Two new Snohomish schools

SNOHOMISH — Elijah Spencer is eager to go back to school Tuesday.

So are hundreds of other children at Machias and Riverview elementary schools in the Snohomish School District.

Roughly 850 students from the two schools have been sharing space on the former Snohomish Freshman Campus, 801 Glen St., since fall 2009.

Their old campuses were demolished. They will be returning to spotless, fresh-smelling new buildings.

Elijah, 6, is excited to explore his new digs at Machias Elementary School.

“I want to see the new playground and to see what new toys are on it,” Elijah said. “I want to see my new classroom. I want to find out where I am sitting and what my desk looks like. I want to go up and down the elevator if they let me.”

Actually, Elijah and most students will use the stairs. The elevator primarily will be used by students with special needs.

Money for the projects comes from a $261 million bond measure Snohomish School District voters approved in 2008. It also is paying for renovation and expansion at Centennial Middle School, replacement of Valley View Middle School, more construction at Snohomish High School and a new aquatics center.

With contractors hungry for work during the recession, both elementary schools will have cost less to build than their original estimates. The bill for Machias will be around $31 million compared to early projections of $36.6 million; Riverview’s tab is expected to be $33 million compared to the preliminary estimates of $37 million.

The savings come as a relief for a district hit hard by skyrocketing construction costs a few years ago. Together, three major school construction projects, including Glacier Peak High School, were millions of dollars above the estimates voters were given in 2004 when they approved the bonds to build them.

At the time, analysts blamed surging costs on several factors. Steel, concrete and copper wiring were at a premium because of China’s construction boom and the rebuilding in the Gulf Coast region following Hurricane Katrina. Construction projects closer to home, such as high-rises in downtown Bellevue, were gobbling up workers and intensifying competition for labor.

When the economy hit the skids, it made school projects more appealing to contractors.

“The pendulum has swung the other way,” said Steve Moore, program manager for the district’s capital projects program.

District officials hope a bid for construction at Valley View Middle School also will come in low. Bids are expected Jan. 20. Valley View students will begin attending the old freshman campus Tuesday to make room for construction at their school.

Machias and Riverview have been replaced by two-story buildings. Both schools make heavy use of windows to use natural light. They also have small sections of vegetation on their roofs.

Elijah hoped to see a goat nibbling away on the roof at Machias, an image he saw in a drawing.

The low-growth ground cover won’t need mowing, or a goat, for that matter, district spokeswoman Kristin Foley said.

There are plenty of nice touches at both schools.

Riverview offers glimpses of the Cascade and Olympic mountains as well as Mount Baker.

Both schools recycled beams for their ceilings from the old buildings. Some of the wood also was used for steps to the second floor at Riverview and stairs to the stage at Machias.

Riverview Principal Tammy Jones said everyone is excited for Tuesday, herself included.

“We are going home,” Jones said. “The wait was definitely worth it. I can’t wait to see the eyes of the kids walking through the door.”

Eric Stevick: 425-339-3446, stevick@heraldnet.com.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Cars drive along Cathcart Way next to the site of the proposed Eastview Village development that borders Little Cedars Elementary on Wednesday, May 7, 2025 in unincorporated Snohomish, Washington. (Olivia Vanni / The Herald)
Former engineer: Snohomish County rushed plans for Eastview development

David Irwin cited red flags from the developers. After he resigned, the county approved the development that’s now stalled with an appeal

Outside of the Madrona School on Monday, Aug. 26, 2024 in Edmonds, Washington. (Olivia Vanni / The Herald)
Sewer district notifies Edmonds schools of intent to sue

The letter of intent alleges the school district has failed to address long-standing “water pollution issues” at Madrona K-8 School.

Everett
Man stabbed in face outside Everett IHOP, may lose eye

Police say the suspect fled in the victim’s car, leading officers on a 6-mile chase before his arrest.

A person walks up 20th Street Southeast to look at the damage that closed the road on Wednesday, Nov. 20, 2024 in Lake Stevens, Washington. (Olivia Vanni / The Herald)
WA delegation urges Trump to reconsider request for bomb cyclone aid

The Washington state congressional delegation urged President Donald Trump on… Continue reading

Aaron Weinstock uses an x-ray machine toy inside the Imagine Children Museum on Tuesday, Dec. 3, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Imagine Children’s Museum $250k grant reinstated following federal court order

The federal grant supports a program that brings free science lessons to children throughout rural Snohomish County.

Snohomish County 911 Executive Director Kurt Mills talks about the improvements made in the new call center space during a tour of the building on Tuesday, May 20, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
New 911 center in Everett built to survive disaster

The $67.5 million facility brings all emergency staff under one roof with seismic upgrades, wellness features and space to expand.

Everett
Five arrested in connection with Everett toddler’s 2024 overdose death

More than a year after 13-month-old died, Everett police make arrests in overdose case.

Madison Family Shelter Family Support Specialist Dan Blizard talks about one of the pallet homes on Monday, May 19, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Madison Family Shelter reopens after hiatus

The Pallet shelter village, formerly Faith Family Village, provides housing for up to eight families for 90 days.

Help Washington manage European green crabs with citizen science events

Washington State University and Washington Sea Grant will hold a training at Willis Tucker Park on June 2.

Emilee Swenson pulls kids around in a wagon at HopeWorks' child care center Tomorrow’s Hope, a job training program for people interested in child care, on Tuesday, Sept. 7, 2021 in Everett, Washington. HopeWorks is one of the organizations reciving funding from the ARPA $4.3 million stipend. (Andy Bronson / The Herald)
Early learning group presents countywide survey findings

The survey highlighted the largest issues parents and providers are facing amid the county’s child care crisis.

Brian Murril, who started at Liberty Elementary as a kindergartner in 1963, looks for his yearbook photograph during an open house for the public to walk through the school before its closing on Thursday, May 29, 2025 in Marysville, Washington. (Olivia Vanni / The Herald)
Locals say goodbye to Marysville school after 74 years

Liberty Elementary is one of two schools the Marysville School District is closing later this year to save costs.

U.S. Sen. Patty Murray speaks at a round table discussion with multiple Snohomish County agencies about the Trump administrator restricting homelessness assistance funding on Thursday, May 29, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Sen. Murray hears from county homelessness assistance providers

In early May, Snohomish County sued the Trump administration for putting unlawful conditions on $16.7M in grant funding.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.