People walk along a newly constructed bridge at the Big Four Ice Caves hike along the Mountain Loop Highway in Snohomish County, Washington on Wednesday, July 19, 2023. (Annie Barker / The Herald)

People walk along a newly constructed bridge at the Big Four Ice Caves hike along the Mountain Loop Highway in Snohomish County, Washington on Wednesday, July 19, 2023. (Annie Barker / The Herald)

Bigger, better Big Four bridge connects hikers to majestic ice caves

The Great American Outdoors Act covered the cost of a new bridge at the historic site along the Mountain Loop Highway.

VERLOT — On a warm July day, cold wind rushed down the face of Big Four Mountain and over the picturesque ice caves that give the trail its name.

It’s common for hundreds of people to trek the 1.1-mile to the caves, where pockets of air melt out in the summer beneath the ice — the lowest-elevation glacier in the United States outside of Alaska.

Going inside is strictly forbidden.

A memorial sits at the terminus, a reminder that falling ice or rocks can kill.

A closed road at the Heather Lake Trail parking lot along the Mountain Loop Highway in Snohomish County, Washington on Wednesday, July 19, 2023. (Annie Barker / The Herald)

A closed road at the Heather Lake Trail parking lot along the Mountain Loop Highway in Snohomish County, Washington on Wednesday, July 19, 2023. (Annie Barker / The Herald)

The caves can be safely enjoyed from a distance.

This year, visitors will find a little easier path to the iconic site in the Mt. Baker-Snoqualmie National Forest. A new boardwalk and bridge crossing the South Fork Stillaguamish River, about 25 miles east of Granite Falls, is the latest project completed in the forest.

More than 60,000 people a year cross the bridge, the U.S. Forest Service said. With closures at other popular sites in the forest, including Mt. Pilchuck Road, the trails that remain open will likely see more foot traffic.

Mountain Loop Highway opened July 15, a sign that hiking season is in full swing in Snohomish County.

On the Big Four trail, past bridges and boardwalks have been in a long, slow war with nature: erosion, swollen streams and snow have taken a toll. One Forest Service bridge across the south fork of the Stilly was built in 1996, removed in 2006 due to ground erosion and then reinstalled in 2009. A decade later, in 2019, part of the footbridge was removed again.

People explore at the Big Four Ice Caves along the Mountain Loop Highway in Snohomish County, Washington on Wednesday, July 19, 2023. (Annie Barker / The Herald)

People explore at the Big Four Ice Caves along the Mountain Loop Highway in Snohomish County, Washington on Wednesday, July 19, 2023. (Annie Barker / The Herald)

In the meantime, anyone trying to hike to the caves needed to ford the river.

“Accessibility is the key to getting more people out,” said Jeff Clark, a spokesperson with Mt. Baker-Snoqualmie National Forest. This allows not just more people, but even people that maybe aren’t as mobile, that they still have the ability to enjoy these spaces.”

The parking lot sits across from a stone fireplace, the only reminder of a historic inn built in 1921. It burned to the ground in 1949 and was not rebuilt.

Wooden boardwalks, flat trails and the bridge lead to the caves. The project extended the bridge to a total length of 261 feet. The boardwalk still has that fresh lumber smell.

“The bridge has been extended to reduce future risk of erosion,” Lucas Silvis, a civil engineer with the Forest Service, said in a press release. “The longer bridge pushes back an additional 40 feet from the riverbank set in a more stable location.”

The ice caves are formed as avalanches scour down a chute along the mountain. The boulder field approaching the cave is always dangerous, as rocks can roll down the mountain at any time — in 2010, a girl died 20 feet from the caves.

In 2015, the area was closed when two people died and several others were injured in a cave collapse. It later reopened with improved signage. Emergency personnel train for mass-casualty events at the caves.

On its Big Four website, the Forest Service advises hikers to stay on the marked trail, though well worn paths to the caves dot the approach to the boulder field. At the end of the trail, snow and ice fan out from a rocky outcrop, and the walls drip incessantly in the heat.

Hikers enter the Heather Lake Trail along the Mountain Loop Highway in Snohomish County, Washington on Wednesday, July 19, 2023. (Annie Barker / The Herald)

Hikers enter the Heather Lake Trail along the Mountain Loop Highway in Snohomish County, Washington on Wednesday, July 19, 2023. (Annie Barker / The Herald)

No trees stand in the clearing, just small scattered shrubs, a reminder of just how weighty the snow and ice become when winter approaches.

Money for the bridge came from the federal Great American Outdoors Act, which brought new funding to both the U.S. National Parks Service and Forest Service. The Big Four bridge cost $241,000 and was contracted to One Corner Construction, an Idaho-based company.

The bridge project was folded into a larger undertaking — the Mountain Loop Highway Corridor Enhancement — which funded nearly $1 million in Forest Service projects along the route.

National Parks gobbled up 70% of the Great American Outdoors Act, but national forests across the country received 15% of the money. Much of that is going to overdue projects, or what is referred to as “deferred maintenance.”

