Highway 530 workers call for slowdown, citing safety worries

OSO — Crews clearing mudslide debris from Highway 530 are making headway but the swift progress has come at a price.

Some workers have walked off the job, calling for the effort to slow down due to safety concerns and to allow them to better inspect the material for human remains and lost personal effects.

Crews have also discovered the force of the March 22 mudslide uprooted some 600 feet of the road.

The workers have been toiling around the clock in 12-hour shifts since the cleanup began earlier this month. So far, they’ve cleared roughly half of the 90,000* cubic yards of muddy debris that buried the highway. The mudslide left about 9,000 dump truck loads of debris on the road, said Travis Phelps, a spokesman for the state Department of Transportation.

Phelps said crews are on track to have the road cleared by the month’s end. The workers then plan to stabilize slopes along the highway for safety. They’ll also need to remove material that was left behind from the earlier search-and-recovery mission. At least 41 people died in the mudslide. Two remain missing and are presumed dead.

Once that work is complete, crews plan to determine what needs to happen before the highway can open to one-way, piloted traffic. Phelps said he expects drivers to be able to use the highway in a way similar to how the nearby power-line access road detour is currently operating. A fully rebuilt highway is expected to open to general traffic by October.

“We’ve made some significant progress over the weekend,” Phelps said on Monday during a visit to the site for reporters. “We’ve also been working in a very respectful manner.”

Some disagree with the way the work is being conducted. Several local people hired as spotters, who look through each scoop of dirt for human remains and personal items, walked off the job on Sunday. More quit on Monday.

Their main concern is for their safety. They also say the fast pace of the cleanup isn’t allowing them to do their job well.

Safety fears peaked during the lightning and heavy rain on Sunday night, said Rhonda Cook, one of the spotters who also worked in the debris fields during the recovery effort until it was suspended on April 28.

On Sunday, “I had people sinking up to their waist and their thighs trying to navigate their way,” Cook said.

The spotters are as eager as everyone else to see Highway 530 open because they know how important the road is to the local economy, particularly the lumber mills in Darrington, she said.

At the same time, they feel a responsibility to the families, particularly the two whose loved ones are still missing, to do the work right.

“We just all get a feeling we are being paid to do a job we just can’t do,” she said.

The walk-offs stopped work for several hours on Sunday and Monday, Phelps said.

The Transportation Department is working to address the concerns. Though hazards come with any construction site, Phelps said, he believes the workers are safe. He cited zero accidents or injuries since the cleanup started.

Crews continue to remove several hundred truckloads of debris out of the area each day.

The primary spotters are state archeologists who watch shovels when they break ground.

Local spotters then scan the excavated material as it’s poured into trucks.

The trucks haul the debris to a nearby dump, where more archaeologists look for recoverable items.

“That’s the balancing act of clearing the material and making sure we don’t miss anything,” said Bart Treece, another WSDOT spokesman.

Crews take care in sorting through the material because it’s important to return personal items of those lost in the disaster to their loved ones, Phelps said.

“It might be all they have left,” he said. “A lot of folks are looking for those types of things to come back to.”

So far, crews have recovered a smashed car and a Bible. No human remains have been located in the highway cleanup. Bodies are unlikely to be found near the road, according to analysis of the debris field.

Treece said there’s about 500 feet of buried highway left to go. Crews might find that more of the highway has been destroyed or displaced when they clear remaining mud. Workers have discovered yellow-striped chunks of displaced road.

“We’ve found some quite a ways away and some pretty close to where it’s supposed to be,” Phelps said.

WSDOT expects to award the final contract to rebuild the highway by month’s end. Phelps said four contractors are vying for the job, worth up to $30 million.

“We still have a lot of work to do,” he said.

Amy Nile: 425-339-3192; anile@heraldnet.com.

*Correction, May 21, 2014: This article originally included an incorrect figure for the quantity of the debris.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Snohomish County prosecutor Kara Van Slyck delivers closing statement during the trial of Christian Sayre at the Snohomish County Courthouse on Thursday, May 8, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Jury deliberations begin in the fourth trial of former Everett bar owner

Jury members deliberated for about 2 hours before Snohomish County Superior Court Judge Millie Judge sent them home until Monday.

Danny Burgess, left, and Sandy Weakland, right, carefully pull out benthic organisms from sediment samples on Thursday, May 1, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
‘Got Mud?’ Researchers monitor the health of the Puget Sound

For the next few weeks, the state’s marine monitoring team will collect sediment and organism samples across Puget Sound

Everett
Everett considers ordinance to require more apprentice labor

It would require apprentices to work 15% of the total labor hours for construction or renovation on most city projects over $1 million.

Craig Skotdal makes a speech after winning on Tuesday, April 22, 2025 in Tulalip, Washington. (Olivia Vanni / The Herald)
Craig Skotdal: Helping to breathe life into downtown Everett

Skotdal is the recipient of the John M. Fluke Sr. award from Economic Alliance Snohomish County

Paine Field Community Day returns Saturday, May 17

The youth-focused celebration will feature aircraft displays, talks with pilots and a variety of local food vendors.

Jonathon DeYonker, left, helps student Dominick Jackson upload documentary footage to Premier at The Teen Storytellers Project on Tuesday, April 29, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Everett educator provides tuition-free classes in filmmaking to local youth

The Teen Storyteller’s Project gives teens the chance to work together and create short films, tuition-free.

Kyle Parker paddles his canoe along the Snohomish River next to Langus Riverfront Park on Thursday, May 8, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Tip to Tip: Kyle Parker begins his canoe journey across the country

The 24-year-old canoe fanatic started in Neah Bay and is making his way up the Skykomish River.

Carli Brockman lets her daughter Carli, 2, help push her ballot into the ballot drop box on the Snohomish County Campus on Tuesday, Nov. 5, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Here’s who filed for the primary election in Snohomish County

Positions with three or more candidates will go to voters Aug. 5 to determine final contenders for the Nov. 4 general election.

Kamiak High School is pictured Friday, July 8, 2022, in Mukilteo, Washington. (Ryan Berry / The Herald)
Mukilteo police respond to stabbing at Kamiak High School

One juvenile was taken into custody in connection with Friday’s incident. A victim was treated at a hospital with non-life-threatening injuries.

A Mukilteo firefighter waves out of a fire truck. (Photo provided by Mukilteo Fire Department)
Mukilteo council places EMS levy lift on November ballot

The city is seeking the funds to cover rising costs. The local firefighters union opposes the levy lift.

Everett
Federal prosecutors: Everett men looked to sell 7 kilos of fentanyl

Prosecutors alleged the two men stored fentanyl and other drugs while staying in a south Everett apartment.

Vehicles travel along Mukilteo Speedway on Sunday, April 21, 2024, in Mukilteo, Washington. (Ryan Berry / The Herald)
Mukilteo cameras go live to curb speeding on Speedway

Starting Friday, an automated traffic camera system will cover four blocks of Mukilteo Speedway. A 30-day warning period is in place.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.