Components of downtown Marysville’s new stormwater treatment facility can be seen from the walkway on Thursday, July 11, 2024, in Marysville, Washington. While much of the treatment and filtering happens out of sight, visitors of the area will see troughs, left, spilling water out onto the surrounding landscape, which soaks up the filtered water before it makes its way into Ebey Slough. Overflow grates, right, help alleviate flooding during heavy rains. (Ryan Berry / The Herald)

Components of downtown Marysville’s new stormwater treatment facility can be seen from the walkway on Thursday, July 11, 2024, in Marysville, Washington. While much of the treatment and filtering happens out of sight, visitors of the area will see troughs, left, spilling water out onto the surrounding landscape, which soaks up the filtered water before it makes its way into Ebey Slough. Overflow grates, right, help alleviate flooding during heavy rains. (Ryan Berry / The Herald)

At new Marysville water treatment facility, plants filter out pollutants

City officials expect the $14 million project to clean 110 million gallons of water every year, reducing harm to wildlife.

MARYSVILLE — The city’s new stormwater treatment plant isn’t landmarked by large tanks and pipes — or any buildings for that matter.

Near the shore of Ebey Slough, the plant — charged with treating 460 acres of urban runoff — looks like a park, with paved walkways and rows of native grasses.

The facility at 1304 First St. in Marysville incorporates new filtering technology never before seen at this scale, city officials said.

Inspired by a similar plant in Tacoma, the park designed by engineering companies Contech and Parametrix prevents pollutants like oils, fertilizers and pesticides from entering Ebey Slough and harming aquatic life.

An interpretive sign describes the filtration process used at the downtown Marysville stormwater treatment plant on Thursday, July 11, 2024, in Marysville, Washington. (Ryan Berry / The Herald)

An interpretive sign describes the filtration process used at the downtown Marysville stormwater treatment plant on Thursday, July 11, 2024, in Marysville, Washington. (Ryan Berry / The Herald)

Runoff from downtown Marysville flows into an underground pipe system, directing the water to vaults where heavy debris, like dirt, sinks to the bottom. Then the runoff seeps into the garden’s channels — metal troughs patterned with rows of grasses. As the troughs overflow, water trickles in between stones and plants, sinking into what is called a “media filter” layer made of gravel and mulch. From there, the treated water spills out into Ebey Slough and eventually Puget Sound.

Experts familiar with the project expect the plant to clean 110 million gallons of water every year. The treatment plant, completed in May, cost the city about $14 million, with $7.6 million from state Department of Ecology grants.

If contractors had built a more traditional water treatment plant, “it would have required a larger footprint,” said Steven Miller, the city’s senior project manager.

Senior Project Manager Steven Miller leans over to show the soil that filters stormwater at the downtown stormwater treatment plant on Thursday, July 11, 2024, in Marysville, Washington. (Ryan Berry / The Herald)

Senior Project Manager Steven Miller leans over to show the soil that filters stormwater at the downtown stormwater treatment plant on Thursday, July 11, 2024, in Marysville, Washington. (Ryan Berry / The Herald)

Workers would have had to develop more land and seek permission from BNSF Railway to construct a small channel under nearby railroad tracks.

Instead, the project “fit like a puzzle piece” next to Ebey Waterfront Park on a half-acre plot the city purchased in 2010, Miller said.

Project partners wanted to make the facility accessible, as a part of Marysville’s larger plan to develop the waterfront along Ebey Slough. City leaders have floated the idea of developing a $73 million sports hub there with hundreds of apartments and hotel rooms.

A section of downtown Marysville’s stormwater treatment facility is seen on Thursday, July 11, 2024, in Marysville, Washington. From the street, the facility mainly appears to be a park, but stormwater from downtown is being filtered below ground before spilling into the green space visitors can see. (Ryan Berry / The Herald)

A section of downtown Marysville’s stormwater treatment facility is seen on Thursday, July 11, 2024, in Marysville, Washington. From the street, the facility mainly appears to be a park, but stormwater from downtown is being filtered below ground before spilling into the green space visitors can see. (Ryan Berry / The Herald)

Untreated stormwater runoff is “the leading threat to Washington’s urban waters,” according to the state Department of Ecology. Chemicals, trash and animal manure accumulate in rain and snow melt, journeying over roofs and paved roads before discharging into rivers and lakes.

