Edmonds to restore marsh by exposing Willow Creek

EDMONDS — As drivers approach the ferry terminal along Edmonds Way, they might see hints of what existed 150 years ago.

Cattails poke up along both sides of the road. There’s a 32-acre fresh- and saltwater marsh that is home to an annual bird festival.

The cattails and wetland are remnants of what was once a 100-acre marsh. As documented on an 1870 map, it stretched from what is now Marina Beach Park north to Brackett’s Landing.

ADVERTISEMENT
0 seconds of 0 secondsVolume 0%
Press shift question mark to access a list of keyboard shortcuts
00:00
00:00
00:00
 

“When we show that map to people in Edmonds, they’re like, “What? No way!” said Keeley O’Connell, a senior project manager for the Seattle nonprofit Earthcorps.

What O’Connell, a consultant, and the city of Edmonds now hope to do is turn back at least a few pages of the marsh’s biological calender, allowing saltwater to flow more freely, providing more habitat for animals and establishing a safe harbor for young salmon to eat and grow before they enter Puget Sound.

All this would come by restoring a more natural flow to Willow Creek into and out of the marsh. Plans call for freeing about 1,000 feet of the creek from pipes in which it has been encased since the 1960s, allowing it to meander toward the beach.

Juvenile salmon, once they migrate out of streams, are looking for salt marshes to rear in.

“Salt marshes are really important in their life cycle,” O’Connell said. “There are fewer predators, lots of hidey-holes and shade to keep the water cool.” Salmon are so driven by a sense of smell that they can detect the location of a marsh, she said.

Fish slightly bigger than fingerlings could feed and grow in the marsh until they’re better able to survive in Puget Sound, said Phil Williams, the city public works director. The marsh and restoration of the creek will serve all species of young salmon, including juvenile chinook.

It also could benefit coho salmon returning home to spawn, something that hasn’t happened in Willow Creek for more than 50 years, O’Connell said.

“We’ve had fish biologists look at the project,” O’Connell said. “They feel if we can re-create the channel connection between the marsh, across the beach and to the Sound, juveniles and adult salmon can get in there.”

The idea of restoring Willow Creek has been under way for three years. First came feasibility studies. Restoring streams in urban environments is extremely expensive, O’Connell said. In the case of Willow Creek, it could cost $9 million. So the city and the state first wanted to know that the project could have the hoped results.

The most recent step came last week, with a $157,331 grant from the state Recreation and Conservation office. The money will be used to prepare a preliminary design and for permit applications to open the creek from the marsh, under the nearby railroad tracks, across Marina Beach and into Puget Sound. The city will contribute at least $36,160 to this part of the project.

“The marsh outlet is a combination of a narrow ditch with buried pipes and vaults,” said Susan Zemek, a spokeswoman for the state agency.

If they’re able to get the water out of the pipes, “they’ll be able to open up access to 32 acres of marsh, which would be great for young fish,” she said.

It’s the first time the city has planned to free a creek from pipes and “daylight” a stream, said Williams, the public works director. Design work and finding the money to pay for the project could take two to three years, he said.

Fisheries biologists working for the Tulalip Tribes have found that young salmon will go relatively far up coastal creeks to rear and find food, O’Connell said.

The young fish ride the tides, she said, and eventually will find their way in and out of the marsh.

Incoming adult salmon wouldn’t have any problem making their way from the Sound, up the creek, through the marsh and into bubbling sections of stream where they could lay their eggs, O’Connell said.

Fish from the creek’s hatchery now are released into area rivers. Outgoing fish would not be able to navigate the 1,600 feet from the hatchery through the creek, with its long sections of pipe and sharp turns to an outlet deep in Puget Sound.

About 98 percent of all the salt marshes between Everett and Tacoma have been lost, O’Connell said. “The fact that Edmonds has 32 acres that never got filled and developed is really … a very unique opportunity in our region,” she said.

Sharon Salyer: 425-339-3486; salyer@heraldnet.com.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Cars drive along Cathcart Way next to the site of the proposed Eastview Village development that borders Little Cedars Elementary on Wednesday, May 7, 2025 in unincorporated Snohomish, Washington. (Olivia Vanni / The Herald)
Former engineer: Snohomish County rushed plans for Eastview development

David Irwin cited red flags from the developers. After he resigned, the county approved the development that’s now stalled with an appeal

Outside of the Madrona School on Monday, Aug. 26, 2024 in Edmonds, Washington. (Olivia Vanni / The Herald)
Sewer district notifies Edmonds schools of intent to sue

The letter of intent alleges the school district has failed to address long-standing “water pollution issues” at Madrona K-8 School.

Everett
Man stabbed in face outside Everett IHOP, may lose eye

Police say the suspect fled in the victim’s car, leading officers on a 6-mile chase before his arrest.

A person walks up 20th Street Southeast to look at the damage that closed the road on Wednesday, Nov. 20, 2024 in Lake Stevens, Washington. (Olivia Vanni / The Herald)
WA delegation urges Trump to reconsider request for bomb cyclone aid

The Washington state congressional delegation urged President Donald Trump on… Continue reading

Aaron Weinstock uses an x-ray machine toy inside the Imagine Children Museum on Tuesday, Dec. 3, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Imagine Children’s Museum $250k grant reinstated following federal court order

The federal grant supports a program that brings free science lessons to children throughout rural Snohomish County.

Snohomish County 911 Executive Director Kurt Mills talks about the improvements made in the new call center space during a tour of the building on Tuesday, May 20, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
New 911 center in Everett built to survive disaster

The $67.5 million facility brings all emergency staff under one roof with seismic upgrades, wellness features and space to expand.

Everett
Five arrested in connection with Everett toddler’s 2024 overdose death

More than a year after 13-month-old died, Everett police make arrests in overdose case.

Madison Family Shelter Family Support Specialist Dan Blizard talks about one of the pallet homes on Monday, May 19, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Madison Family Shelter reopens after hiatus

The Pallet shelter village, formerly Faith Family Village, provides housing for up to eight families for 90 days.

Searchers recover submerged shrimp boat, two bodies from Possession Sound

Everett police failed to locate a third person reported missing after the boat sank in Possession Sound on May 21.

The Everett Municipal Building on Thursday, Feb. 29, 2024 in Everett, Washington. (Annie Barker / The Herald)
Everett Municipal Building to close for two weeks

The closure is part of the building’s $36 million repair project. City staff will be accessible by phone and email during business hours.

Help Washington manage European green crabs with citizen science events

Washington State University and Washington Sea Grant will hold a training at Willis Tucker Park on June 2.

Emilee Swenson pulls kids around in a wagon at HopeWorks' child care center Tomorrow’s Hope, a job training program for people interested in child care, on Tuesday, Sept. 7, 2021 in Everett, Washington. HopeWorks is one of the organizations reciving funding from the ARPA $4.3 million stipend. (Andy Bronson / The Herald)
Early learning group presents countywide survey findings

The survey highlighted the largest issues parents and providers are facing amid the county’s child care crisis.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.