Stilly River bridge work will disrupt I-5 traffic for months

ARLINGTON — Bridge work on I-5 over the Stillaguamish River will result in a major traffic disruption this summer.

The state Department of Transportation is replacing the concrete deck and part of the steel support frame of the bridge span that carries southbound traffic across the river.

Starting in mid-July, work crews will close the 607-foot-long span and redirect southbound vehicles across the median onto the bridge that currently carries northbound traffic.

The northbound bridge will be restriped to allow for two lanes each of northbound and southbound traffic, separated by a concrete barrier.

ADVERTISEMENT
0 seconds of 0 secondsVolume 0%
Press shift question mark to access a list of keyboard shortcuts
00:00
00:00
00:00
 

Each span of the bridge carries an average of 39,000 vehicles per day, but that can rise to 50,000 per day during summer. The heaviest traffic volume occurs between 3 to 6 p.m. Thursdays and Fridays and from 11 a.m. to 4 p.m. on the weekends northbound, and from 4 to 6 p.m. Sundays southbound.

The work is expected to take approximately four months, ending in late October or early November. An exact start date for the closure has not been set.

The bridge bearing the southbound lanes was built in 1933 to carry Highway 99 across the Stilly.

The bridge deck has been overlaid several times since then, but after a 2012 inspection it was put on the state’s “structurally deficient” list.

The northbound bridge was built in 1971 and is still rated as being in good condition.

“It’s come time that we need to replace the concrete deck,” said Todd Harrison, WSDOT’s regional assistant administrator.

The bridge deck has potholes and cracks, and some of the underlying steel beams and stringers — beams that run parallel to the direction of travel — that support the deck are corroding, Harrison said.

“Structurally deficient” does not imply the bridge is in danger of imminent collapse, but indicates that one or more components of the bridge need repair or replacement.

According to the transportation department’s website, there are 139 state-owned bridges in Washington with that rating.

The steel truss bridge comprises three spans over the river. The superstructure of the bridge is in good condition, Harrison said, and is not included in the project.

Last year, an oversize truck hit one of the overhead trusses on the Skagit River Bridge on I-5, causing a span to collapse. There is a significant difference between the two, however, in that the old Skagit River Bridge’s overhead trusses were arc-shaped, with just 15 feet, 3 inches of clearance at the outer edge of the travel lanes, which is where the truck hit the span, compared with 18 feet at the center of the roadway.

The Stillaguamish River Bridge’s trusses are horizontal, with uniform clearance of 16 feet, 5 inches all the way across, Harrison said. The new Skagit River span has horizontal trusses with 18 feet of clearance.

Once the work starts, speed will be reduced through the work area to 55 miles per hour, and the lanes will be reduced to 11 feet in width, from 12 feet.

Tow trucks will be in the area to quickly remove any disabled vehicles from the bridge.

“The goal is to keep traffic moving and keep it safe,” Harrison said.

The interchanges immediately north and south of the bridge, at 236th Street NE and Highway 530, will stay open.

During the work period, the transportation department is encouraging drivers to avoid traveling on the bridge during peak hours, to check the state’s website for updates (wsdot.wa.gov/projects/i5/stillaguamishbridgerehab), and to plan for delays of up to 35 minutes if you need to cross the bridge during those peak hours.

Alternate routes for local traffic include Highway 9 east of I-5 and Pioneer Highway west of the interstate.

Mowat Construction Co. was awarded the $8.7 million contract for the project. All but $350,000 is paid for by federal bridge preservation funds, with the state picking up the remainder.

The contract has a built-in incentive of $50,000 per day, up to a maximum of $500,000, if the work is finished in fewer than 120 days. It also has a disincentive built in if the work takes longer than expected.

Chris Winters: 425-374-4165; cwinters@heraldnet.com.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Cars drive along Cathcart Way next to the site of the proposed Eastview Village development that borders Little Cedars Elementary on Wednesday, May 7, 2025 in unincorporated Snohomish, Washington. (Olivia Vanni / The Herald)
Former engineer: Snohomish County rushed plans for Eastview development

David Irwin cited red flags from the developers. After he resigned, the county approved the development that’s now stalled with an appeal

Outside of the Madrona School on Monday, Aug. 26, 2024 in Edmonds, Washington. (Olivia Vanni / The Herald)
Sewer district notifies Edmonds schools of intent to sue

The letter of intent alleges the school district has failed to address long-standing “water pollution issues” at Madrona K-8 School.

Everett
Man stabbed in face outside Everett IHOP, may lose eye

Police say the suspect fled in the victim’s car, leading officers on a 6-mile chase before his arrest.

A person walks up 20th Street Southeast to look at the damage that closed the road on Wednesday, Nov. 20, 2024 in Lake Stevens, Washington. (Olivia Vanni / The Herald)
WA delegation urges Trump to reconsider request for bomb cyclone aid

The Washington state congressional delegation urged President Donald Trump on… Continue reading

Aaron Weinstock uses an x-ray machine toy inside the Imagine Children Museum on Tuesday, Dec. 3, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Imagine Children’s Museum $250k grant reinstated following federal court order

The federal grant supports a program that brings free science lessons to children throughout rural Snohomish County.

Snohomish County 911 Executive Director Kurt Mills talks about the improvements made in the new call center space during a tour of the building on Tuesday, May 20, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
New 911 center in Everett built to survive disaster

The $67.5 million facility brings all emergency staff under one roof with seismic upgrades, wellness features and space to expand.

Everett
Five arrested in connection with Everett toddler’s 2024 overdose death

More than a year after 13-month-old died, Everett police make arrests in overdose case.

Madison Family Shelter Family Support Specialist Dan Blizard talks about one of the pallet homes on Monday, May 19, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Madison Family Shelter reopens after hiatus

The Pallet shelter village, formerly Faith Family Village, provides housing for up to eight families for 90 days.

(City of Everett)
Everett’s possible new stadium has a possible price tag

City staff said a stadium could be built for $82 million, lower than previous estimates. Bonds and private investment would pay for most of it.

Jennifer Humelo, right, hugs Art Cass outside of Full Life Care Snohomish County on Wednesday, May 28, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
‘I’ll lose everything’: Snohomish County’s only adult day health center to close

Full Life Care in Everett, which supports adults with disabilities, will shut its doors July 19 due to state funding challenges.

A member of the Sheriff's office works around evidence as investigators work the scene on 20th Street SE near Route 9 after police shot and killed a man suspected in a car theft on Friday, Jan. 13, 2023, in Lake Stevens, Washington. (Ryan Berry / The Herald)
Family of Lake Stevens man shot by police sues over mental health care delays

Lawsuit says state failed to evaluate James Blancocotto before he was shot fleeing in a patrol car.

The age of bridge 503 that spans Swamp Creek can be seen in its timber supports and metal pipes on Wednesday, May 15, 2024, in Lynnwood, Washington. The bridge is set to be replaced by the county in 2025. (Ryan Berry / The Herald)
Snohomish County report: 10 bridges set for repairs, replacement

An annual report the county released May 22 details the condition of local bridges and future maintenance they may require.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.