Traffic study and hearing set for proposed Walmart in Monroe

  • By Alejandro Dominguez Herald Writer
  • Monday, March 14, 2011 12:01am
  • Local NewsMonroe

MONROE — Building a Walmart store will more than double traffic in Monroe’s North Kelsey Street area, according to the city’s traffic analysis for the project.

The report estimates about 500 more vehicle trips will result on roads near the proposed big-box store during evening peak times. The area has about 200 vehicle trips during those times now.

Changes to roads and traffic signals the city has been making and others to come should keep things moving in the area, city officials said.

ADVERTISEMENT
0 seconds of 0 secondsVolume 0%
Press shift question mark to access a list of keyboard shortcuts
00:00
00:00
00:00
 

People can discuss the traffic analysis, which is part of the development agreement with the Seattle-based real estate company Sabey Corp., at this week’s City Council meeting. A public hearing is scheduled for 7 p.m. Tuesday at City Hall chambers, 806 W. Main St.

Sabey Corp. bought 24 acres on the north side of the North Kelsey territory on Dec. 14 for $7.5 million, $2 million less than a previous offer. There are plans to sell this land to Wal-Mart, which seeks to build on the site.

The council can vote Tuesday whether to accept the development agreement. The public hearing also can be extended to two more meetings but that will depend on how many people speak Tuesday, city planner Russ Wright said.

Wal-Mart has been one of the major topics at council meetings since the company announced on Dec. 22 it was planning to open a store.

Possible traffic congestion caused by the store was one reason the Monroe Preservation Action Committee, a local group formed by residents and business owners, want to limit the store’s size. The group held a rally Saturday at the corner of Kelsey and U.S. 2.

The issue is not North Kelsey, said Sam Wirsching, committee president. It is the other streets that are not equipped to deal with additional traffic.

“The question is what about the other routes that guide you out of North Kelsey?” Wirsching said.

The group plans to give a presentation at the hearing using data from public records and the state Department of Transportation.

The arrival of a Walmart store will cause the commute to slow, increase time for emergency service responses and increase congestion.

“Those intersections cannot handle it,” Wirsching said.

City officials disagree.

According to city officials, a Walmart store could generate about the same amount of traffic seen at the Fred Meyer store at 18805 State Route 2.

That store is not far from where the Walmart is proposed. The city has been preparing for development in the North Kelsey area for a few years, Wright said.

“With retail growth, there’s an obvious growth in traffic. We planned to increase capacity along with that growth,” Wright said.

The city started in 2006 to make changes in the area, such as creating an east-west connecting route at Tjerney Place and two additional turn lanes at the intersections of U.S. 2 with Chain Lake Road and North Kelsey Street.

With that work done, the new Walmart is projected to sustain 835 evening peak trips to the store. This is about 100 more than what the developer presented in January.

The city has invested at least $6.27 million for eight projects in the area, with two more still to start. The two projects are a traffic light at North Kelsey Street and West Main Street and a roundabout at Chain Lake Road. They are scheduled to be completed by 2013.

Wal-Mart will pay for a share of the traffic mitigation work but it is unknown how much, operations director Brad Feilberg said.

The proposed design for the store will have four driveways. There would be one on North Kelsey Street and three on Galaxy Way, one of them being used for deliveries.

The development is planned to be occupied by 2014.

The 11-page traffic study was done by Transpo Group, a traffic analysis company based in Kirkland.

Alejandro Dominguez: 425-339-3422; adominguez@heraldnet.com.

Public hearing

A public hearing about the city’s development agreement with Sabey Corp. is scheduled for Tuesday’s City Council meeting at 7 p.m. in the council chambers of City Hall, 806 W. Main St.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

(City of Everett)
Everett’s possible new stadium has a possible price tag

City staff said a stadium could be built for $82 million, lower than previous estimates. Bonds and private investment would pay for most of it.

Jennifer Humelo, right, hugs Art Cass outside of Full Life Care Snohomish County on Wednesday, May 28, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
‘I’ll lose everything’: Snohomish County’s only adult day health center to close

Full Life Care in Everett, which supports adults with disabilities, will shut its doors July 19 due to state funding challenges.

The age of bridge 503 that spans Swamp Creek can be seen in its timber supports and metal pipes on Wednesday, May 15, 2024, in Lynnwood, Washington. The bridge is set to be replaced by the county in 2025. (Ryan Berry / The Herald)
Snohomish County report: 10 bridges set for repairs, replacement

An annual report the county released May 22 details the condition of local bridges and future maintenance they may require.

The Edmonds City Council gathers to discuss annexing into South County Fire on Tuesday, Dec. 3, 2024 in Edmonds, Washington. (Olivia Vanni / The Herald)
Community group presents vision for Edmonds’ fiscal future

Members from Keep Edmonds Vibrant suggested the council focus on revenue generation and a levy lid lift to address its budget crisis.

Cars drive along Cathcart Way next to the site of the proposed Eastview Village development that borders Little Cedars Elementary on Wednesday, May 7, 2025 in unincorporated Snohomish, Washington. (Olivia Vanni / The Herald)
Former engineer: Snohomish County rushed plans for Eastview development

David Irwin cited red flags from the developers. After he resigned, the county approved the development that’s now stalled with an appeal

People listen as the Marysville School Board votes to close an elementary and a middle school in the 2025-26 school year while reconfiguring the district’s elementary schools to a K-6 model on Wednesday, Jan. 22, 2025 in Marysville, Washington. (Olivia Vanni / The Herald)
Marysville schools audit shows some improvement

Even though the district still faces serious financial problems, the findings are a positive change over last year, auditors said.

Outside of the Madrona School on Monday, Aug. 26, 2024 in Edmonds, Washington. (Olivia Vanni / The Herald)
Sewer district notifies Edmonds schools of intent to sue

The letter of intent alleges the school district has failed to address long-standing “water pollution issues” at Madrona K-8 School.

Providence Regional Medical Center Everett. (Olivia Vanni/The Herald)
Providence Everett plans to reduce certified nursing assistants

Nursing assistants at Providence Regional Medical Center Everett have until Thursday to accept a voluntary severance package.

A firefighting helicopter carries a bucket of water from a nearby river to the Bolt Creek Fire on Saturday, Sep. 10, 2022, on U.S. 2 near Index, Washington. (Ryan Berry / The Herald)
How Snohomish County property owners can prepare for wildfire season

Clean your roofs, gutters and flammable material while completing a 5-foot-buffer around your house.

Nedra Vranish, left, and Karen Thordarson, right browse colorful glass flowers at Fuse4U during Sorticulture on Friday, June 7, 2024, in Everett, Washington. (Olivia Vanni / The Herald)
Everett’s Sorticulture festival starts Friday

Festivities will include art classes, garden vendors and live music.

Logo for news use featuring Snohomish County, Washington. 220118
11-year-old, teen injured in Snohomish County shooting

The 11-year-old is in critical condition, the sheriff’s office said. Investigators believe the shooting was gang related.

Madison Family Shelter Family Support Specialist Dan Blizard talks about one of the pallet homes on Monday, May 19, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Madison Family Shelter reopens after hiatus

The Pallet shelter village, formerly Faith Family Village, provides housing for up to eight families for 90 days.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.