Heraldnet.com
SATURDAY, JULY 4, 2009 10:27 pm
LocalNorthwestNation & WorldPoliticsSpecial ReportsPhotosColumnistsMultimedia 
RECENT POSTS:
Tests continue on Boeing's 787  July 2

Governor considers trip to Boeing's Chicago headquarters  July 1

More talk of second Boeing 787 line going elsewhere …  July 1

Paine Field plane spotters 'ruin' Air Canada's Olympic surprise  June 30

Boeing 787 will fly this year, readers say  June 30

Archives:
LINKS:

Airbus
Airbus
EADS
Orders and Deliveries

Analysts
Richard Aboulafia
Scott Hamilton

Blogroll
FleetBuzz
IAG Blog
Randy Tinseth's blog

Flight museum
Future of Flight
Museum of Flight

Labor Group
International Association of Machinists
Local 751 Machinists
SPEEA

Tanker competition
Air Force
Boeing's KC-767 tanker
Boeing's tanker blog
Government Accountability Office
Northrop's America's New Tanker
Northrop-EADS' KC-30

The Boeing Co.
Boeing Commercial Airplanes
Employment
New Airplane
Orders and Deliveries
RELATED ARTICLES:
Inslee downplays fears Boeing will send second 787 line elsewhere  July 4
Boeing's 6-month tally: 1 net order  July 3
Northwest aerospace uses Paris Air Show to make its case  June 29
Questions about 787 deserve answers  June 29
Biz Bits  June 29
Nation, World Briefs: Boeing rocket lifts weather satellite  June 28
Tampa runway closed after 737's tires blow  June 27
Smoke spurs 737 to make emergency landing  June 26
Search for Airbus flight recorders likely to go on  June 26
Qantas cancels order for 15 Boeing 787 Dreamliners  June 26
Interactive
Special report
 

ADVERTISEMENT

Aerospace Blog


 
 

Second Boeing strike looming? SPEEA gears up for negotiations -- updated


Posted at 12:54 pm by Michelle Dunlop

Based on Boeing engineers’ comments in SPEEA’s latest monthly magazine, you might get the feeling that Boeing has a second strike brewing.

The Society of Professional Engineering Employees in Aerospace is getting ready to head into serious negotiations with the Boeing Co. later this month. The union has been surveying members on SPEEA’s proposal, submitted in early September.

Last week, Boeing and SPEEA reviewed salary information, as Boeing’s negotiator, Doug Kight, wrote about in this memo. SPEEA officials have been frustrated by what they call a lack of information sharing on salary and benefits.

The comments from (unidentified) SPEEA members sound fairly similar to those of Machinists before the IAM started intense contract talks with Boeing earlier this fall.

From SPEEA members:

“No more offshore-outsourcing. The company is getting killed financially with the outsourcing.”

“I bet Doug Kight popped like a gerbil in a microwave when he read this proposal. I will not accept additional costs and risks snuck in the back door.’”

“I am very disillusioned by the tactics Boeing is taking .This management is destroying the best of Boeing.”

“At this time, I personally find no reason to work a significant amount of overtime because of how little we earn for being away from our families.”


“Looks like it’s time to get the walking boots out again.”


UPDATE -- 5:35 p.m.

Boeing has added some interesting video on its SPEEA negotiation page about the design and build of the next new aircraft.

In one video, Boeing's Mike Denton responds to the question of whether it would be best for Boeing to retain some production of the fuselage or wings on the next new aircraft. Denton's answer: yes, but Boeing hasn't determined which section, or how much of it, that will be.
READER COMMENTS
Be the first to comment.
You must be a registered user and verify your e-mail address to post comments to blogs or articles on HeraldNet.

To register, click here. To read other terms and conditions, click here.
Click here to see all Aerospace Blog comments
Log in or register to post new commentLog out
  Return to Aerospace Blog
TODAY'S TOP JOBS
 View All Top Jobs 
Top Cars
Top Homes


ADVERTISEMENT