Many clues to collapse

MINNEAPOLIS – A house of cards is how some engineers describe the steel-truss system used on the Interstate 35W bridge that collapsed into the Mississippi River, saying that almost any piece of the complex design that failed would have brought down the entire span.

Experts said Thursday that it was too early to speculate about the specific causes of Wednesday’s bridge failure, but most previous failures of bridges over rivers have been for a handful of known reasons: weak foundations, corrosion, metal fatigue, ship collisions and errors in the original design.

The bridge in Minneapolis, just south of downtown, was being closely watched by transportation officials after studies warned about its deteriorating condition. Six years ago, significant corrosion and cracking were found under the roadway, but a top expert in metal fatigue concluded that they did not pose a safety hazard.

The Interstate 35W collapse also occurred during a construction program to replace the roadway, another red flag to many experts who theorized that vibrations or unintended disruptions to the truss structure under the roadway could have weakened the bridge so much that it could not bear the load of rush-hour traffic Wednesday evening.

“We thought we had done all we could,” Dan Dorgan, an engineer for the Minnesota Department of Transportation, said Thursday. “Obviously, something went terribly wrong.”

Thousands of steel-truss bridges were built in the 1950s and 1960s interstate boom, because they can support large traffic loads with minimal amounts of steel. Engineers stopped designing them long ago, because they require so much labor to build, require high maintenance and were eclipsed by newer technologies.

The I-35W bridge was entirely supported by two main trusses, composed of many small pieces of steel bolted or welded together like a child’s erector set. Though it is possible to design a steel-truss bridge with redundancy, the I-35W bridge was supported only by two main trusses that were both essential to its integrity.

“A truss-arch bridge is like a chain – if you try to take out one link, you lose the whole system,” said Abolhassan Astaneh-Asl, an expert in steel-truss bridges at the University of California, Berkeley. “They are very vulnerable to instability.”

Astaneh-Asl compared a steel-truss system to a house of cards, which will collapse quickly if one card is pulled out.

The risk was demonstrated in 1967, when a steel-truss bridge collapsed over the Ohio River, killing 46 people, said Kent Harries, a civil engineer at the University of Pittsburgh. Not long afterward, an association of highway engineers banned any new bridges that could collapse if a single element failed, so-called non-redundant structures.

The I-35W bridge was completed in 1967.

The bridge collapse was caught on a surveillance video. It shows the bridge’s 458-foot main span dropping straight down and within seconds the west and east spans buckling and collapsing.

“The real notable thing is the speed and completeness of the collapse,” Harries said.

A number of bridges collapse each year in the United States – though seldom as dramatically as occurred Wednesday.

Of the roughly half-million bridges that cross water, about 1,500 collapsed between 1966 and 2005, according to Jean-Louis Briaud, a Texas A&M University civil engineer and expert in bridge failure. About 900 collapses occurred when rivers scoured the foundations of bridge support piers, he said. A few dozen deaths each year occur when bridges collapse.

Briaud would not rule out scour in the I-35W collapse, even though the piers rest on the river banks and the main span covers the entire width of the river. Scour still could have occurred on the banks and caused the piers to slowly tilt over time, he said.

Divers pressed their search Thursday for victims of the catastrophic collapse as dozens of distraught families awaited word on missing relatives.

At least four people were confirmed dead Wednesday and 79 were reported injured when the bridge suddenly gave way. As bumper-to-bumper rush-hour traffic crawled over it, a nearly 500-foot span of the truss bridge crashed into the river about 64 feet below, bringing dozens of vehicles down with it.

Police said the death toll was certain to rise with the recovery of bodies trapped in vehicles under tons of concrete or in the murky river. The recovery effort proceeded slowly, impaired by strong currents, stiff winds and perilous wreckage, including chunks of concrete, mangled steel beams and a jumble of cables and electrical wires.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Janet Garcia walks into the courtroom for her arraignment at the Snohomish County Courthouse on Monday, April 22, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Everett mother found competent to stand trial in stabbing death of 4-year-old son

A year after her arraignment, Janet Garcia appeared in court Wednesday for a competency hearing in the death of her son, Ariel Garcia.

Everett council member to retire at end of term

Liz Vogeli’s retirement from the council opens up the race in the November election for Everett’s District 4 seat.

Washington State Department of Commerce Director Joe Nguyễn speaks during the Economic Alliance Snohomish County’s Annual Meeting and Awards events on Tuesday, April 22, 2025 in Tulalip, Washington. (Olivia Vanni / The Herald)
Commerce boss: How Washington state can make it easier for small businesses

Joe Nguyen made the remarks Wednesday during the annual meeting of the Economic Alliance Snohomish County and the Snohomish County Awards

LifeWise local co-directors Darcie Hammer and Sarah Sweeny talk about what a typical classroom routine looks like on Monday, April 14, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Everett off-campus Bible program draws mixed reaction from parents

The weekly optional program, LifeWise Academy, takes children out of public school during the day for religious lessons.

An EcoRemedy employee checks a control panel of their equipment at the Edmonds Wastewater Treatment Plant on Thursday, April 17, 2025 in Edmonds, Washington. (Olivia Vanni / The Herald)
Edmonds launches technology to destroy PFAS

Edmonds is the first city in the country to implement… Continue reading

Mary Ann Karber, 101, spins the wheel during Wheel of Forunte at Washington Oakes on Tuesday, April 1, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Lunch and Wheel of Fortune with some Everett swinging seniors

She’s 101 and he’s 76. At Washington Oakes, fun and friendship are on the menu.

Founder of Faith Lutheran Food Bank Roxana Boroujerd helps direct car line traffic while standing next to a whiteboard alerting clients to their date of closing on Friday, April 25, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Faith Food Bank to close, replacement uncertain

The food bank’s last distribution day will be May 9, following a disagreement with the church over its lease.

Christian Sayre sits in the courtroom before the start of jury selection on Tuesday, April 29, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Jury selection begins in latest trial of former Everett bar owner

Opening statements for Christian Sayre’s fourth trial are scheduled for Monday. It is expected to conclude by May 16.

Ian Terry / The Herald

Zachary Mallon, an ecologist with the Adopt A Stream Foundation, checks the banks of Catherine Creek in Lake Stevens for a spot to live stake a willow tree during a volunteer event on Saturday, Feb. 10. Over 40 volunteers chipped in to plant 350 trees and lay 20 cubic yards of mulch to help provide a natural buffer for the stream.

Photo taken on 02102018
Snohomish County salmon recovery projects receive $1.9M in state funding

The latest round of Climate Commitment Act dollars will support fish barrier removals and habitat restoration work.

Fosse will not seek reelection; 2 candidates set to run for her seat

Mason Rutledge and Sam Hem announced this week they will seek the District 1 City Council position.

A few significant tax bills form the financial linchpin to the state’s next budget and would generate the revenue needed to erase a chunk of a shortfall Ferguson has pegged at $16 billion over the next four fiscal years. The tax package is expected to net around $9.4 billion over that time. (Stock photo)
Five tax bills lawmakers passed to underpin Washington’s next state budget

Business tax hikes make up more than half of the roughly $9 billion package, which still needs a sign-off from Gov. Bob Ferguson.

Logo for news use featuring the municipality of Brier in Snohomish County, Washington. 220118
Brier police levy fails; officials warn current staffing is not sustainable

With no new funding, officials say the department will remain stretched thin.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.