One of the 214-foot port cranes is off loaded at the South Terminal at the Port of Everett on Friday afternoon. (Kevin Clark / The Herald)

One of the 214-foot port cranes is off loaded at the South Terminal at the Port of Everett on Friday afternoon. (Kevin Clark / The Herald)

First of two big, new cranes is unloaded at Port of Everett

They are bigger than the existing duo nearby and can accommodate wider ships and heavier cargo.

EVERETT — The Port of Everett, ever so slowly, began moving a massive crane Friday afternoon from the barge on which it sailed in to the port’s South Terminal dock. The 500-foot move was expected to take from three to six hours, even slower than the local rush hour crawl.

Everett-based Nordholm, a heavy equipment mover, brought a team of workers and 42 super-sized dollies to gently lift the crane from its berth and move it a 10th of a mile up the dock.

Each dolly has eight pickup-truck-sized wheels and an independent hydraulic system. The entire apparatus is powered by two diesel engines.

The two cargo cranes are to be installed at the South Terminal later this year.

At 214 feet, the new cargo cranes are about 20 feet taller than the existing duo at Pacific Terminal, and their movable booms are 40 feet longer.

That greater reach will allow the new cranes to load and unload cargo on wider ships and provide greater lift capacity, said Catherine Soper, Port of Everett spokeswoman.

Each new crane has a 50-long-ton lift capacity (a long ton is 2,240 pounds), while the cranes at Pacific Terminal can heft 40 long tons.

“In this case, bigger is necessary to keep our region competitive,” Soper said.

The increase in height, reach and lift positions the seaport to more efficiently handle heavier cargo, including oversized containers carrying parts for the new Boeing 777X. The port can accept 777X components now, but not efficiently, Soper said.

Larger ships carrying those components can tie up, but they jut out into the waterway. And their cargo sometimes is near the weight limit for existing cranes, she said.

Crews work to move one of the newly arrived 214-foot port cranes at the South Terminal at the Port of Everett on Friday afternoon. (Kevin Clark / The Herald)

Crews work to move one of the newly arrived 214-foot port cranes at the South Terminal at the Port of Everett on Friday afternoon. (Kevin Clark / The Herald)

The second crane is expected to be offloaded Sunday.

Both will be stored upland at the dock for a few months. They won’t be installed until a $37 million project to upgrade the South Terminal dock is completed this December. That work strengthens the 700-foot dock so it can better accommodate the larger ships and heavier cargo.

The South Terminal is the largest of the port’s docks by footprint, but it is not strong enough for modern cargo operations, Soper said. “When it is strengthened, the wharf — paired with the two cranes — will bring the dock back into full use to support trade and jobs,” Soper said.

The port purchased the two cranes as surplus from EverPort Terminal, a firm that operates a container terminal at the Port of Los Angeles.

They cost $1 each, but barging them from L.A. to Everett cost more than $5 million, the Port of Everett said.

Each crane weighs about 2.4 million pounds — more than an oil rig.

They arrived at the port this week after being barged from Los Angeles.

Janice Podsada; jpodsada@heraldnet.com; 425-339-3097; Twitter: JanicePods

Pacific Terminal Cranes:

Height: 197 feet from dock to apex

Gauge (distance between the crane rails): 50 feet

Boom length: 275 feet

Lift capacity: 40 long tons each

New South Terminal Cranes:

Height: 214 feet from dock to apex

Gauge (distance between the crane rails): 100 feet

Boom length: 315 feet

Lift capacity: 50 long tons each

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Business

Judi Ramsey, owner of Artisans, inside her business on Sept. 22, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Artisans PNW allows public to buy works of 100 artists

Combo coffee, art gallery, bookshop aims to build business in Everett.

Helion's 6th fusion prototype, Trenta, on display on Tuesday, July 9, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Everett-based Helion receives approval to build fusion power plant

The plant is to be based in Chelan County and will power Microsoft data centers.

The Port of Everett’s new Director of Seaport Operations Tim Ryker on Oct. 14, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Port of Everett names new chief of seaport operations

Tim Ryker replaced longtime Chief Operating Officer Carl Wollebek, who retired.

The Lynnwood City Council listens to a presentation on the development plan for the Lynnwood Event Center during a city council meeting on Oct. 13, 2025 in Lynnwood, Washington. (Olivia Vanni / The Herald)
Lynnwood City Council approves development of ‘The District’

The initial vision calls for a downtown hub offering a mix of retail, events, restaurants and residential options.

Customers walk in and out of Fred Meyer along Evergreen Way on Monday, Oct. 31, 2022 in Everett, Washington. (Olivia Vanni / The Herald)
Closure of Fred Meyer leads Everett to consider solutions for vacant retail properties

One proposal would penalize landlords who don’t rent to new tenants after a store closes.

Everly Finch, 7, looks inside an enclosure at the Reptile Zoo on Aug. 19, 2025 in Monroe, Washington. (Olivia Vanni / The Herald)
Monroe’s Reptile Zoo to stay open

Roadside zoo owner reverses decision to close after attendance surge.

Trade group bus tour makes two stops in Everett

The tour aimed to highlight the contributions of Washington manufacturers.

Downtown Everett lumberyard closes after 75 years

Downtown Everett lumber yard to close after 75 years.

Paper covers the windows and doors of a recently closed Starbucks at the corner of Highway 99 and 220th Street SW on Oct. 1, 2025 in Edmonds, Washington. (Olivia Vanni / The Herald)
Starbucks shutters at least six locations in Snohomish County

The closures in Lynnwood, Edmonds, Mill Creek and Bothell come as Starbucks CEO Brian Niccol attempts to reverse declining sales.

Keesha Laws, right, with mom and co-owner Tana Baumler, left, behind the bar top inside The Maltby Cafe on Sept. 29, 2025 in Snohomish, Washington. (Olivia Vanni / The Herald)
A change in ownership won’t change The Maltby Cafe

The new co-owner says she will stick with what has been a winning formula.

Holly Burkett-Pohland inside her store Burketts on Sept. 24, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Burkett’s survives in downtown thanks to regular customers

Unique clothing and gift store enters 48th year in Everett.

A person walks past the freshly painted exterior of the Everett Historic Theatre on Sept. 24, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Historic Everett Theatre reopens with a new look and a new owner

After a three-month closure, the venue’s new owner aims to keep the building as a cultural hub for Everett.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.