A Boeing 737 Max 9 airplane tests its engines outside of the company’s factory on March 11, 2019 in Renton, Washington. (Stephen Brashear / Getty Images / TNS, file)

A Boeing 737 Max 9 airplane tests its engines outside of the company’s factory on March 11, 2019 in Renton, Washington. (Stephen Brashear / Getty Images / TNS, file)

Boeing lost track of up to 400 faulty 737 Max parts, whistleblower says

The claims were detailed in a Boeing inspector’s complaint on June 11 and made public by a Senate subcommittee on Tuesday.

By Allyson Versprille and Julie Johnsson / Bloomberg

A Boeing Co. quality inspector alleged the planemaker mishandled and lost track of hundreds of faulty parts, some of which he said may have been installed on new 737 Max planes, the latest revelation by a whistleblower pointing out possible misconduct at the manufacturer.

The claims were detailed in a June 11 complaint by Boeing inspector Sam Mohawk with the Occupational Safety and Health Administration and were made public by a US Senate subcommittee on Tuesday in a memo to members. Boeing said it’s reviewing the claims after receiving the document late Monday.

As of last year, Boeing had lost as many as 400 faulty 737 Max aircraft parts and deleted records for many of those from an internal cataloging system, according to the complaint. So-called non-conforming parts are damaged or inadequate components that are supposed to be tracked, disposed of or repaired, with meticulous records to ensure they aren’t used in the aircraft manufacturing process.

Mohawk also claimed Boeing “intentionally hid” improperly stored non-conforming parts – including large components such as rudders and flaps – from the Federal Aviation Administration ahead of an on-site inspection.

The allegations, which hadn’t previously been made public, add to a series of other whistleblower claims alleging the company has cut corners in its production and quality processes. Some whistleblowers have said they were encouraged to keep silent or were retaliated against for raising concerns.

“We continuously encourage employees to report all concerns as our priority is to ensure the safety of our airplanes and the flying public,” Boeing said in a statement.

Mohawk’s complaint was released by the Senate’s Permanent Subcommittee on Investigations on the same day that it plans to hear testimony from Boeing CEO Dave Calhoun, providing fresh lines of inquiry to pursue the embattled leader. The panel opened a probe into the planemaker following a near-catastrophe in January, when a fuselage panel blew off a 737 Max blew shortly after takeoff.

Documents and whistleblower accounts collected by the panel thus far “paint a troubling picture of a company that prioritizes speed of manufacturing and cutting costs over ensuring the quality and safety of aircraft,” staff from the panel said in a memo to members.

The FAA said in a statement late Monday that it has encouraged Boeing employees to come forward with their safety concerns and has seen an uptick in reports since Jan. 5 as a result. The agency disclosed last week that it received more than 11 times as many Boeing whistleblower reports in the first five months of this year compared to all of 2023.

“The FAA strongly encourages anyone with safety concerns to report them,” the agency said. “We thoroughly investigate every report, including allegations uncovered in the Senate’s work.”

The fresh claims deepen the pressure that Boeing faces from Washington. The company is under investigation by multiple federal agencies including the Justice Department. Prosecutors are also weighing whether to charge Boeing after it found the planemaker violated a deal allowing the company to avoid charges following two fatal 737 Max crashes in 2018 and 2019.

Mohawk claimed that dozens of defective 737 components were being improperly stored outdoors and that Boeing ordered employees to move the majority of them to another location after receiving a notice from the FAA in June 2023 that the agency would be conducting an on-site inspection. He claims the parts were eventually moved back to the outside location or lost completely.

According to the subcommittee’s memo, non-conforming parts at Boeing are supposed to be marked with a red tag or red paint and held in a secure area of the factory.

The demands on Mohawk’s job monitoring those parts surged after the 737 Max’s worldwide grounding triggered by the two deadly crashes. Mohawk alleged “the overwhelming number of nonconforming parts eventually led his superiors to direct him and others to eliminate or ‘cancel’ the records that designate a part as nonconforming,” according to the memo.

