Road Report
Published 7:25 pm Sunday, July 11, 2010
Road restrictions may be near, but not in, the cities under which they are listed. Most restrictions are from 7 a.m. to 6 p.m. weekdays. Any lane on the road could be closed between the two cross streets in most listings. Weather conditions may change plans.
For information on county road projects, call 866-766-7623 or go to www.snoco.org and use the keyword search. State highway and freeway information is at www.wsdot.wa.gov/Northwest/Snohomish/Construction.
Arlington
n Lake Cavanaugh Road, between Highway 530 and Deer Creek Road. A single-lane closure through Friday. Road work.
Bothell
n 194th Street SE, west of Bothell-Everett Highway, heading east to the end of the county road right-of-way. A single-lane closure through Aug. 6. Water line installation.
Darrington
n Squire Creek Road, west of Stillaguamish Ave. Road closure July 19-21. Road and bridge work.
Everett
n Fourth Drive SE, from the 12300 block of Fourth Drive SE to Fifth Avenue SE; Fifth Drive SE, from the 12300 block to the 12100 block; Freeway Place, at the 12000 block. A moving full road closure and an alternating lane closure through Friday. Detour routes posted. Water line work.
Granite Falls
n Engebretson Road, at the intersection of Jordan Road. A full road closure through Friday. A detour route is posted. Road work.
Lynnwood
n 13th Avenue W., at 170th Place SW; 170th Place SW, from 13th Avenue W., east to end of cul-de-sac. A single-lane closure through July 12. Utility work.
Stanwood
n Eide Road. Road closure through December 2011. No detour route. Road work.
n 236th Street NW, between Pioneer Highway and Fourth Avenue NW. A single-lane closure July 19 through Aug. 16. Embankment repairs.
Sultan
n 311th Avenue SE, from U.S. 2 south to Ben Howard Road; Ben Howard Road from 311th Avenue SE west to Cedar Ponds Road; Cedar Ponds Road, from Ben Howard Road to end of county road. A single-lane closure through Sept. 3. Utility work.
