Workers walk past a Boeing 737 MAX 8 TUI fly airplane being built for TUI Group at Renton Municipal Airport next to Boeing’s assembly facility in Renton on Friday. (AP Photo/Ted S. Warren)

Workers walk past a Boeing 737 MAX 8 TUI fly airplane being built for TUI Group at Renton Municipal Airport next to Boeing’s assembly facility in Renton on Friday. (AP Photo/Ted S. Warren)

FAA could clear Boeing 737 MAX to fly again within weeks

Airlines would still need weeks to get their planes ready and their pilots trained.

By Dominic Gates / The Seattle Times

The Federal Aviation Administration (FAA) could clear Boeing’s 737 MAX to fly again by late next month or early June, according to a person familiar with the safety agency’s latest thinking.

If the FAA gives the green light that soon — much more quickly than many analysts have predicted — airlines would still need weeks to get their planes ready and their pilots trained. But the timetable, which assumes no unforeseen developments, means U.S. carriers could have the MAX flying passengers again by early August.

That anticipated fast-track timeline was confirmed by a second person close to the discussions.

And Steve Udvar-Hazy, executive chairman of Air Lease Corp. and a leading figure in the aviation world, said he has heard a similar tentative schedule in conversations with Boeing.

The FAA has called a crucial meeting of the heads of civil-aviation authorities from around the world for May 23, where the U.S. regulatory agency is expected to outline its finalized safety analysis in an attempt to foster international consensus.

Unless some new issues are discovered, the FAA anticipates telling the assembled foreign regulators that it’s “in a position to clear the aircraft for service sometime in the near vicinity of that meeting,” potentially as early as a week later, said the person familiar with FAA’s latest thinking.

Udvar-Hazy, who talked with Boeing Commercial Airplanes chief Kevin McAllister on Friday, said Boeing has target dates but nothing firm yet. To get the international consensus Boeing would like, he said, the FAA needs to convince the other regulators that it has done everything needed to validate the MAX’s safety.

“That’s tough,” he said “The burden will be on the FAA and Boeing to demonstrate by May 23 that they have everything under control.”

Getting approval for the MAX to fly by early June would be faster than many analysts have estimated. After Boeing’s earnings teleconference Thursday, Vertical Research analyst Rob Stallard told investors that a six-month grounding seemed likely.

The FAA clearance would certify a software fix Boeing has devised for the new flight-control system on the MAX — known as Maneuvering Characteristics Augmentation System (MCAS) — that’s been implicated in the two recent fatal crashes that killed 346 people. Simultaneously, the agency will mandate pilot training to fully brief flight crews on the updated system and on how to deal with any potential failures.

The planes have been grounded worldwide since March 13. Swift progress will be needed between now and the May 23 meeting.

On April 17, Boeing Chairman and Chief Executive Dennis Muilenburg said the company had completed 135 test flights with the new software installed, adding that the next flight would be the MCAS certification flight.

That flight — in which FAA test pilots put the plane through its paces and test various failure modes and extreme flight conditions — still hasn’t happened, but Udvar-Hazy said Boeing hopes to fly it sometime next week.

The person familiar with the FAA’s thinking said that once that’s completed, “there’s some optimism that the certification process can then happen in a fairly timely manner.”

While Boeing and the FAA believe that a worldwide consensus among aviation authorities would substantially bolster public confidence in the safety of the MAX, they may not wait long if international agreement is too slow to emerge.

The person familiar with the FAA’s view said that once the certification process has been checked and FAA technical staff are convinced the plane is now safe, it will be difficult to justify keeping it grounded because of international political considerations.

“With 250 flights a day being canceled (in the U.S.) and the stranded capital of planes parked all over the West, there’s a recognition that every day has an economic cost,” the person said.

For the U.S. MAX operators — American, Southwest and United — FAA approval will be the trigger to begin the time-consuming logistics required before commercial flights can resume.

The airlines must first install the software update on all their MAXs.

American Airlines captain Dennis Tajer, spokesman for the airline’s pilot union, the Allied Pilots Association (APA), said Boeing has told him that it will take about a week to do that for the 24 MAXs in American’s fleet.

Then planes that have been stored for weeks, many of them in desert airfields, will have to undergo routine maintenance before flying, including oiling and running up the engines, rotating the wheels, and cycling the hydraulic systems, which could take another week.

