Traffic moving again on I-5 bridge over Skagit River

MOUNT VERNON — Traffic moved steadily across the temporary fix to the I-5 bridge over the Skagit River early Wednesday morning, bringing relief to business owners and people who live in the area.

Less than a month after a span of the bridge collapsed and dumped three people into the cold river, crews reopened the bridge. The two southbound lanes opened about 4:40 a.m. and the northbound lanes opened about 5:50 a.m.

State troopers were on hand to enforce the 40 mph speed limit and the ban on big rigs with oversized loads.

ADVERTISEMENT
0 seconds of 0 secondsVolume 0%
Press shift question mark to access a list of keyboard shortcuts
00:00
00:00
00:00
 

Detours signs in Mount Vernon and Burlington were still up at mid-morning, but traffic on city streets around the bridge was moving well and without the congestion common during the I-5 bridge closure, which collapsed May 23.

At North Cove Coffee in Burlington on Wednesday morning, barista Rhaelynn Givens said all her regular customers were showing up.

“I’m happy that it feels like a normal day here,” she said.

Jason Becktel who lives on the main detour route, also was pleased.

“I’ve been trying not to go into Mount Vernon. I couldn’t even take a left into my driveway. The bridge opening is friggin’ awesome,” he said. “I’m way happy. I took me 45 minutes to go to the grocery store. That traffic just sucked.”

At Riverside Health Club in Mount Vernon, club owner Denise Skelton said she is relieved to have the bridge open for the summer.

“Despite the bad traffic, I think most people in Skagit County had a positive attitude,” Skelton said. “It was amazing that the state got the bridge open as fast as they did. We are all very thankful.”

During the detour around the bridge, small shops along the route saw a big drop in business, said Lisa Ley at Darren’s Donuts in Mount Vernon.

“We started making a lot fewer doughnuts when we noticed that by late morning we were essentially done for the day,” Ley said. “Drivers didn’t want to lose their places in line on the street, so they stopped coming by.”

Micah Lewis, manager at Foothills Toyota in Burlington said the bridge closure made a dent in car sales and made it tough for his staff to even run out for a sandwich at lunchtime.

“We already are seeing more traffic at the dealership today,” Lewis said.

Lori Lehto of Oak Harbor drove over the bridge about 8 a.m. Wednesday on an errand for her office in Mount Vernon.

“I held my breath and gripped the steering wheel,” Lehto said. “But I also wished that some of the construction workers were still there so I could have waved at them to show my thanks.”

Max J. Kuney Construction of Spokane has been awarded the $6.9 million contract to build the permanent replacement span on the bridge. The contractor is expected to begin work this week and have the finished section ready for installation after Labor Day weekend, said state Department of Transportation spokesman Bart Treece.

“We worked hard to get people moving safely and efficiently,” Treece said. “We believe the next closure in September will be for less than two weeks. We’re at halftime now, but there is a lot more work to do.”

Since the I-5 is an interstate freeway, federal funds covered the cost of the temporary fix and will cover about 90 percent of the permanent repair.

Along with the 40 mph speed limit, drivers should be aware that each direction of the temporary span is narrower, and has been reduced from two 12-foot lanes with 3-foot shoulders, to two 11-foot lanes with 1-foot shoulders, the state Department of Transportation said in a press release. Freight haulers carrying legal loads won’t be detoured off I-5, but oversized or overweight loads must exit and use the marked detour route.

Information about driving conditions and the ongoing project is available at www.wsdot.wa.gov/Projects/I5/SkagitRiverBridgeReplacement. People without computer access can call 511.

Gale Fiege: 425-339-3427; gfiege@heraldnet.com.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Cars drive along Cathcart Way next to the site of the proposed Eastview Village development that borders Little Cedars Elementary on Wednesday, May 7, 2025 in unincorporated Snohomish, Washington. (Olivia Vanni / The Herald)
Former engineer: Snohomish County rushed plans for Eastview development

David Irwin cited red flags from the developers. After he resigned, the county approved the development that’s now stalled with an appeal

Outside of the Madrona School on Monday, Aug. 26, 2024 in Edmonds, Washington. (Olivia Vanni / The Herald)
Sewer district notifies Edmonds schools of intent to sue

The letter of intent alleges the school district has failed to address long-standing “water pollution issues” at Madrona K-8 School.

Everett
Man stabbed in face outside Everett IHOP, may lose eye

Police say the suspect fled in the victim’s car, leading officers on a 6-mile chase before his arrest.

A person walks up 20th Street Southeast to look at the damage that closed the road on Wednesday, Nov. 20, 2024 in Lake Stevens, Washington. (Olivia Vanni / The Herald)
WA delegation urges Trump to reconsider request for bomb cyclone aid

The Washington state congressional delegation urged President Donald Trump on… Continue reading

Aaron Weinstock uses an x-ray machine toy inside the Imagine Children Museum on Tuesday, Dec. 3, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Imagine Children’s Museum $250k grant reinstated following federal court order

The federal grant supports a program that brings free science lessons to children throughout rural Snohomish County.

Snohomish County 911 Executive Director Kurt Mills talks about the improvements made in the new call center space during a tour of the building on Tuesday, May 20, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
New 911 center in Everett built to survive disaster

The $67.5 million facility brings all emergency staff under one roof with seismic upgrades, wellness features and space to expand.

Everett
Five arrested in connection with Everett toddler’s 2024 overdose death

More than a year after 13-month-old died, Everett police make arrests in overdose case.

Madison Family Shelter Family Support Specialist Dan Blizard talks about one of the pallet homes on Monday, May 19, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Madison Family Shelter reopens after hiatus

The Pallet shelter village, formerly Faith Family Village, provides housing for up to eight families for 90 days.

Searchers recover submerged shrimp boat, two bodies from Possession Sound

Everett police failed to locate a third person reported missing after the boat sank in Possession Sound on May 21.

The Everett Municipal Building on Thursday, Feb. 29, 2024 in Everett, Washington. (Annie Barker / The Herald)
Everett Municipal Building to close for two weeks

The closure is part of the building’s $36 million repair project. City staff will be accessible by phone and email during business hours.

Help Washington manage European green crabs with citizen science events

Washington State University and Washington Sea Grant will hold a training at Willis Tucker Park on June 2.

Emilee Swenson pulls kids around in a wagon at HopeWorks' child care center Tomorrow’s Hope, a job training program for people interested in child care, on Tuesday, Sept. 7, 2021 in Everett, Washington. HopeWorks is one of the organizations reciving funding from the ARPA $4.3 million stipend. (Andy Bronson / The Herald)
Early learning group presents countywide survey findings

The survey highlighted the largest issues parents and providers are facing amid the county’s child care crisis.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.