Northern leg is key say Canada pipeline proponents

  • By Charmaine Noronha Associated Press
  • Thursday, March 22, 2012 8:09pm
  • Business

TORONTO — Canadian proponents of TransCanada’s Keystone XL pipeline applauded Barack Obama’s directive on Thursday to expedite the approval process for the southern leg of the pipeline. They also urged the U.S. president to approve the northern leg.

Obama directed federal agencies to expedite a 485-mile line from Oklahoma to refineries on Texas’ Gulf Coast that would remove a critical bottleneck in the U.S. oil transportation system, backing a segment of the larger Keystone XL project that he rejected earlier this year.

Dave Collyer, president of the Canadian Association of Petroleum Producers, said while Obama’s directive is a step in the right direction, it neglects the most vital leg of the pipeline for Canada.

“I think the important thing to keep in mind is that it doesn’t help move incremental volume out of Canada so we still need the northern leg of the pipeline to be built or some other alternative,” said Collyer.

Travis Davies, a spokesman for the association, said Obama’s move reflects the findings of State Department that the large KXL project is in the national interest and has economic, energy supply and environmental merit for the U.S.

“That said, while the project will help with the oversupply at Cushing in the near term, Canadian producers are obviously more concerned with getting oil from Canada down to the Gulf coast refining market via the full KXL project,” he said.

American oil industry executives have also stressed Obama needs to greenlight the entire $7.6 billion pipeline, not just a portion of it.

The full proposed pipeline, which would cross the U.S. border in Montana, is designed to bring between 500,000 to 700,000 barrels a day from the Canadian oil sands region to refineries on the Gulf Coast. It would shortcut to an existing pipe that goes through much of Canada before cutting into the United States in North Dakota on the way to the oil storage center in Cushing, Oklahoma.

Approval of the southern part of the pipeline is not really the Obama administration’s call because it does not cross borders. The northern portion of the pipeline needs administration approval because it would cross the Canadian border.

The U.S. State Department has yet to make a decision on the entire length of the proposed pipeline, saying it needs more time to conduct a thorough environmental review of a new route around an environmentally sensitive aquifer in Nebraska.

The longer 1,700-mile (2,735-kilometer) pipeline became a political flashpoint late last year when congressional Republicans wrote a provision forcing Obama to make a decision, and environmental groups waged a campaign to kill the project. In January, Obama delayed it, saying the deadline didn’t leave enough time for review.

Pipeline proponents cried foul, accusing Obama of making a cynical political move aimed at pacifying the environmentalists in the president’s political base and improving his chances of re-election.

Outraged Republicans then successfully inserted pipeline provisions into payroll tax cut legislation in late December.

But within a month, facing a mid-February deadline imposed by that measure, Obama nixed TransCanada’s existing permit outright, saying there wasn’t enough time to thoroughly review a new route before giving it the green light.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Business

People walk along a newly constructed bridge at the Big Four Ice Caves hike along the Mountain Loop Highway in Snohomish County, Washington on Wednesday, July 19, 2023. (Annie Barker / The Herald)
Check out the best tourist attractions in Snohomish County

Here’s a taste of what to do and see in Snohomish County, from shopping to sky diving.

People walk out of the Columbia Clearance Store at Seattle Premium Outlets on Thursday, April 25, 2024 in Quil Ceda Village, Washington. (Olivia Vanni / The Herald)
Head to Tulalip for retail recreation at Seattle Premium Outlets

The outlet mall has over 130 shops. You might even bring home a furry friend.

Brandon Baker, deputy director for the Port of Edmonds, shows off the port's new logo. Credit: Port of Edmonds
A new logo sets sail for the Port of Edmonds

Port officials say after 30 years it was time for a new look

Travis Furlanic shows the fluorescent properties of sulfur tuft mushrooms during a Whidbey Wild Mushroom Tour at Tilth Farmers Market on Saturday, April 27, 2024 in Langley, Washington. (Annie Barker / The Herald)
On Whidbey Island, local fungi forager offers educational mushroom tours

Every spring and fall, Travis Furlanic guides groups through county parks. His priority, he said, is education.

Penny Clark, owner of Travel Time of Everett Inc., at her home office on Tuesday, April 23, 2024 in Arlington, Washington. (Olivia Vanni / The Herald)
In a changing industry, travel agents ‘so busy’ navigating modern travel

While online travel tools are everywhere, travel advisers still prove useful — and popular, says Penny Clark, of Travel Time in Arlington.

ZeroAvia founder and CEO Val Mifthakof, left, shows Gov. Jay Inslee a hydrogen-powered motor during an event at ZeroAvia’s new Everett facility on Wednesday, April 24, 2024, near Paine Field in Everett, Washington. (Ryan Berry / The Herald)
ZeroAvia’s new Everett center ‘a huge step in decarbonizing’ aviation

The British-American company, which is developing hydrogen-electric powered aircraft, expects one day to employ hundreds at the site.

Allan and Frances Peterson, a woodworker and artist respectively, stand in the door of the old horse stable they turned into Milkwood on Sunday, March 31, 2024, in Index, Washington. (Ryan Berry / The Herald)
Old horse stall in Index is mini art gallery in the boonies

Frances and Allan Peterson showcase their art. And where else you can buy a souvenir Index pillow or dish towel?

Everett
Red Robin to pay $600K for harassment at Everett location

A consent decree approved Friday settles sexual harassment and retaliation claims by four victims against the restaurant chain.

magniX employees and staff have moved into the company's new 40,000 square foot office on Seaway Boulevard on Monday, Jan. 18, 2020 in Everett, Washington. magniX consolidated all of its Australia and Redmond operations under one roof to be home to the global headquarters, engineering, manufacturing and testing of its electric propulsion systems.  (Andy Bronson / The Herald)
Harbour Air plans to buy 50 electric motors from Everett company magniX

One of the largest seaplane airlines in the world plans to retrofit its fleet with the Everett-built electric propulsion system.

Simreet Dhaliwal speaks after winning during the 2024 Snohomish County Emerging Leaders Awards Presentation on Wednesday, April 17, 2024, in Everett, Washington. (Ryan Berry / The Herald)
Simreet Dhaliwal wins The Herald’s 2024 Emerging Leaders Award

Dhaliwal, an economic development and tourism specialist, was one of 12 finalists for the award celebrating young leaders in Snohomish County.

Lynnwood
New Jersey company acquires Lynnwood Land Rover dealership

Land Rover Seattle, now Land Rover Lynnwood, has been purchased by Holman, a 100-year-old company.

Szabella Psaztor is an Emerging Leader. (Olivia Vanni / The Herald)
Szabella Pasztor: Change begins at a grassroots level

As development director at Farmer Frog, Pasztor supports social justice, equity and community empowerment.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.