Iran’s Russian reactor startup delayed, reports indicate

MOSCOW — Moscow today dashed Iranian hopes that a Russian-built nuclear reactor will be switched on this year, a blow to Tehran amid persistent tension over its nuclear program.

Officials in Russia and Iran had previously announced plans to switch on the reactor at the southern port of Bushehr this year, giving Iran its first operating nuclear power plant decades after construction started.

“We expect serious results by the end of the year, but the launch itself will not happen,” Russia’s state-run RIA Novosti news agency quoted Russian Energy Minister Sergei Shmatko as saying. ITAR-Tass and Interfax had similar reports.

According to the reports, Shmatko blamed the delay on technical issues, but analysts say Moscow has used the project to press Tehran to ease its defiance over its nuclear program.

Iran says the program is purely peaceful, while the U.S. and allies claim Tehran is working to develop nuclear weapons. Russia also says Iran must not acquire nuclear weapons, but it has close ties with Tehran and has used its position as a veto-wielding permanent U.N. Security Council member to water down Western-backed sanctions.

Shmatko’s remarks came a day after President Barack Obama pushed for continued pressure on Iran and its nuclear program. During talks with his Russian counterpart Dmitry Medvedev in Singapore Obama said that “time is running out” for Iran to sign on to a deal with the International Atomic Energy Agency.

Since September, Medvedev has suggested Russia could support further sanctions against if it did not open its nuclear program to inspections to prove it was not trying to build a bomb. He spoke in similar terms Sunday, avoiding the word sanctions but saying “other options remain on the table” if Iran does not meet its obligations.

Shmatko said construction is proceeding as planned at Bushehr and Russia “is certain that it will fulfill its commitments to Iran,” according to RIA Novosti.

But his remarks raised hackles in Iran, already angry over Russia’s foot-dragging on fulfilling a 2007 contract to provide S-300 surface-to-air missiles to Tehran — another deal seen as a Russian lever in relations with Iran.

The semiofficial Mehr news agency quoted the head of Iran’s parliamentary committee on national interests and foreign policy, Alaeddin Boroujerdi, as saying that “this hasty expression by (the) Russian energy minister does not look normal.”

He urged Iranian nuclear officials to react to the remarks.

Construction of the Bushehr plant started in the 1970s but was abandoned after Iran’s 1979 Islamic Revolution. Russia pledged to build it in a $1 billion deal sealed in the mid-1990s.

Meanwhile, Iranian technicians have moved highly sophisticated technical equipment into a previously secret uranium enrichment site in preparation for starting it up in 2011, the International Atomic Energy Agency said in a new report today.

The report offered no estimate of the new plant’s capabilities but a senior international official familiar with the watchdog agency’s work in Iran said that it appeared designed to produce about a ton of enriched uranium a year. That would be enough for a nuclear warhead but too little to fuel the nearly finished plant at the southern port of Bushehr and other civilian reactors Iran is planning to bring on line in the coming years.

The IAEA also noted that Iran’s enrichment at the Natanz site — revealed by dissidents in 2002 and under agency monitoring — was stagnating, with output remaining at mid-2009 levels.

The report did not offer a reason. But the official suggested that nuclear experts previously working at Natanz could now be preoccupied with putting the finishing touches on the newly discovered site, called Fordo.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Damian Flores, 6, kisses his mother Jessica Flores goodbye before heading inside for his first day of first grade at Monroe Elementary School on Wednesday, Aug. 27, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
‘It’s like the Super Bowl’: Everett celebrates first day of school

Students at Monroe Elementary were excited to kick off the school year Wednesday along with other students across the district.

Traffic moves along Bowdoin Way past Yost Park on Monday, Aug. 25, 2025 in Edmonds, Washington. (Olivia Vanni / The Herald)
A new online tool could aid in local planning to increase tree coverage

The map, created by Washington Department of Natural Resources and conservation nonprofit American Forests, illustrates tree canopy disparities across the state.

Logo for news use featuring Snohomish County, Washington. 220118
Snohomish PUD preps for more state home electrification funding

The district’s home electrification rebate program distributed over 14,000 appliances last year with Climate Commitment funds.

Logo for news use featuring the municipality of Everett in Snohomish County, Washington. 220118
One person dead in single-vehicle crash on Wednesday in Everett

One man died in a single-vehicle crash early Wednesday morning… Continue reading

A firefighter moves hazard fuel while working on the Bear Gulch fire this summer. Many in the wildland fire community believe the leadership team managing the fire sent crews into an ambush by federal immigration agents. (Facebook/Bear Gulch Fire 2025)
Firefighters question leaders’ role in Washington immigration raid

Wildfire veterans believe top officials on the fire sent their crews into an ambush.

More frequent service coming for Community Transit buses

As part of a regular update to its service hours, the agency will boost the frequencies of its Swift lines and other popular routes.

More than $1 million is available for housing-related programs in Snohomish County, and the Human Services Department is seeking applications. (File photo)
Applicants sought for housing programs in Snohomish County

More than $1 million is available for housing-related programs in… Continue reading

Glacier Peak, elevation 10,541 feet, in the Glacier Peak Wilderness of Mount Baker–Snoqualmie National Forest in 2019 in Snohomish County. (Caleb Hutton / The Herald)
Hot and dry weather sparks red flag, extended burn ban

National Weather Service issues red flag warning and elevated fire watch days after county fire marshal extends ban burn.

Vehicles pack the line for the Mukilteo-Clinton ferry as they wait to board on Wednesday, May 29, 2024, in Mukilteo, Washington. (Ryan Berry / The Herald)
How the Mukilteo-Clinton ferry route will get an electric upgrade

The state will electrify the Clinton terminal as the route is set to receive the state’s first new hybrid-electric ferry by 2030.

Logo for news use featuring the municipality of Snohomish in Snohomish County, Washington. 220118
One dead in a single vehicle motorcycle crash on Saturday

First responders pronounced the 67-year-old driver deceased at the scene

Marysville
Marysville seeks comment on its low-income funding

The city council invites the public to review its use of federal money and speak at a hearing Sept. 8.

Everett lowers speed limits on two streets

Parts of Holly Drive and 16th Street are now limited to 25 miles per hour. Everett will eventually evaluate all of the city’s speed limits as part of a larger plan.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.