The next step, completing the pilot training, will take much longer, given the complexity of pilot schedules.

Tajer said American will almost certainly put all of its more than 4,000 Boeing 737 pilots through the additional training before it allows any of them to fly a MAX. American has drafted a supplemental training document about MCAS more than 20 pages long, he said.

The airline would not want some crews trained and others not, he said. That’s because if at the last minute before a flight, an older 737 model had to be swapped out for a MAX due to some maintenance problem, the airline would need the assigned crew trained and ready to go.

Advertising

While tracking that pilot training, the airlines will also have to update their flight and maintenance manuals.

Only after all that is done will they be able to look at their route networks and schedules and begin to open up seats on MAXs in their reservation systems.

Southwest Airlines spokeswoman Brandy King said that “as of now, incorporating the MAX into our published schedule would not happen before Aug. 5.”

“We have revised our schedule through the summer and will limit the MAX to be utilized as spares if all steps are completed prior to Aug. 5,” she said.

American has extended its cancellations for the MAX through Aug. 19. On Friday, American Airlines chief Doug Parker said in a quarterly earnings teleconference that, assuming its planes are back in service then, the company estimates the MAX grounding will have cost the airline $350 million.

Tajer said his union will push for a robust training program mandated for pilots worldwide, and it hopes that the process can be deliberate and transparent enough to create a consensus across the globe that the mandated safety measures are adequate.

“The pilot community is global. We don’t expect to be flying this plane alone,” he said. “I don’t want to be sitting in an interview discussing why we are flying the MAX and pilots worldwide are not.”

“We have to get it done right,” Tajer said.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Business

Trade group bus tour makes two stops in Everett

The tour aimed to highlight the contributions of Washington manufacturers.

Downtown Everett lumberyard closes after 75 years

Downtown Everett lumber yard to close after 75 years.

Paper covers the windows and doors of a recently closed Starbucks at the corner of Highway 99 and 220th Street SW on Oct. 1, 2025 in Edmonds, Washington. (Olivia Vanni / The Herald)
Starbucks shutters at least six locations in Snohomish County

The closures in Lynnwood, Edmonds, Mill Creek and Bothell come as Starbucks CEO Brian Niccol attempts to reverse declining sales.

Keesha Laws, right, with mom and co-owner Tana Baumler, left, behind the bar top inside The Maltby Cafe on Sept. 29, 2025 in Snohomish, Washington. (Olivia Vanni / The Herald)
A change in ownership won’t change The Maltby Cafe

The new co-owner says she will stick with what has been a winning formula.

Holly Burkett-Pohland inside her store Burketts on Sept. 24, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Burkett’s survives in downtown thanks to regular customers

Unique clothing and gift store enters 48th year in Everett.

A person walks past the freshly painted exterior of the Everett Historic Theatre on Sept. 24, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Historic Everett Theatre reopens with a new look and a new owner

After a three-month closure, the venue’s new owner aims to keep the building as a cultural hub for Everett.

Everett businesses join forces to promote downtown nightlife

A group of downtown businesses will host monthly events as a way to bring more people to the city’s core during late nights.

Former barista claims Starbucks violated Everett law

The part-time worker wanted more hours, but other workers were hired instead, the lawsuit alleges.

Cierra Felder (left to right), Aaron Sheckler and Scott Hulme  inside Petrikor on Thursday, July 31, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Everett store sells unique home furnishings

Petrikor aims to sell unique merchandise.

Water drips from an Alaska Airlines Boeing 737 after it received a water salute while becoming the first scheduled 737 arrival Thursday, Feb. 17, 2022, at Paine Field Airport in Everett, Washington. (Ryan Berry / The Herald)
Alaska Airlines travelers will need to choose an option to earn frequent flier points

Earning Alaska Airlines points will now involve strategy.

The Sana Biotechnology building on Tuesday, Aug. 19, 2025 in Bothell, Washington. (Olivia Vanni / The Herald)
Bothell loses planned biotechnology manufacturing plant

New biotechnology manufacturing jobs in Bothell are on indefinite hold.

Customers walk in and out of Fred Meyer along Evergreen Way on Monday, Oct. 31, 2022 in Everett, Washington. (Olivia Vanni / The Herald)
Everett council rebukes Kroger for plans to close Fred Meyer store

In the resolution approved by 6-1 vote, the Everett City Council referred to store closure as “corporate neglect.”

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.