“Boeing needs to stop thinking about the next earnings call and start thinking about the next generation,” Senator Richard Blumenthal, the Connecticut Democrat who chairs the panel, plans to say at the hearing, according to excerpts of his prepared remarks.

Mohawk claims that he tried to elevate the concerns through Boeing’s internal reporting program called “Speak Up,” but that the report was eventually routed to the same managers he had complained about.

The concerns raised by Mohawk bear similarities to allegations previously raised by the late Boeing whistleblower John Barnett about the production of one of the company’s other flagship aircraft, the 787 Dreamliner. Police concluded in May that Barnett’s death, which occurred amid ongoing litigation with the planemaker, was the result of suicide. Barnett had worked in Boeing’s Everett factory before moving to South Carolina.

At a previous hearing under Blumenthal in April, Boeing engineer Sam Salehpour, of Everett, also alleged that the company had incorrectly assembled the barrel sections of its 787 model to save time and money, an accusation the company has refuted.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Five Snohomish County men named in drug and gun trafficking indictments

On Tuesday, federal and local law enforcement arrested 10 individuals in connection with three interrelated drug and gun trafficking conspiracies.

Snohomish County Sheriff Susanna Johnson speaks at a press conference outside of the new Snohomish County 911 building on Wednesday, April 30, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
County sheriff working to fix $15M in overspending

In a presentation to the County Council, Sheriff Johnson said she’s reducing overtime hours and working to boost revenue with a new 0.1% sales tax.

A Sound Transit bus at it's new stop in the shadow of the newly opened Northgate Lightrail Station in Seattle. (Kevin Clark / The Herald)
Sound Transit may add overnight bus service between Everett, Seattle

The regional transit agency is seeking feedback on the proposed service changes, set to go into effect in fall 2026.

The Edmonds School District building on Friday, Feb. 14, 2025 in Lynnwood, Washington. (Olivia Vanni / The Herald)
Mother sues Edmonds School District after her son’s fingertip was allegedly severed

The complaint alleges the boy’s special education teacher at Cedar Way Elementary closed the door on his finger in 2023.

Pedal-free electric bikes are considered motorcycles under Washington State law (Black Press Media file photo)
Stanwood Police: Pedal-free e-bikes are motorcycles

Unlike electric-assisted bikes, they need to be registered and operated by a properly endorsed driver.

The aftermath of a vandalism incident to the Irwin family's "skeleton army" display outside their Everett, Washington home. (Paul Irwin)
Despite vandalism spree, Everett light display owners vow to press on

Four attacks since September have taken a toll on Everett family’s Halloween and Christmas cheer.

Students, teachers, parents and first responders mill about during a pancake breakfast at Lowell Elementary School in 2023 in Everett. If approved, a proposed bond would pay for a complete replacement of Lowell Elementary as well as several other projects across the district. (Ryan Berry / The Herald)
Everett school board sends bond, levy measures to Feb. ballot

The $400 million bond would pay for a new school and building upgrades, while the levy would pay for locally funded expenses like extra-curriculars and athletics.

Edgewater Bridge construction workers talk as demolition continues on the bridge on Friday, May 9, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Edgewater Bridge construction may impact parking on Everett street

As construction crews bring in large concrete beams necessary for construction, trucks could impact parking and slow traffic along Glenwood Avenue.

Customers walk in and out of Fred Meyer along Evergreen Way on Monday, Oct. 31, 2022 in Everett, Washington. (Olivia Vanni / The Herald)
Closure of Fred Meyer leads Everett to consider solutions for vacant retail properties

One proposal would penalize landlords who don’t rent to new tenants after a store closes.

People leave notes on farmers market concept photos during an informational open house held at the Northwest Stream Center on Oct. 9, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Snohomish County presents plans for Food and Farming Center

The future center will reside in McCollum Park and provide instrumental resources for local farmers to process, package and sell products.

People walk through Explorer Middle School’s new gymnasium during an open house on Oct. 7, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Everett middle school celebrates opening of new gym

The celebration came as the Mukilteo School District seeks the approval of another bond measure to finish rebuilding Explorer Middle School.

Daily Herald moves to new office near downtown Everett

The move came after the publication spent 12 years located in an office complex on 41st Street.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.