Second grade teacher Stephanie Hill helps students with an Easter assignment. (Ian Terry / The Herald)

Second grade teacher Stephanie Hill helps students with an Easter assignment. (Ian Terry / The Herald)

New building expands capacity at Northshore Christian Academy

EVERETT — The new Cascade Pavilion at Northshore Christian Academy is expected to add more space for music, robotics, lunches and middle school classrooms.

The building is under construction now at the private, faith-based school. It’s the latest addition at a campus that has grown over the past couple of decades to keep up with a steady increase in enrollment.

Northshore Christian Church opened in 1993 as a plant of Overlake Christian Church. Two years later, the academy was founded. There were 37 students. Now, there are 1,015 students from toddlers to 8th grade.

ADVERTISEMENT
0 seconds of 0 secondsVolume 0%
Press shift question mark to access a list of keyboard shortcuts
00:00
00:00
00:00
 

The school and church were in a leased warehouse until 2003, when they moved to a permanent home at 5700 23rd Drive W, not far from Boeing’s Everett location.

Northshore Christian Academy includes specialty programs for art, music, science and engineering, and early education. Summer programs were added in 2005. The church shares space with the school, so the campus is busy all week long.

“We are really using God’s house to its max capacity, and we love that,” said Denise Christian, admissions and marketing director.

The academy is going from 145,000 square feet to 162,000 thanks to the addition of Cascade Pavilion. It’s the twin to Olympic Pavilion, built in 2010. The buildings are to be connected by an underground hallway and an upper story bridge.

Administrators expect an increase in enrollment after opening Cascade Pavilion this fall, but the school is close to capacity. The new building is meant to expand learning areas for current students, Christian said. It’s a $3.3 million project.

Workers have been putting in the foundation. Next will be steel framing, said Mark Lewinski, CEO and president of contractor Kirtley Cole. He feels good about the project and the company’s partnership with the school, he said.

The pavilion is designed to add a larger cafeteria that can seat two grade levels at a time rather than one, meaning longer lunch periods are possible. The existing cafeteria will be turned into a music space, and a new music room also is planned. That’s to better accommodate the 11 performing groups at the school, including orchestras, choirs and bands. One of the new building’s rooms is for Spanish teachers, who currently rove from classroom to classroom.

Another key feature of Cascade Pavilion is additional science and engineering space, a boon to the school’s three robotics teams.

“The school has grown so much and provided so much,” said David Chen, who volunteers as a robotics adviser. “From an engineering perspective, this is a dream come true, not only to mentor my own child but to mentor other children.”

Middle school students are mastering programming, design and manufacturing, all of which are vital skills in the workplace, he said.

Cascade Pavilion will allow the school to give sixth-grade students their own space, too. Currently, sixth-grade classrooms are spread throughout the campus. Giving elementary and middle school students separate areas creates a sense of community for them, said Glen Cowan, who serves on the church’s elder board and school board.

“It lets them have their identity,” he said.

Administrators and volunteers say their goal is to teach students to be kind to others and steady in their faith. They want students to leave the school as leaders.

Christian’s granddaughter attends the school.

“She has a heart for Jesus and I love that,” Christian said.

There are 17 languages spoken among the school’s students. They are not required to attend a Christian church to enroll, but Bible studies and chapel time are part of the curriculum.

After finishing middle school at Northshore Christian Academy, students go on to about 17 area high schools.

Kari Bray: 425-339-3439; kbray@heraldnet.com.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

(City of Everett)
Everett’s possible new stadium has a possible price tag

City staff said a stadium could be built for $82 million, lower than previous estimates. Bonds and private investment would pay for most of it.

Jennifer Humelo, right, hugs Art Cass outside of Full Life Care Snohomish County on Wednesday, May 28, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
‘I’ll lose everything’: Snohomish County’s only adult day health center to close

Full Life Care in Everett, which supports adults with disabilities, will shut its doors July 19 due to state funding challenges.

The age of bridge 503 that spans Swamp Creek can be seen in its timber supports and metal pipes on Wednesday, May 15, 2024, in Lynnwood, Washington. The bridge is set to be replaced by the county in 2025. (Ryan Berry / The Herald)
Snohomish County report: 10 bridges set for repairs, replacement

An annual report the county released May 22 details the condition of local bridges and future maintenance they may require.

The Edmonds City Council gathers to discuss annexing into South County Fire on Tuesday, Dec. 3, 2024 in Edmonds, Washington. (Olivia Vanni / The Herald)
Community group presents vision for Edmonds’ fiscal future

Members from Keep Edmonds Vibrant suggested the council focus on revenue generation and a levy lid lift to address its budget crisis.

Cars drive along Cathcart Way next to the site of the proposed Eastview Village development that borders Little Cedars Elementary on Wednesday, May 7, 2025 in unincorporated Snohomish, Washington. (Olivia Vanni / The Herald)
Former engineer: Snohomish County rushed plans for Eastview development

David Irwin cited red flags from the developers. After he resigned, the county approved the development that’s now stalled with an appeal

People listen as the Marysville School Board votes to close an elementary and a middle school in the 2025-26 school year while reconfiguring the district’s elementary schools to a K-6 model on Wednesday, Jan. 22, 2025 in Marysville, Washington. (Olivia Vanni / The Herald)
Marysville schools audit shows some improvement

Even though the district still faces serious financial problems, the findings are a positive change over last year, auditors said.

Outside of the Madrona School on Monday, Aug. 26, 2024 in Edmonds, Washington. (Olivia Vanni / The Herald)
Sewer district notifies Edmonds schools of intent to sue

The letter of intent alleges the school district has failed to address long-standing “water pollution issues” at Madrona K-8 School.

Kim Crane talks about a handful of origami items on display inside her showroom on Monday, Feb. 17, 2025, in Snohomish, Washington. (Olivia Vanni / The Herald)
Crease is the word: Origami fans flock to online paper store

Kim’s Crane in Snohomish has been supplying paper crafters with paper, books and kits since 1995.

Providence Regional Medical Center Everett. (Olivia Vanni/The Herald)
Providence Everett plans to reduce certified nursing assistants

Nursing assistants at Providence Regional Medical Center Everett have until Thursday to accept a voluntary severance package.

A firefighting helicopter carries a bucket of water from a nearby river to the Bolt Creek Fire on Saturday, Sep. 10, 2022, on U.S. 2 near Index, Washington. (Ryan Berry / The Herald)
How Snohomish County property owners can prepare for wildfire season

Clean your roofs, gutters and flammable material while completing a 5-foot-buffer around your house.

Nedra Vranish, left, and Karen Thordarson, right browse colorful glass flowers at Fuse4U during Sorticulture on Friday, June 7, 2024, in Everett, Washington. (Olivia Vanni / The Herald)
Everett’s Sorticulture festival starts Friday

Festivities will include art classes, garden vendors and live music.

Madison Family Shelter Family Support Specialist Dan Blizard talks about one of the pallet homes on Monday, May 19, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Madison Family Shelter reopens after hiatus

The Pallet shelter village, formerly Faith Family Village, provides housing for up to eight families for 90 days.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.