The pollutants can damage salmon and shellfish habitat, as well as contaminate groundwater and public swimming areas.

A chemical that helps car tires last longer, 6PPD, is lethal to coho salmon, endangering the fish when they migrate near stormwater runoff drains.

Green infrastructure like Marysville’s new treatment facility may help reduce wildlife exposure to 6PPD. Researchers are currently analyzing whether the new filtering technology used at the park can remove this specific contaminant, Miller said.

In the future, city staff will need to occasionally replace the mulch and plants at the treatment facility, Miller said. But other than that, the plant will require little maintenance.

Ta’Leah Van Sistine: 425-339-3460; taleah.vansistine@heraldnet.com; Twitter: @TaLeahRoseV.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Olivia Vanni / The Herald 
The Mukilteo Lighthouse. Built in 1906, it’s one of the most iconic landmarks in Snohomish County.
The Mukilteo Lighthouse. Built in 1906, it’s one of the most iconic landmarks in Snohomish County. (Olivia Vanni / The Herald)
Mukilteo mayor vetoes council-approved sales tax

The tax would have helped pay for transportation infrastructure, but was also set to give Mukilteo the highest sales tax rate in the state.

Marysville Mayor Jon Nehring gives the state of the city address at the Marysville Civic Center on Wednesday, Jan. 31, 2024, in Marysville, Washington. (Ryan Berry / The Herald)
Marysville council approves interim middle housing law

The council passed the regulations to prevent a state model code from taking effect by default. It expects to approve final rules by October.

x
State audit takes issue with Edmonds COVID grant monitoring

The audit report covered 2023 and is the third since 2020 that found similar issues with COVID-19 recovery grant documentation.

Bothell
Bothell man pleads guilty to sexual abuse of Marysville middle schoolers

The man allegedly sexually assaulted three students in exchange for vapes and edibles in 2022. His sentencing is set for Aug. 29.

Larsen talks proposed Medicaid cuts during Compass Health stop in Everett

Compass Health plans to open its new behavioral health center in August. Nearly all of the nonprofit’s patients rely on Medicaid.

A wall diagram shows the “journey of the ballot” at the new Elections Center on Tuesday, July 9, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
County Auditor: No need for feds to meddle with state or local elections

Garth Fell’s comments were in response to a report of Justice Department mulling criminal charges against election officials.

Edmonds Police Chief Loi Dawkins speaks after the city council approved her appointment on Tuesday, July 8, 2025 in Edmonds, Washington. (Olivia Vanni / The Herald)
Edmonds City Council confirms new police chief

Assistant Chief Loi Dawkins will begin in the role Aug. 1. She has more than 23 years of law enforcement experience, including three years in Edmonds.

Community members gather for the dedication of the Oso Landslide Memorial following the ten-year remembrance of the slide on Friday, March 22, 2024, at the Oso Landslide Memorial in Oso, Washington. (Ryan Berry / The Herald)
The Daily Herald garners 6 awards from regional journalism competition

The awards recognize the best in journalism from media outlets across Alaska, Idaho, Montana, Oregon and Washington.

The Edmonds City Council discuss the levy during a city council meeting on Tuesday, July 8, 2025 in Edmonds, Washington. (Olivia Vanni / The Herald)
Edmonds votes to place levy lid lift on the ballot

By a vote of 5-2, the council decided to put the $14.5 million property tax levy lid lift to voters in November.

A trash hauler from Republic Services. (Provided photo)
Growing Teamsters strike disrupts garbage pickup in Snohomish County

Republic Services said a temporary work stoppage is causing some customers in the county to experience “temporary service delays.”

Lily Lamoureux stacks Weebly Funko toys in preparation for Funko Friday at Funko Field in Everett on July 12, 2019.  Kevin Clark / The Herald)
Everett-based Funko ousts its CEO after 14 months

The company, known for its toy figures based on pop culture, named Michael Lunsford as its interim CEO.

‘Courageous’ teen dives into Silver Lake to rescue 11-year-old

Gauge Bryant, 13, brought the child to the surface. The 11-year-old is in stable but critical condition, authorities said.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.