People explore at the Big Four Ice Caves along the Mountain Loop Highway in Snohomish County, Washington on Wednesday, July 19, 2023. (Annie Barker / The Herald)

People explore at the Big Four Ice Caves along the Mountain Loop Highway in Snohomish County, Washington on Wednesday, July 19, 2023. (Annie Barker / The Herald)

Mt. Baker-Snoqualmie has been approved for $7 million in money from the legislation to complete projects such as Big Four. Five local projects are funded through the legislation, while $6 million of that is earmarked for maintenance on 38 roads, 16 trails and six developed recreational sites.

“We’ve had tons of deferred maintenance projects, all land managers do, and to get these done is huge,” Clark said.

Roads got 63% of the new funding stream for Mt. Baker-Snoqualmie. Trails got 27% and recreational sites received the remaining 10%.

Nationally, $767.8 million has been OK’ed for Great American Outdoors Act projects. The total number of projects is nearly 1,000. According to the Forest Service, all of the Mt. Baker-Snoqualmie projects are currently in progress.

Water drips from the Big Four Ice Caves along the Mountain Loop Highway in Snohomish County, Washington on Wednesday, July 19, 2023. (Annie Barker / The Herald)

Water drips from the Big Four Ice Caves along the Mountain Loop Highway in Snohomish County, Washington on Wednesday, July 19, 2023. (Annie Barker / The Herald)

The latest updates at Big Four were proposed in 2017, Forest Service documents show.

A new bridge replacement project was approved in 2019, but had to wait until funding became available.

“The forest service, (the Bureau of Land Management), national parks, if you visit any of those you know that they have a lot of maintenance,” Clark said. “And not a lot of funding goes towards them.”

Jordan Hansen: 425-339-3046; jordan.hansen@heraldnet.com; Twitter: @jordyhansen.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

A sign notifying people of the new buffer zone around 41st Street in Everett on Wednesday, Jan. 7. (Will Geschke / The Herald)
Everett adds fifth ‘no sit, no lie’ buffer zone at 41st Street

The city implemented the zone in mid-December, soon after the city council extended a law allowing it to create the zones.

Logo for news use featuring the Tulalip Indian Reservation in Snohomish County, Washington. 220118
Teens accused of brutal attack on Tulalip man Monday

The man’s family says they are in disbelief after two teenagers allegedly assaulted the 63-year-old while he was starting work.

A view of the Eastview development looking south along 79th Avenue where mud and water runoff flowed due to rain on Oct. 16, 2025 in Snohomish, Washington. (Olivia Vanni / The Herald)
Eastview Village critics seek appeal to overturn county’s decision

Petitioners, including two former county employees, are concerned the 144-acre project will cause unexamined consequences for unincorporated Snohomish County.

Snohomish County commuters: Get ready for more I-5 construction

Lanes will be reduced along northbound I-5 in Seattle throughout most of 2026 as WSDOT continues work on needed repairs to an aging bridge.

Logo for news use featuring the municipality of Snohomish in Snohomish County, Washington. 220118
Snohomish man held on bail for email threat against Gov. Ferguson, AG Brown

A district court pro tem judge, Kim McClay, set bail at $200,000 Monday after finding “substantial danger” that the suspect would act violently if released.

Kathy Johnson walks through vegetation growing along a CERCLA road in the Mt. Baker-Snoqualmie National Forest on Thursday, July 10, 2025 in Granite Falls, Washington. (Olivia Vanni / The Herald)
Activism groups to host forest defense meeting in Bothell

The League of Women Voters of Snohomish County and the Pacific Northwest Forest Climate Alliance will discuss efforts to protect public lands in Washington.

Debris shows the highest level the Snohomish River has reached on a flood level marker located along the base of the Todo Mexico building on First Street on Friday, Dec. 12, 2025 in Snohomish, Washington. (Olivia Vanni / The Herald)
SnoCo offers programs to assist in flood mitigation and recovery

Property owners in Snohomish County living in places affected by… Continue reading

x
Delay on Critical Areas Ordinance update draws criticism from groups

Edmonds is considering delaying updates to a section of the ordinance that would restrict stormwater wells near its drinking water aquifer.

Logo for news use featuring Snohomish County, Washington. 220118
Providence Swedish welcomes first babies of 2026 in Everett, Edmonds

Leinel Enrique Aguirre was the first baby born in the county on Thursday in Everett at 5:17 a.m. He weighed 7.3 pounds and measured 20 inches long.

Marysville house fire on New Year’s Day displaces family of five

Early Thursday morning, fire crews responded to reports of flames engulfing the home. One firefighter sustained minor injuries.

Floodwater from the Snohomish River partially covers a flood water sign along Lincoln Avenue on Thursday, Dec. 11, 2025 in Snohomish, Washington. (Olivia Vanni / The Herald)
Images from the flooding in Snohomish County.

Our photographers have spent this week documenting the flooding in… Continue reading

The Optum Everett Campus on Tuesday, Aug. 27, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
In Snohomish County, new year brings changes to health insurance

A contract termination between Optum and Humana, as well as the expiration of enhanced tax credits for people covered by Affordable Care Act, went into effect Jan. 1.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.