New Mars rover may run $2 billion

LOS ANGELES — NASA said Friday it will press ahead with plans to launch a supersized rover to Mars next year despite spiraling costs and schedule pressures.

The decision to maintain the status quo — at least for now — came after the space agency’s top managers met to mull over the progress of the Mars Science Laboratory, a souped-up, nuclear-powered rover.

Concerns have been raised about how to pay for the project’s escalating costs and whether engineers can ready the rover in time for a safe launch next fall. NASA has poured $1.5 billion into the project, but the final price tag is expected to be close to $2 billion.

ADVERTISEMENT
0 seconds of 0 secondsVolume 0%
Press shift question mark to access a list of keyboard shortcuts
00:00
00:00
00:00
 

Doug McCuistion, who heads the Mars exploration program at NASA headquarters, said significant work lies ahead and the space agency will revisit the mission’s progress in January.

Meanwhile, “our intent is to keep our eye on the ball and keep pressing” for a 2009 liftoff, McCuistion said.

The Mars Science Lab is designed to roam the Martian plains and study rocks to determine whether the environment could support microbial life. It will carry a suite of powerful instruments that can probe rocks and soil in finer detail than previous missions including a laser that can zap boulders from a distance.

Scientists expect the six-wheel, SUV-size rover to build on the successes of twin rovers, which have uncovered geologic evidence of ancient water on the planet, and the Phoenix lander, which recently confirmed the presence of ice at its Martian north pole landing site.

Developing such a scientifically capable spacecraft has proven to be a challenge for engineers at NASA’s Jet Propulsion Laboratory, which manages the mission. Earlier this year, engineers had to redesign the craft’s heat shield and fix problems with the parachute. The mission’s timetable has also been affected by delays in the delivery of motor parts.

In recent public meetings, ­McCuistion noted that the Mars Science Lab would likely cause “financial collateral damage” to other space missions to pay for cost overruns.

A group of scientists that advises NASA on planetary missions called this week for an outside investigation into the Mars Science Lab’s financial troubles. The scientists noted that the pricey project was a “poor model for future missions.”

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Edmonds Mayor Mike Rosen goes through an informational slideshow about the current budget situation in Edmonds during a roundtable event at the Edmonds Waterfront Center on Monday, April 7, 2025 in Edmonds, Washington. (Olivia Vanni / The Herald)
Edmonds mayor recommends $19M levy lid lift for November

The city’s biennial budget assumed a $6 million levy lid lift. The final levy amount is up to the City Council.

Community members gather for the dedication of the Oso Landslide Memorial following the ten-year remembrance of the slide on Friday, March 22, 2024, at the Oso Landslide Memorial in Oso, Washington. (Ryan Berry / The Herald)
The Daily Herald garners 6 awards from regional journalism competition

The awards recognize the best in journalism from media outlets across Alaska, Idaho, Montana, Oregon and Washington.

A firefighting helicopter carries a bucket of water from a nearby river to the Bolt Creek Fire on Saturday, Sep. 10, 2022, on U.S. 2 near Index, Washington. (Ryan Berry / The Herald)
How Snohomish County property owners can prepare for wildfire season

Clean your roofs, gutters and flammable material while completing a 5-foot-buffer around your house.

(City of Everett)
Everett’s possible new stadium has a possible price tag

City staff said a stadium could be built for $82 million, lower than previous estimates. Bonds and private investment would pay for most of it.

Jennifer Humelo, right, hugs Art Cass outside of Full Life Care Snohomish County on Wednesday, May 28, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
‘I’ll lose everything’: Snohomish County’s only adult day health center to close

Full Life Care in Everett, which supports adults with disabilities, will shut its doors July 19 due to state funding challenges.

The age of bridge 503 that spans Swamp Creek can be seen in its timber supports and metal pipes on Wednesday, May 15, 2024, in Lynnwood, Washington. The bridge is set to be replaced by the county in 2025. (Ryan Berry / The Herald)
Snohomish County report: 10 bridges set for repairs, replacement

An annual report the county released May 22 details the condition of local bridges and future maintenance they may require.

The Edmonds City Council gathers to discuss annexing into South County Fire on Tuesday, Dec. 3, 2024 in Edmonds, Washington. (Olivia Vanni / The Herald)
Community group presents vision for Edmonds’ fiscal future

Members from Keep Edmonds Vibrant suggested the council focus on revenue generation and a levy lid lift to address its budget crisis.

Patrick Russell, left, Jill Russell and their son Jackson Russell of Lake Stevens enjoy Dick’s burgers on their way home from Seattle on Friday, Sept. 22, 2023 in Edmonds, Washington. The family said the announcement of the Dick’s location in Everett “is amazing” and they will be stopping by whenever it opens in 2025. (Olivia Vanni / The Herald)
Dick’s Drive-In announces details for Thursday’s grand opening in Everett

Dick’s will celebrate its second Snohomish County location with four days of festivities.

Washington’s Supreme Court slashes public defender caseload limits

The changes will take effect Jan. 1, but local governments get a decade to comply. For cash-strapped counties, it may not be enough time without more state aid.

Washington stuck mid-pack in national education ranking

The new report underscores shortfalls in reading and math proficiency. Still, the state’s top school official says data show progress recovering from the pandemic.

Marysville is planning a new indoor sports facility, 350 apartments and a sizable hotel east of Ebey Waterfront Park. (Olivia Vanni / The Herald)
New report shifts outlook of $25M Marysville sports complex

A report found a conceptual 100,000-square-foot sports complex may require public investment to pencil out.

x
Edmonds seeks applicants for planning board alternate

The member would attend and participate in meetings and vote when another member is absent. Applications close June 25.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.