across the runway for an operations center for Boeing’s fleet of modified 747s, called Dreamlifters, which ferry 787 parts around the world.

Earlier this year, Boeing also finalized a deal to buy a Paine Field hangar, which it previously leased from Aviation Technical Services. Known as the Everett Modification Center, the facility is where Boeing employees have been reworking and altering some of the company’s earliest-built 787s.

Even as Boeing adds to the Paine Field campus, it’s also growing the North Charleston, S.C., site. A delivery center opened there in 2011. Boeing announced in February it also will establish a Dreamlifter operations center in North Charleston. The company also agreed to buy more land around the South Carolina site.

Although Boeing’s Shanahan didn’t commit the 777X to Everett, he said the company wouldn’t build a new facility like the delivery center if it weren’t committed to “being here for a while.”

Boeing anticipates delivering 200 twin-aisle jets this year. That includes deliveries of the company’s grounded 787, which Shanahan hopes will be returned to commercial flight “sooner rather than later.”

The Dreamliner was grounded Jan. 16 after problems with the jet’s lithium-ion batteries. Boeing has redesigned the battery and has conducted tests on 787s with the new battery. Flights of the 787 on Monday and Wednesday, however, were not part of the company’s effort to get the FAA to sign off on the redesigned battery. That flight will come within days, the company said.

Michelle Dunlop: 425-339-3454; mdunlop@heraldnet.com.

Delivery center by the numbers

•1,894,800 pounds of steel.

588,897 hours of labor.

180,000 square feet.

27,098 square feet of exterior glass.

11,087 cubic yards of concrete.

250 guests can be accommodated in event area.

4 rooms for signing delivery contracts.

3 aircraft can be delivered simultaneously.

Source: Boeing Co.

Talk to us

More in Herald Business Journal

Barre3 owner Gina Drake leads an exercise class in the Red Barn at 5th Ave S and Maple Street on Wednesday, Jan. 13, 2020 in Edmonds, Washington.  (Andy Bronson / The Herald)
Barre3 teaches a fitness trifecta for balance during COVID-19

The full-body workouts combine strength conditioning, cardio and mindfulness to help you feel balanced.

An access road leads into plot of land located in north Darrington that could potentially be used to build a 30-acre Wood Innovation Center, which will house CLT manufacturing and modular building companies on Tuesday, Jan. 12, 2021 in Darrington, Wa. (Olivia Vanni / The Herald)
$6 million grant is green light for Darrington timber center

The Darrington Wood Innovation Center is set to become a reality — bringing roughly 150 jobs with it.

Boeing 777 makes emergency landing in Moscow

The plane landed safely and no one was injured.

Boeing’s decorated 787 Dreamliner on display at a celebration for the Boeing Employees Community Fund last year at the Boeing Future of Flight Aviation Center in Mukilteo. (Janice Podsada / Herald file)
Boeing’s deepening 787 inspections risk longer delays

The company will use freed-up space in Everett to inspect and repair the plane’s tiny imperfections.

FILE- In this Oct. 19, 2015, file photo, an airplane flies over a sign at Boeing's newly expanded 737 delivery center at Boeing Field in Seattle. Federal regulators have imposed $5.4 million in civil penalties against Boeing on Thursday, Feb. 25, 2021, for violating terms of a $12 million settlement in 2015, and the aircraft maker has agreed to pay another $1.21 million to settle two current enforcement cases. (AP Photo/Ted S. Warren, File)
Boeing will pay $6.6 million to settle FAA allegations

The company failed to put adequate priority on complying with regulations.

FILE - In this Wednesday, Dec. 11, 2019, file photo, a United Airlines Boeing 737 Max airplane takes off in the rain, at Renton Municipal Airport in Renton, Wash. Federal auditors are issuing fresh criticism of the government agency that approved the Boeing 737 Max. The Transportation Department's inspector general said Wednesday, Feb. 24, 2021, that the Federal Aviation Administration must improve its process for certifying new planes.  (AP Photo/Ted S. Warren, File)
Federal watchdog blasts FAA over certification of Boeing jet

It will take five years to finish making the Transportation Department’s 14 recommended changes.

Hamburger cheese with beef, salad, tomato and ham isolated on white background.
You voted: The best hamburger in Snohomish County

Even during a pandemic, people still have their favorites.

In this image taken from video, the engine of United Airlines Flight 328 is on fire after after experiencing "a right-engine failure" shortly after takeoff from Denver International Airport, Saturday, Feb. 20, 2021, in Denver, Colo. The Boeing 777 landed safely and none of the passengers or crew onboard were hurt. (Chad Schnell via AP)
Metal fatigue seen as trigger for Boeing 777 engine failure

A preliminary investigation suggested a crack that grew gradually over time prompted the failure.

Boeing 757 flying to Seattle makes emergency landing

The 16-year-old jetliner was powered by Pratt & Whitney engines.

This Saturday, Feb. 20, 2021 photo provided by Hayden Smith shows United Airlines Flight 328 approaching Denver International Airport, after experiencing "a right-engine failure" shortly after takeoff from Denver. Federal regulators are investigating what caused a catastrophic engine failure on the plane that rained debris on Denver suburbs as the aircraft made an emergency landing. Authorities said nobody aboard or on the ground was hurt despite large pieces of the engine casing that narrowly missed homes below. (Hayden Smith via AP)
Boeing: 777s with engine that blew apart should be grounded

Video showed the engine fully engulfed in flames as the plane flew through the air.

A portion of the site of the proposed Lake Stevens Costco at the intersection of Highway 9 (right) and South Lake Stevens Road (below, out of view). (Chuck Taylor / Herald file)
Legal battle stalls Costco’s planned store in Lake Stevens

“We intend to keep them in court until they get tired of us and go away,” an opponent of the project said.

FILE - In this Jan. 25, 2020, file photo a Boeing 777X airplane takes off on its first flight with the Olympic Mountains in the background at Paine Field in Everett, Wash. Boeing is reporting another huge loss, this one because of a setback to its 777X widebody jetliner. Boeing said Wednesday, Jan. 27, 2021, it lost $8.4 billion in the fourth quarter on weaker demand for planes during the pandemic. (AP Photo/Ted S. Warren, File)
Boeing says 2 directors are leaving as board faces scrutiny

Arthur Collins Jr. and Susan Schwab won’t stand for reelection at the shareholder meeting in April.