Floodplain issues complicate Stanwood City Hall update

STANWOOD — City Hall is overdue for an update, but its location in a floodplain complicates the project.

Federal requirements for flood-proofing buildings during a major renovation would multiply the cost of an upgrade, adding about $1 million to a project that could cost up to $620,000 on its own, according to city documents.

City leaders have been seeking ways to phase in renovations, but that approach also is running up against floodplain regulations.

Snohomish County has been part of the National Flood Insurance Program since 1984. This means the county has specific development requirements within floodplains. In return, the federal government makes flood insurance available.

ADVERTISEMENT
0 seconds of 0 secondsVolume 0%
Press shift question mark to access a list of keyboard shortcuts
00:00
00:00
00:00
 

One requirement is that any renovation costing more than 50 percent of a building’s value requires the building to be flood-proofed, often by elevating it.

The Stanwood City Hall project runs into its 50 percent cutoff at $192,000. If it costs more than that, the building would need to be elevated about 8 feet in order to meet requirements, Community Development Director Ryan Larsen said. In the mayor’s office, the floor would be where the lights are now.

It would cost more to flood-proof Stanwood City Hall than the price of a full renovation. The city estimates it would need between $750,000 and $1.25 million to elevate the building.

Earlier this year, Stanwood City Council members decided to prioritize renovations and do a smaller scale project that would fall within the $192,000 limit.

The council voted Thursday to reject all four bids the city received for the project. The lowest was $303,000.

Stanwood has applied for a $1 million federal hazard mitigation planning grant to elevate City Hall, and staff hope to hear back in October, Larsen said.

In the meantime, phasing in some of the more pressing updates could allow the city to stay within its budget. City code requires a two-year window between the projects if they are phased in, city administrator Deborah Knight said.

Stanwood City Hall was built in 1939 and has been used as a city hall, police station and jail, and community center and stage. The last time the building got an overhaul was in the 1960s.

Now, the community development department is crammed into a small space, the bathrooms need a remodel, the meeting room lacks any audio or visual equipment, and the flooring, paint, fixtures and furniture are outdated.

Several years ago, the city did some upgrades on the building. Workers removed the chimney, repaired siding, painted the outside and replaced the roof.

Next, city staff and leaders plan to move the community development department to a larger space near the mayor’s office and update the interior of the finance department. Eventually, they hope to put a new meeting room where the community development department is now. They also would like to redo the bathrooms.

“We’re still back in the mid-20th century with this building,” Knight said.

In the long run, city leaders need to determine whether to flood-proof and remodel the building or build a new City Hall outside of the floodplain.

“The council had originally, before the economic downturn, talked about building a new City Hall, but that got shelved,” Knight said.

It’s under discussion again after the Oso mudslide, which killed 43 people and altered the Stillaguamish River in ways that remain uncertain as flood season approaches.

“After that event, the council started talking about whether it made sense to keep the City Hall in a floodplain,” she said.

City leaders are keeping an eye out for potential locations, but Knight expects it will be years before a new building is planned.

Some small renovations — namely relocating the community development department — could be finished by January 2015 as long as they fall within the cost limit, she said. Stanwood City Hall might need to close for one day during the work, but otherwise would be open as usual. Fourteen employees work in City Hall and they see “a steady parade” of customers, Knight said.

Kari Bray: 425-339-3439; kbray@heraldnet.com.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Cars drive along Cathcart Way next to the site of the proposed Eastview Village development that borders Little Cedars Elementary on Wednesday, May 7, 2025 in unincorporated Snohomish, Washington. (Olivia Vanni / The Herald)
Former engineer: Snohomish County rushed plans for Eastview development

David Irwin cited red flags from the developers. After he resigned, the county approved the development that’s now stalled with an appeal

Outside of the Madrona School on Monday, Aug. 26, 2024 in Edmonds, Washington. (Olivia Vanni / The Herald)
Sewer district notifies Edmonds schools of intent to sue

The letter of intent alleges the school district has failed to address long-standing “water pollution issues” at Madrona K-8 School.

Everett
Man stabbed in face outside Everett IHOP, may lose eye

Police say the suspect fled in the victim’s car, leading officers on a 6-mile chase before his arrest.

A person walks up 20th Street Southeast to look at the damage that closed the road on Wednesday, Nov. 20, 2024 in Lake Stevens, Washington. (Olivia Vanni / The Herald)
WA delegation urges Trump to reconsider request for bomb cyclone aid

The Washington state congressional delegation urged President Donald Trump on… Continue reading

Aaron Weinstock uses an x-ray machine toy inside the Imagine Children Museum on Tuesday, Dec. 3, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Imagine Children’s Museum $250k grant reinstated following federal court order

The federal grant supports a program that brings free science lessons to children throughout rural Snohomish County.

Snohomish County 911 Executive Director Kurt Mills talks about the improvements made in the new call center space during a tour of the building on Tuesday, May 20, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
New 911 center in Everett built to survive disaster

The $67.5 million facility brings all emergency staff under one roof with seismic upgrades, wellness features and space to expand.

Everett
Five arrested in connection with Everett toddler’s 2024 overdose death

More than a year after 13-month-old died, Everett police make arrests in overdose case.

Madison Family Shelter Family Support Specialist Dan Blizard talks about one of the pallet homes on Monday, May 19, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Madison Family Shelter reopens after hiatus

The Pallet shelter village, formerly Faith Family Village, provides housing for up to eight families for 90 days.

People take photos and videos as the first Frontier Arlines flight arrives at Paine Field Airport under a water cannon salute on Monday, June 2, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Water cannons salute Frontier on its first day at Paine Field

Frontier Airlines joins Alaska Airlines in offering service Snohomish County passengers.

Kaiser Permanente to welcome patients to new Everett facility

The new building, opening Tuesday, features new service lines and updated technology for patients and staff.

A woman flips through a book at the Good Cheer Thrift Store in Langley. (Olivia Vanni / The Herald)
Pop some tags at Good Cheer Thrift Store in Langley

$20 buys an outfit, a unicycle — or a little Macklemore magic. Sales support the food bank.

Searchers recover submerged shrimp boat, two bodies from Possession Sound

Everett police failed to locate a third person reported missing after the boat sank in Possession Sound on May 21.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.