In this 2018 photo, United Airlines commercial jets sit at a gate at Terminal C of Newark Liberty International Airport in Newark, New Jersey. (AP Photo/Julio Cortez, File)

In this 2018 photo, United Airlines commercial jets sit at a gate at Terminal C of Newark Liberty International Airport in Newark, New Jersey. (AP Photo/Julio Cortez, File)

United removes Boeing Max from schedule until mid-December

The plan reduces United’s risk of alienating customers by canceling flights close to departure.

By David Koenig / Associated Press

United Airlines is again delaying the expected return date for its grounded Boeing 737 Max jets.

The airline said Friday that it has removed the Max from its schedule until Dec. 19, six weeks longer than previously planned.

United owns 14 Max jets, which have been grounded since March after the second of two accidents that together killed 346 people.

Taking the Max out of the schedule reduces United’s risk of alienating customers by canceling flights close to departure if the plane does not return to service as quickly as Boeing hopes.

United’s announcement means it could be flying the Max during the week before Christmas — a period when heavy travel and bad weather can snarl airline operations. By contrast, Southwest Airlines is delaying its earliest possible use of the plane until early January.

Robert Mann, an aviation consultant and former airline executive, said United’s timing is possible if computer-based training for pilots and some “confidence-inspiring” demonstration flights can be wrapped up in November.

With each passing month, the loss of the Max results in more flights being dropped from United’s schedule — from 70 a day in September to 96 a day for most of December — because it’s not getting any new deliveries either.

United expected to have 27 Max jets by the end of September and 30 by the end of the year. The Chicago-based carrier has nearly 800 planes in its fleet.

Airlines haven’t been able to quickly replace the missing planes, so they are cutting back on growth — or in the case of Southwest, actually shrinking.

Boeing is working to fix flight-control software implicated in crashes off the coast of Indonesia and in Ethiopia and solve another problem that Federal Aviation Administration test pilots discovered in June.

The company has shown its changes to FAA over the past several months and expects to formally submit a recertification package in September. CEO Dennis Muilenburg predicted last month that the plane will return to service early in the fourth quarter.

Boeing’s 737 assembly plant near Seattle is still running but at a slower rate, and completed jets are going into storage. A Boeing spokesman said Friday that the company believes it can gradually increase 737 production from 42 a month now to 57 a month next year.

Separately, the FAA said Friday that a committee of international aviation experts will need more time to complete its review of how the agency certifies planes. The group faced a deadline Friday, but FAA said it now expects to wrap up “in the coming weeks.”

The panel is looking into FAA’s original approval of the Max and its use of designated employees at aircraft manufacturers like Boeing to evaluate some aircraft parts. Some lawmakers and safety advocates have criticized that approach and questioned whether FAA understood software that was new on the Max.

The panel’s members represent nine aviation authorities including those of Europe, China and Canada, and is led by a former chairman of the U.S. National Transportation Safety Board. Its review is separate from FAA’s decision about when the Max is safe to fly again.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Business

Customers walk in and out of Fred Meyer along Evergreen Way on Monday, Oct. 31, 2022 in Everett, Washington. (Olivia Vanni / The Herald)
Everett council rebukes Kroger for plans to close Fred Meyer store

In the resolution approved by 6-1 vote, the Everett City Council referred to store closure as “corporate neglect.”

Inside the passenger terminal at Paine Field Airport on Wednesday, Sept. 3, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Post names Paine Field as one of the best U.S. airports

Reporters analyzed 2024 data from 450 airports, including wait times to get through TSA security and ease of getting to the airport.

A semi truck and a unicycler move along two sections of Marine View Drive and Port Gardner Landing that will be closed due to bulkhead construction on Wednesday, Sept. 3, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Port of Everett set to begin final phase of bulkhead work, wharf rebuild

The $6.75 million project will reduce southbound lanes on West Marine View Drive and is expected to last until May 2026.

Customers walk in and out of Fred Meyer along Evergreen Way on Monday, Oct. 31, 2022 in Everett, Washington. (Olivia Vanni / The Herald)
Kroger said theft a reason for Everett Fred Meyer closure. Numbers say differently.

Statistics from Everett Police Department show shoplifting cut in half from 2023 to 2024.

Funko headquarters in downtown Everett. (Sue Misao / Herald file)
FUNKO taps Netflix executive to lead company

FUNKO’s new CEO comes from Netflix

Inside El Sid, where the cocktail bar will also serve as a coffee house during the day on Tuesday, Aug. 12, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
New upscale bar El Sid opens in APEX complex

Upscale bar is latest venue to open in APEX Everett.

A Boeing 737 Max 10 prepares to take off in Seattle on June 18, 2021. MUST CREDIT: Bloomberg photo by Chona Kasinger.
When Boeing expects to start production of 737 MAX 10 plane in Everett

Boeing CEO says latest timeline depends on expected FAA certification of the plane in 2026.

Kongsberg Director of Government Relations Jake Tobin talks to Rep. Rick Larsen about the HUGIN Edge on Thursday, July 31, 2025 in Lynnwood, Washington. (Olivia Vanni / The Herald)
Norwegian underwater vehicle company expands to Lynnwood

Kongsberg Discovery will start manufacturing autonomous underwater vehicles in 2026 out of its U.S. headquarters in Lynnwood.

Logo for news use featuring the municipality of Snohomish in Snohomish County, Washington. 220118
Garbage strike over for now in Lynnwood, Edmonds and Snohomish

Union leaders say strike could return if “fair” negotiations do not happen.

Richard Wong, center, the 777-X wing engineering senior manager, cheers as the first hole is drilled in the 777-8 Freighter wing spar on Monday, July 21, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Boeing starts production of first 777X Freighter

The drilling of a hole in Everett starts a new chapter at Boeing.

Eisley Lewis, 9, demonstrates a basic stitch with her lavender sewing machine on Wednesday, Aug. 27, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Everett fourth grader stitches summer boredom into business

Rice bags, tote bags and entrepreneurial grit made Eisley Lewis, 9, proud of herself and $400.

Isaac Peterson, owner of the Reptile Zoo, outside of his business on Tuesday, Aug. 19, 2025 in Monroe, Washington. (Olivia Vanni / The Herald)
The Reptile Zoo, Monroe’s roadside zoo, slated to close

The Reptile Zoo has been a unique Snohomish County tourist attraction for nearly 30 years.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.